The core formula
Q (kW) = m (kg/s) × c (kJ/kg·K) × ΔT (K)
For water, c = 4.187 kJ/kg·K. In the units most plant engineers actually use:
Q (kW) = flow (m³/h) × ΔT (K) × 1.163
So 10 m³/h of water cooled by 5 K removes 58 kW. This single relationship covers most process cooling calculations and, run backwards, converts a known chiller capacity into an achievable flow and temperature range.
Process cooling: four worked examples
1. Cooling a reaction vessel. A 5 m³ batch must be cooled from 80 °C to 30 °C in 90 minutes. Mass ≈ 5,000 kg, c ≈ 3.6 kJ/kg·K for the reaction mixture.
Q = 5,000 × 3.6 × 50 ÷ (90 × 60) = 167 kW
Add the heat of reaction if the reaction is exothermic — it is often the dominant term and is the most common omission in batch cooling calculations.
2. Injection molding machine. Cooling capacity is roughly proportional to clamp force and cycle time. A practical estimate for a 250-tonne machine running a 30-second cycle is 15–25 kW; the precise figure depends on shot weight, material and mold design.
3. CNC and grinding machines. Spindle and hydraulic cooling typically requires 3–10 kW per machine, depending on spindle power. Hydraulic power packs convert most of their input power into heat, so a 15 kW hydraulic unit may need 12 kW of cooling.
4. Data room or equipment cabinet. Total IT load plus 10%–20% for fans, UPS losses and lighting. A 50 kW IT load needs roughly 55–60 kW of cooling installed, with redundancy.
| Process | Basis for calculation | Typical range |
|---|---|---|
| Reaction vessel | Batch mass, c, ΔT, time | 50–500 kW |
| Injection molding | Clamp force, shot weight, cycle | 10–60 kW per machine |
| Hydraulic power pack | Input power × 0.8–0.9 | 5–40 kW |
| Welding equipment | Duty cycle and input power | 5–30 kW |
| Data room | IT load + 15% | 20–500 kW |
| Laser cutting | Laser power × 2.5–3.5 | 5–20 kW |
Building cooling load: the components
| Component | Typical method | Order of magnitude |
|---|---|---|
| Fabric gain | U-value × area × ΔT | 20–60 W/m² depending on envelope |
| Solar gain | Orientation and shading factors | Highest on west façades |
| People | 75 W sensible + 55 W latent per person | Office occupancy |
| Lighting | 8–15 W/m² for LED offices | Higher for retail |
| Equipment | Nameplate × diversity | Office: 10–20 W/m² |
| Fresh air | Flow × enthalpy difference | Often 20%–40% of total |
| Duct and pipe gain | 2%–5% of load | Higher for long runs |
Fresh air is routinely underestimated. In a humid climate, the latent load of ventilation air can exceed the entire sensible load of the building, and a chiller sized without it will fail in the rainy season.
Converting load into water flow and pipe size
Once the load is known, flow follows from the chosen temperature range.
| Load | Flow at 5 K | Flow at 8 K | Note |
|---|---|---|---|
| 100 kW | 17.2 m³/h | 10.7 m³/h | — |
| 300 kW | 51.6 m³/h | 32.3 m³/h | — |
| 600 kW | 103 m³/h | 64.5 m³/h | — |
| 1,000 kW | 172 m³/h | 107 m³/h | — |
A wider temperature range reduces flow and pipe size, which saves capital cost, but it requires terminal units designed for the wider range and it may reduce chiller efficiency. There is no free lunch in either direction.
Where the margin belongs
| Situation | Margin | Reason |
|---|---|---|
| Load from a full process heat balance | 5% | Uncertainty is small and known |
| Load from equipment nameplates | 10% | Diversity and simultaneity unknown |
| Load estimated from floor area | 15%–20% | Rough method, wide error band |
| Future expansion expected | 0% on the machine, allowance in pipes and space | Avoid stranded capacity |
Apply the margin once, to the final load figure. Applying it to the load, then to the correction factors, then again at selection is how a 600 kW requirement becomes an 850 kW machine running at 35% load.
Verifying a calculated load
Three checks catch most errors:
- W per square meter — a comfort cooling load should land in a plausible band: 80–150 W/m² for a modern office, higher for retail or glazed façades.
- kW per tonne of product — compare with similar installations; a large deviation usually means a missed term.
- Flow consistency — flow calculated from load and ΔT should match the pump and pipe selection.
Frequently asked questions
What is the difference between sensible and latent load?
Sensible load changes air or water temperature; latent load removes moisture. A chiller handles both, but the split determines the required chilled water temperature: if dehumidification is needed, the coil must run colder than the dew point.
Can I size a chiller from the existing electricity bill?
Not directly, but it is a useful cross-check. Cooling energy is a fraction of total electricity, and comparing the calculated load with metered consumption often reveals a load that was overstated.
How do I account for simultaneous process and comfort loads?
Add the loads but check whether the peaks coincide. A factory that cools both machines and offices may peak in the afternoon for comfort and continuously for process — the two add.
What is a typical chiller efficiency per kW?
A screw chiller at design condition delivers roughly 4.5–6.0 kW of cooling per kW of input. Use this to sanity-check the electrical load: a 600 kW chiller needs roughly 100–130 kW of electrical capacity.
How much does chilled water temperature affect capacity?
Roughly 3% of capacity per kelvin of evaporating temperature change. Going from 7 °C to 4 °C supply can cost 10%–15% of capacity and a similar share of efficiency.
Should I calculate at design day or at peak hour?
Both. The design day sets the machine size; the peak hour confirms the storage, flow and control strategy. A plant that meets the design day but cycles badly at 3 a.m. is still a design failure.
Longkang Environmental Equipment Co., Ltd. checks customer load calculations against flow, efficiency and part-load behavior before issuing a selection, so that an arithmetic slip does not become an installed problem. Phone: +86 400-878-0280 | +86 130-0200-1280