Step 1 — Build the cooling load
The cooling load is the sum of every heat gain that the chilled water must remove. For process cooling it is dominated by the equipment; for comfort cooling it is dominated by the building envelope and fresh air.
| Load component | Comfort cooling | Process cooling |
|---|---|---|
| Equipment heat | Office equipment, small | Dominant — machines, vessels, molds |
| People | 100–150 W sensible per person | Often negligible |
| Lighting | 10–20 W/m² | Per installed load |
| Solar and fabric gain | Significant, orientation dependent | Usually none |
| Fresh air | Large latent and sensible load | Depends on process |
| Process heat of reaction | None | Often dominant |
| Pump and fan heat | 2%–5% of load | Per process |
For comfort cooling, a cooling load calculation should follow the local design code and use the local design outdoor condition, not an assumed 35 °C. For process cooling, the heat balance comes from the process engineer, not from a rule of thumb.
Step 2 — Convert load into chilled water flow
Flow (m³/h) = kW ÷ (ΔT × 1.163)
For a 5 K chilled water range — the standard 7/12 °C — 1 m³/h carries 5.8 kW. A 350 kW chiller therefore needs about 60 m³/h. This flow figure drives pipe sizing, pump selection and the pressure drop through the evaporator, so it is worth calculating early.
| Cooling load | Flow at 5 K ΔT | Typical pipe size |
|---|---|---|
| 50 kW | 8.6 m³/h | DN65 |
| 100 kW | 17.2 m³/h | DN80 |
| 200 kW | 34.4 m³/h | DN100 |
| 350 kW | 60.2 m³/h | DN125 |
| 500 kW | 86 m³/h | DN150 |
Pipe sizes are indicative and depend on the allowable velocity and pressure drop; they are shown to make the scale concrete, not to replace hydraulic design.
Step 3 — Correct for actual operating conditions
Catalog capacity is quoted at standard conditions: 7/12 °C chilled water, 35 °C ambient for air-cooled units, or 30/35 °C condenser water for water-cooled units. Three corrections usually apply.
Ambient correction. Air-cooled capacity falls as ambient temperature rises. A machine rated at 35 °C may deliver 5%–10% less at 43 °C, and more in extreme conditions.
Glycol correction. Below 0 °C, the secondary loop needs glycol, which has lower specific heat and higher viscosity than water. A 30% propylene glycol solution reduces capacity by roughly 5%–10% and increases pump power noticeably.
Fouling and altitude. A fouling allowance of 5%–10% on the evaporator and condenser is normal practice for open systems. At altitude above 1,000 m, air-cooled capacity falls because air density is lower — around 10% at 1,500 m.
| Correction | Typical effect on capacity |
|---|---|
| Ambient 35 °C → 43 °C (air-cooled) | −5% to −10% |
| 30% propylene glycol | −5% to −10% |
| Fouling allowance | −5% to −10% of design margin |
| Altitude 1,500 m (air-cooled) | −8% to −12% |
Step 4 — Decide the safety margin deliberately
A margin is a hedge against uncertainty, so it should be proportional to the uncertainty. A load calculated from a complete process heat balance needs 5%; a load estimated from floor area needs 15%–20% and a note saying so.
Blanket margins compound: a 20% margin on the load, a 10% margin on the correction, and a 10% margin on the selection produce a machine that is 45% oversized — running at low load, cycling, and performing well below its rated efficiency.
Step 5 — Check part-load behavior
A chiller selected exactly at peak load will operate below 50% for most of the year. Two consequences follow: the machine must be able to modulate down without cycling, and the selection should be checked against IPLV rather than COP alone.
| Load profile | Selection preference |
|---|---|
| Steady, near full load (process) | Highest full-load COP |
| Wide variation, long hours (HVAC) | Highest IPLV, screw or centrifugal with VSD |
| Very low night load | Multiple smaller units, or a dedicated small machine |
| Redundancy required | N+1 with staged sequencing |
Step 6 — Verify the practical constraints
- Electrical: starting current, available capacity, harmonic distortion if VSDs are used.
- Space and weight: plant room access, roof structural capacity, maintenance clearance for tube removal.
- Noise: sound pressure at the nearest receiver, not just the unit’s sound power level.
- Water: for water-cooled machines, tower capacity, make-up water quality and blowdown provisions.
- Refrigerant: charge limits, local regulation, and the phase-down schedule for the chosen refrigerant.
Worked example: 12,000 m² office building
| Step | Calculation | Result |
|---|---|---|
| Cooling load from load software | Given | 1,050 kW |
| Safety margin | 8% (well-defined load) | 1,134 kW |
| Design ambient | 38 °C | — |
| Ambient correction | ÷ 0.95 | 1,194 kW |
| Fouling allowance | ÷ 0.97 | 1,231 kW |
| Selected | 2 × 650 kW water-cooled screw | 1,300 kW installed |
| Chilled water flow | 1,300 ÷ (5 × 1.163) | 224 m³/h |
| Part-load check | IPLV at 0.55 weighting | Meets design target |
Two units rather than one gives partial redundancy and lets the plant run one machine at 85% instead of two at 42% during shoulder seasons.
Common sizing errors
| Error | Effect | Correction |
|---|---|---|
| Sizing on floor area alone for a process load | Undersized by a wide margin | Obtain the process heat balance |
| Ignoring glycol derating | Shortfall at low temperature | Apply the manufacturer’s glycol table |
| Stacking margins | Severe oversizing, poor part-load efficiency | One stated margin, applied once |
| Ignoring altitude | Shortfall in plateau projects | Apply the altitude correction |
| Sizing only on full-load COP | High annual energy use | Check IPLV against the load profile |
Frequently asked questions
What safety margin is normal for a chiller?
5%–10% where the load comes from a proper calculation, 15%–20% where it is estimated. The margin should be documented so it can be reviewed, not buried in the selection.
How do I size for a future expansion?
Allow for it in pipe sizes, plant space and electrical capacity, and select the first machine at the current load. Buying capacity for a building that may never be built is the most expensive form of margin.
Can one chiller serve both process and comfort loads?
Technically yes, but the two have different temperature requirements and different load profiles. A shared machine usually ends up sized for the process and inefficient for the comfort load.
What chilled water temperature should I specify?
7/12 °C is the standard and gives the widest choice of equipment. Lower supply temperatures reduce capacity and efficiency; higher temperatures improve both but may not suit the terminal units.
How much does pipe insulation affect the selection?
Uninsulated or poorly insulated chilled water pipe picks up heat, which the chiller must remove. In long distribution runs this can add several percent to the load — and it shows up as a system that never quite reaches design conditions.
Should the chiller be sized for the worst hour or the design day?
For the design day, which already contains the worst hour. Sizing for a recorded extreme — a one-off 45 °C afternoon — produces a machine that is oversized for its entire life.
Longkang Environmental Equipment Co., Ltd. issues chiller selections with the load, the corrections applied and the IPLV basis stated, so the number can be verified rather than accepted. Phone: +86 400-878-0280 | +86 130-0200-1280
Related reading
- How to calculate chiller cooling load
- COP versus IPLV explained
- Water chiller product page
- Chiller selection margins and how they compound