Pre-sales sizing, interface drawings, installation guidance, commissioning, operator training, maintenance and spare parts for all three product lines.

Support across the equipment life cycle

Before the order

  • Demand and load calculation, with the assumptions written down
  • Model selection and capacity check against local design conditions
  • Energy consumption estimate and operating cost comparison
  • Layout advice: plant room or roof area, airflow clearances, maintenance access

During design coordination

  • CAD interface drawings for civil, structural, electrical and piping works
  • Piping and instrumentation schematic, valve and fitting schedule
  • Electrical load schedule and control interface description
  • Submittal package for the consultant’s review

During installation

  • Positioning, lifting and vibration isolation guidance
  • Piping, insulation and wiring supervision points
  • Pressure test and flushing sequence before commissioning
  • Site queries answered by the engineer responsible for the project, not a call center

At commissioning

  • Start-up checklist completed item by item
  • Measured performance recorded at handover: supply and return temperatures, flow, power draw
  • Control parameter set-up and alarm verification
  • Operator training on daily operation, seasonal changeover and first-line fault response

After handover

  • Scheduled maintenance: heat exchanger cleaning, filter replacement, refrigerant charge and leak check, safety-device testing
  • Spare parts: compressors, fans, controllers, sensors, filters, valves
  • Fault diagnosis by phone or video, with escalation to site attendance where needed
  • Warranty terms and response times as agreed in the supply contract

Maintenance intervals that actually matter

Item Interval Why
Clean evaporator / condenser 6–12 months Fouling is the most common cause of falling capacity and high-pressure trips
Replace air and water filters 3–6 months Cheap item, expensive consequences if neglected
Check refrigerant charge and leaks Annually Slow leaks degrade performance long before the unit alarms
Inspect electrical terminals and contactors Annually Loose terminals are a fire risk and a nuisance-trip source
Test safety devices Annually A safety device that does not trip is worse than none
Clean condensate drain (sludge dryers) Monthly Blocked drains cause wet sludge and odor complaints

What to send when reporting a fault

  1. Model and serial number from the nameplate
  2. Installation date and commissioning record
  3. Current alarm code or controller display
  4. Supply and return temperatures, ambient temperature
  5. When the fault occurs — start-up, steady running, defrost, or a specific time of day
  6. Photographs of the installation and the controller screen

With those six items, most faults can be narrowed down without a site visit.