Chilled Water Piping and Insulation: Sizing, Layout and Testing

Size on flow, then check velocity

Chilled water flow follows a fixed relationship:

Flow (m³/h) = capacity (kW) × 0.86 ÷ ΔT (K)

At the standard 7 °C supply and 12 °C return, ΔT is 5 K, so each 100 kW needs 17.2 m³/h.

Capacity Flow at ΔT 5 K Steel DN Velocity Pressure drop
100 kW 17.2 m³/h DN65 1.4 m/s 300 Pa/m
200 kW 34.4 m³/h DN80 1.9 m/s 350 Pa/m
350 kW 60.2 m³/h DN100 2.1 m/s 380 Pa/m
500 kW 86.0 m³/h DN125 2.0 m/s 340 Pa/m
800 kW 137.6 m³/h DN150 2.2 m/s 360 Pa/m
1,200 kW 206.4 m³/h DN200 1.8 m/s 300 Pa/m

The velocities above are typical for plant-room mains. Where a main runs through occupied space, go up one size to stay near 1.5 m/s.

Keep velocity below 1.5 m/s in mains serving occupied areas and below 2.4 m/s in plant rooms. Higher velocity costs pump energy on the way out and noise on the way back.

Layout rules that prevent most problems

Rule Reason
Pump on the return, not the supply Cooler water, longer seal life
Strainer on the return, 20 mesh, with blow-down Protects pump and evaporator
Air vent at every high point Air locks cause flow alarms
Drain at every low point and at each riser base Needed for maintenance
Balancing valve on each branch Flow has to be provable
Check valve on each pump discharge Prevents reverse flow through a standby pump
Flexible connector each side of the pump and chiller Vibration isolation
Thermometer and gauge either side of the chiller Commissioning and diagnostics

Primary and secondary pumping

Arrangement Suited to Watch out for
Constant flow, single pump set Small systems, stable load Wastes energy at part load
Primary variable flow Single chiller, VFD pump Minimum flow must be protected
Primary/secondary Multiple chillers Decoupler sizing and control
Primary variable with bypass Large variable load Bypass valve must be sized on minimum flow

Whatever the arrangement, the chiller has a minimum evaporator flow, typically 40%–60% of design. Below that, the leaving water temperature becomes unstable and the freeze protection may trip. A bypass valve across the supply and return, controlled on flow or differential pressure, is what protects it.

Air: the most common cause of a flow alarm

Symptom Cause Fix
Flow switch chatters at start Air at the pump Vent, check pump orientation
Pump noisy, current low Cavitation from air or low static head Raise static pressure, vent
Chiller trips on low evaporator temperature Reduced flow from an air lock Vent at the highest point
Uneven branch temperatures Air in a branch Fit automatic air vents at branch tops

Fill from the lowest point, with all high vents open, and fill slowly. On a large system, fill in stages: mains first, then risers, then branches. Run the pumps and vent again after the water has warmed, because dissolved air comes out of solution as temperature rises.

Insulation: thickness and the vapor barrier

Chilled water insulation has two jobs — control heat gain and keep the surface above dew point. The second is the one that fails visibly.

Pipe DN Insulation thickness Estimated surface temperature (26 °C ambient) Margin over a 22.3 °C dew point
25–40 30 mm about 23 °C 1 K — adequate, barrier critical
50–80 40 mm about 24 °C 2 K
100–150 50 mm about 24 °C 2 K
200+ 50–60 mm about 24 °C 2 K
Any, in a plant room at 90% RH One size up plus vapor barrier 23–24 °C Dew point is 24.4 °C at 26 °C and 90% RH — increase thickness

Use closed-cell elastomeric insulation with a continuous vapor barrier on the outside, and seal every joint with the manufacturer’s adhesive — not tape. A gap in the vapor barrier lets moist air reach the cold pipe, where it condenses, soaks the insulation and drips.

Component Detail
Hangers Insulated saddles, vapor barrier continuous over the saddle
Valves Pre-formed jackets, sealed
Flanges Jacket with overlap, sealed
Pipe ends Terminated with vapor-tight seal
Penetrations Sleeve, sealed both sides
Outdoor runs UV-resistant jacket plus metal cladding

Pressure testing and flushing

Test Pressure Duration Acceptance
Strength 1.5× working, min 0.6 MPa 10 min No drop, no leak
Tightness 1.0× working 2 h No visible drop
Flushing Design flow, 1.5 m/s Until strainer clean Clear water

Test before insulation. A leak found after insulation means removing and replacing it, which costs more than the test. Flush to a drain, bypassing the chiller and the coils, and clean the strainer repeatedly during the flush.

Water quality

Parameter Target Why
pH 7.5–9.0 Corrosion control
Conductivity Below 500 µS/cm Scale and corrosion indicator
Chloride Below 200 mg/L Pitting of stainless
Hardness 60–200 mg/L as CaCO3 Scale risk above
Glycol (if used) Per manufacturer Affects capacity and pump head
Inhibitor Per treatment program Annual test

Poor water quality is the main reason chillers lose capacity over five to ten years. A fouled evaporator shows up as a rising approach temperature — the difference between the leaving water and the saturated suction temperature — and it cannot be corrected by adding refrigerant.

Longkang Environmental Equipment Co., Ltd. supplies a pipework schedule with the chiller showing design flow, connection sizes and the minimum flow limit, so the bypass and the pump can be sized from the same document. Phone: +86 400-878-0280 | +86 130-0200-1280

Questions from site engineers

Can I use the same pipe size as the chiller connection?

Not necessarily. The connection size is the nozzle, not the design size. A 500 kW chiller may have DN125 nozzles while the main needs DN150 to keep pressure drop sensible. Size the main on flow and velocity.

Do I need a bypass on a constant-flow system?

No, if the flow is genuinely constant. But most systems become variable at part load, so fit a bypass valve with a minimum-flow setting and prove it operates during commissioning.

How thick should insulation be in a humid climate?

At least 50 mm on mains and 30 mm on small branches, with a sealed vapor barrier. In a plant room at 90% RH, even 50 mm can sweat at the supports if the barrier is broken there.

Is plastic pipe acceptable for chilled water?

PPR and PE-RT are used in some markets, but they need more supports, longer expansion loops and careful fusion joints. For large mains, steel is still the practical choice.

What causes condensation on the pipe surface?

Either the insulation is too thin for the humidity, the vapor barrier is broken, or the water temperature is below design. Check the surface temperature against the dew point before adding thickness.

How often should the strainer be cleaned?

During commissioning, daily for the first week; then quarterly. A blocked strainer is the most common cause of a low flow trip in the first year.