Solutions by application
Every system below starts from the same three questions: how much demand, when does it peak, and what does the site allow. The configuration follows the answers, not the other way round.
| Application | Typical configuration | What drives the sizing |
|---|---|---|
| Hotel / guesthouse | Commercial circulating heat pump units + insulated storage tank + variable-frequency supply | Room count, occupancy pattern, 24-hour availability, peak-hour draw-off |
| School / university dormitory | Parallel heat pump units + large buffer tank + central or floor-level supply | Number of boarders, fixed morning/evening shower windows, holiday turndown |
| Hospital | Redundant heat pump units + storage + hot water circulation loop | Continuous demand, hygiene requirements, no single point of failure |
| Factory dormitory / canteen | Heat pump units + storage + timed supply | Shift pattern, simultaneous bathing load, canteen hot water |
| Swimming pool | Pool heating heat pump + filtration interface + cover strategy | Pool volume, water temperature setpoint, surface heat loss, air temperature |
| Aquaculture | Heat pump with corrosion-resistant heat exchanger + temperature control | Pond volume, target temperature, make-up water rate, ambient extremes |
| Process cooling | Air-cooled or water-cooled chiller + chilled water loop | Cooling load profile, required supply temperature, part-load behavior |
| Municipal sludge | Heat-pump drying line + odor control + condensate connection | Daily wet tonnage, inlet/outlet moisture, disposal route |
| Industrial sludge | Continuous belt dryer + pre-treatment + discharge | Sludge type and hazard classification, operating hours, target dryness |
Three sizing rules that prevent most problems
1. Size on the worst week, not the average year. Heat pump capacity falls with ambient temperature; hot water demand rises in cold weather. Sizing on nominal capacity at 20 °C ambient will fail in January.
2. Separate storage from generation. Generation capacity is sized for daily energy; storage volume is sized for peak-hour flow. Mixing the two produces systems that are either oversized or short of hot water at 7 a.m.
3. Write the assumptions into the proposal. Inlet water temperature, ambient design condition, operating hours, load factor and simultaneity factor should appear in the document. Without them, a performance discussion has no common reference.
What we deliver with a solution
- Sizing calculation with inputs and assumptions stated
- Equipment list with model, capacity and electrical load
- Interface drawings (civil, structural, electrical, piping)
- Piping and instrumentation schematic
- Commissioning checklist and measured handover data
- Operation and maintenance manual, spare-part list
Start with your data
Send what you have — even partial information is enough to start:
- Daily hot water volume (tonnes) or cooling load (kW)
- Peak demand window and simultaneity
- Inlet water temperature and required outlet temperature
- Local winter ambient design temperature
- Sludge tonnage and moisture content (for drying projects)
- Available power supply, plant room or roof area