Delivered projects
115 commercial hot water projects have been delivered across nine provinces, the great majority in hotels, guesthouses and similar hospitality premises. The table below is the actual distribution of the reference list, not a rounded claim.
By province
| Province / region | Projects |
|---|---|
| Hunan | 41 |
| Guangdong | 27 |
| Zhejiang | 17 |
| Fujian | 13 |
| Guangxi | 6 |
| Jiangxi | 5 |
| Guizhou | 3 |
| Yunnan | 2 |
| Shandong | 1 |
| Total | 115 |
By application
| Application | Projects |
|---|---|
| Hotel / guesthouse / inn | 64 |
| Industrial campus dormitory | 18 |
| Beauty and foot-spa premises | 13 |
| School / college | 11 |
| Other commercial premises | 5 |
| Hospital / medical | 4 |
| Total | 115 |
What a reference actually tells you
A reference list is only useful if it lets you check three things: whether the application resembles yours, whether the installation has been running long enough to prove itself, and whether the owner would specify the same equipment again.
For each project we can provide, under a mutual confidentiality arrangement: location at city level, application type, installed capacity, model, commissioning date and, where the owner consents, a contact for a reference call.
Customer names and exact addresses are withheld from the public site. Publishing a client’s name and street address without consent is a privacy problem, and it is also a poor signal of how a supplier treats its customers.
Representative project profiles
Hospitality — Fenghuang, Hunan
A guesthouse in the old town area of Fenghuang, Xiangxi. Hospitality demand is characterized by high seasonality: near-full occupancy in holiday periods, low occupancy mid-week. The system therefore emphasizes storage volume over generation capacity, so the morning peak is met from the tank rather than from a unit sized for the worst hour of the year.
Design points: storage sized to cover the peak draw-off window; heat pump capacity sized for daily energy including standby losses; noise and visual impact considered because the plant sits close to guest rooms.
Education — college dormitory, Guangdong
A dormitory block with fixed morning and evening shower windows. Because demand is concentrated into two short periods, the simultaneity factor dominates the calculation — a system sized on daily average flow will run short every evening.
Design points: buffer tank sized on peak-hour flow; parallel units staged so part-load operation remains efficient outside the peak windows; holiday turndown mode to avoid standing losses.
Industrial — factory campus dormitory, Zhejiang
Continuous shift operation with a large simultaneous bathing load at shift change. Reliability matters more than the last percentage point of efficiency, because a hot water failure affects the whole shift.
Design points: N+1 unit arrangement; separate heating and storage so maintenance can be carried out without a full shutdown; electrical load scheduled against the site’s available capacity.
Municipal — sludge drying line, Hubei
A wastewater plant needing volume reduction before off-site disposal. The design constraint is not the dryer itself but the downstream route: outlet moisture content is fixed by what the receiving facility will accept.
Design points: target moisture set by disposal route; odor control matched to the nearest sensitive receiver; condensate returned to the plant’s own treatment process.
Request the reference list
Tell us your application, province or country, and approximate scale. We will send the matching subset of the reference list and, where the owner agrees, arrange a reference call.