Indicative equipment prices
Ex-works, 380–415 V, chilled water 7/12 °C, standard configuration. For budget planning only.
| Type | Cooling capacity | Typical application | Equipment price (USD) |
|---|---|---|---|
| Air-cooled, scroll | 30 kW | Small office, shop, lab | 6,000–10,000 |
| Air-cooled, scroll modular | 100 kW | Retail, restaurant, small plant | 15,000–25,000 |
| Air-cooled, screw | 200 kW | Hotel, factory, warehouse | 28,000–45,000 |
| Air-cooled, screw | 400 kW | Large hotel, industrial process | 50,000–75,000 |
| Water-cooled, screw | 350 kW | Hotel, hospital, factory | 35,000–55,000 |
| Water-cooled, screw | 700 kW | Campus, industrial plant | 60,000–95,000 |
| Water-cooled, centrifugal | 1,200 kW | District cooling, large complex | 100,000–160,000 |
| Water-cooled, magnetic bearing | 800 kW | Data center, hospital | 130,000–190,000 |
Per kW, water-cooled machines look cheaper than air-cooled ones — but they need a cooling tower, a condenser water pump set and water treatment, which together add 15%–25% to the plant cost. Compare installed cost, not equipment price.
What is inside a chiller plant quotation
| Line item | Share of installed cost | What to check |
|---|---|---|
| Chiller unit(s) | 50%–65% | Capacity and COP at the actual leaving water temperature and ambient |
| Cooling tower (water-cooled) | 8%–15% | Approach, fan power, drift loss, noise |
| Pumps (evaporator and condenser) | 5%–10% | Duty point, standby arrangement, VFD or fixed speed |
| Piping, valves and insulation | 8%–15% | Material, insulation thickness, valve quality |
| Control panel and BMS interface | 4%–8% | Staging logic, protocol, remote access |
| Installation, crane and commissioning | 8%–15% | Rigging route, structural loading, water treatment |
| Refrigerant charge and first fill | 2%–5% | Type and GWP, leak detection requirement |
The five choices that move the price
| Choice | Price effect | When it is justified |
|---|---|---|
| Magnetic bearing centrifugal instead of oil-lubricated | +30%–50% | More than 4,000 full-load-equivalent hours, or a data center |
| Inverter-driven compressor | +12%–20% | Load varies widely; typical payback 2–4 years |
| Higher IPLV rather than higher full-load COP | +5%–15% | Almost always the right trade — chillers run at part load most of the time |
| Low-GWP refrigerant (R513A, R1234ze) | +5%–12% | Regulations or corporate carbon targets |
| Dual compressors or dual circuits | +10%–18% | Hospitals, data centers, any load that cannot stop |
Why quotes for the same duty differ
Different leaving water temperature. A machine rated 7/12 °C and one rated 5/10 °C are not the same product, and the second is significantly larger for the same nominal tonnage.
Different ambient design. An air-cooled chiller rated at 35 °C ambient delivers about 85% of that capacity at 43 °C. Quotes that assume different ambient temperatures cannot be compared.
Different scope. Tower, pumps, buffer tank, water treatment and electrical supply are frequently excluded from one quote and included in another.
Different efficiency basis. Full-load COP and IPLV can be presented selectively. Ask for both, at the correct conditions, with the test standard named.
How to compare properly
- Fix the design conditions: leaving and entering water temperature, flow rate, ambient dry-bulb, altitude, fouling factor.
- Require capacity, power and COP at those conditions — not at AHRI or GB nominal conditions alone.
- Require IPLV or part-load data at 25%, 50%, 75% and 100%.
- Require a bill of quantities covering tower, pumps, valves, insulation, controls and commissioning.
- Normalise the electrical scope: who supplies the cable, the isolator, the starter?
Running cost often outweighs the price difference
A 400 kW chiller running 3,000 full-load-equivalent hours a year draws about 133 kW at COP 3.0, or 400,000 kWh. The same duty at COP 3.4 draws 118 kW, or 353,000 kWh. At USD 0.09/kWh the difference is about USD 4,200 a year — which repays a 20% premium of roughly USD 8,000 on a 400 kW machine in under two years. Price and efficiency should be evaluated together, at the actual load profile.
Frequently asked questions
Why is a 100 kW chiller sometimes cheaper than an 80 kW one?
Because nominal capacity is quoted at different conditions, or because one is a modular scroll bank and the other a single screw machine. Always compare at the same leaving water temperature and ambient.
Is a water-cooled chiller cheaper overall than air-cooled?
At 300 kW and above, usually yes on total cost of ownership where a cooling tower can be sited: the chiller is more efficient and lasts longer. Below 150 kW, the tower and condenser water pumps usually make air-cooled the better choice.
What is typically not included?
Cooling tower, condenser water pumps, buffer tank, water treatment, chilled water pumps, electrical cabling and switchgear, structural supports, and refrigerant for long pipe runs. Confirm each line in writing.
How much does installation add?
For a simple plant room, 25%–35% of equipment cost. Add 10%–15% more where a crane is needed, the plant room is in a basement with a difficult rigging route, or the site is remote.
What are typical delivery and payment terms?
30% deposit, 60% before shipment, 10% after commissioning is common, with 35–50 days production for screw machines and 60–90 days for centrifugal or magnetic bearing units. Large machines ship in sections and are assembled on site.
Should I buy a spare compressor?
For a single-chiller plant serving a hospital or data center, a spare compressor or a rental connection is worth considering. For a two-chiller plant with 60% redundancy, the spare is usually unnecessary.
Longkang Environmental Equipment Co., Ltd. quotes with the design conditions, the part-load table and a line-by-line bill of quantities, so competing offers can be compared at the same duty rather than at the same headline tonnage. Phone: +86 400-878-0280 | +86 130-0200-1280