Configuration guidance for hotel, school, hospital, factory, pool, aquaculture and municipal sludge projects — what to size and which series to pick.

Solutions by application

Every system below starts from the same three questions: how much demand, when does it peak, and what does the site allow. The configuration follows the answers, not the other way round.

Application Typical configuration What drives the sizing
Hotel / guesthouse Commercial circulating heat pump units + insulated storage tank + variable-frequency supply Room count, occupancy pattern, 24-hour availability, peak-hour draw-off
School / university dormitory Parallel heat pump units + large buffer tank + central or floor-level supply Number of boarders, fixed morning/evening shower windows, holiday turndown
Hospital Redundant heat pump units + storage + hot water circulation loop Continuous demand, hygiene requirements, no single point of failure
Factory dormitory / canteen Heat pump units + storage + timed supply Shift pattern, simultaneous bathing load, canteen hot water
Swimming pool Pool heating heat pump + filtration interface + cover strategy Pool volume, water temperature setpoint, surface heat loss, air temperature
Aquaculture Heat pump with corrosion-resistant heat exchanger + temperature control Pond volume, target temperature, make-up water rate, ambient extremes
Process cooling Air-cooled or water-cooled chiller + chilled water loop Cooling load profile, required supply temperature, part-load behavior
Municipal sludge Heat-pump drying line + odor control + condensate connection Daily wet tonnage, inlet/outlet moisture, disposal route
Industrial sludge Continuous belt dryer + pre-treatment + discharge Sludge type and hazard classification, operating hours, target dryness

Three sizing rules that prevent most problems

1. Size on the worst week, not the average year. Heat pump capacity falls with ambient temperature; hot water demand rises in cold weather. Sizing on nominal capacity at 20 °C ambient will fail in January.

2. Separate storage from generation. Generation capacity is sized for daily energy; storage volume is sized for peak-hour flow. Mixing the two produces systems that are either oversized or short of hot water at 7 a.m.

3. Write the assumptions into the proposal. Inlet water temperature, ambient design condition, operating hours, load factor and simultaneity factor should appear in the document. Without them, a performance discussion has no common reference.

What we deliver with a solution

  • Sizing calculation with inputs and assumptions stated
  • Equipment list with model, capacity and electrical load
  • Interface drawings (civil, structural, electrical, piping)
  • Piping and instrumentation schematic
  • Commissioning checklist and measured handover data
  • Operation and maintenance manual, spare-part list

Start with your data

Send what you have — even partial information is enough to start:

  • Daily hot water volume (tonnes) or cooling load (kW)
  • Peak demand window and simultaneity
  • Inlet water temperature and required outlet temperature
  • Local winter ambient design temperature
  • Sludge tonnage and moisture content (for drying projects)
  • Available power supply, plant room or roof area