Support across the equipment life cycle
Before the order
- Demand and load calculation, with the assumptions written down
- Model selection and capacity check against local design conditions
- Energy consumption estimate and operating cost comparison
- Layout advice: plant room or roof area, airflow clearances, maintenance access
During design coordination
- CAD interface drawings for civil, structural, electrical and piping works
- Piping and instrumentation schematic, valve and fitting schedule
- Electrical load schedule and control interface description
- Submittal package for the consultant’s review
During installation
- Positioning, lifting and vibration isolation guidance
- Piping, insulation and wiring supervision points
- Pressure test and flushing sequence before commissioning
- Site queries answered by the engineer responsible for the project, not a call center
At commissioning
- Start-up checklist completed item by item
- Measured performance recorded at handover: supply and return temperatures, flow, power draw
- Control parameter set-up and alarm verification
- Operator training on daily operation, seasonal changeover and first-line fault response
After handover
- Scheduled maintenance: heat exchanger cleaning, filter replacement, refrigerant charge and leak check, safety-device testing
- Spare parts: compressors, fans, controllers, sensors, filters, valves
- Fault diagnosis by phone or video, with escalation to site attendance where needed
- Warranty terms and response times as agreed in the supply contract
Maintenance intervals that actually matter
| Item | Interval | Why |
|---|---|---|
| Clean evaporator / condenser | 6–12 months | Fouling is the most common cause of falling capacity and high-pressure trips |
| Replace air and water filters | 3–6 months | Cheap item, expensive consequences if neglected |
| Check refrigerant charge and leaks | Annually | Slow leaks degrade performance long before the unit alarms |
| Inspect electrical terminals and contactors | Annually | Loose terminals are a fire risk and a nuisance-trip source |
| Test safety devices | Annually | A safety device that does not trip is worse than none |
| Clean condensate drain (sludge dryers) | Monthly | Blocked drains cause wet sludge and odor complaints |
What to send when reporting a fault
- Model and serial number from the nameplate
- Installation date and commissioning record
- Current alarm code or controller display
- Supply and return temperatures, ambient temperature
- When the fault occurs — start-up, steady running, defrost, or a specific time of day
- Photographs of the installation and the controller screen
With those six items, most faults can be narrowed down without a site visit.
Documents
Operation and maintenance manuals, parameter sheets, wiring diagrams and spare-part lists are issued in PDF with each project. If you have lost a copy, send the model and serial number and we will reissue it.