Map the shifts before sizing anything
| Shift pattern | Showers per day per worker | Peak windows |
|---|---|---|
| Single day shift | 1 | 17:00–19:00 |
| Two shifts | 1–2 | 07:00–08:00, 19:00–21:00 |
| Three shifts | 1 | 07:00, 15:00, 23:00 |
| Continuous process, 12 h | 2 | Shift change plus end of week |
Three shifts means three peaks, each smaller than a school’s single peak but repeated. That changes the storage calculation: the plant has recovery time between peaks, so it can be smaller relative to storage than in a school.
Consumption per worker
| Accommodation | Consumption per worker per day | Note |
|---|---|---|
| Basic dormitory, shared showers | 40–60 L at 60 °C | Most common |
| Ensuite dormitory | 60–90 L | Higher standard, newer parks |
| Dormitory with canteen | Add 5–10 L per meal | Kitchen load |
| Worker housing with laundry | Add 10–20 L | Shared washing machines |
A 2,000-worker factory at 50 L uses 100 m³ per day — comparable to a large hotel, but delivered in three windows instead of one.
Peak-hour and storage calculation
| Shift pattern | Peak-hour factor | Storage ratio (storage ÷ daily) |
|---|---|---|
| Single shift | 30%–35% | 0.4–0.5 |
| Two shifts | 20%–25% | 0.3–0.4 |
| Three shifts | 15%–20% | 0.25–0.35 |
| Continuous, staggered | 10%–15% | 0.2–0.3 |
Three shifts is the easiest case to design: each peak is smaller and the plant has two recovery windows. A single-shift factory with a 35% peak is the hardest, and that is exactly where projects try to save money on tanks.
Sizing the plant
| Daily demand | Energy at ΔT 45 K | 10 h recovery | 14 h recovery |
|---|---|---|---|
| 30 m³ | 1,570 kWh | 157 kW | 112 kW |
| 60 m³ | 3,140 kWh | 314 kW | 224 kW |
| 100 m³ | 5,233 kWh | 523 kW | 374 kW |
| 150 m³ | 7,849 kWh | 785 kW | 561 kW |
In an industrial park the plant room is often a corner of the utility building, and roof space is available for the units. Check the roof structure for the operating weight with water, and check the electrical capacity before promising a schedule: a 500 kW bank needs a dedicated transformer in most parks.
Retrofitting a coal or gas boiler
Most factory dormitories in China still run a coal or gas boiler, and the conversion is the main commercial opportunity.
| Existing system | Conversion approach | Watch out for |
|---|---|---|
| Coal boiler, radiator circuit | Replace with heat pump plus new storage | Radiators need 60 °C or larger surface |
| Gas boiler, 60 °C storage | Add heat pumps as base load, keep boiler | Boiler becomes peak and backup |
| Electric resistance tanks | Direct replacement, same pipework | Check supply capacity |
| Centralised steam | Heat pump for domestic water only | Keep steam for process |
The retrofit usually keeps the existing distribution and replaces the heat source. That limits the capital cost and the disruption, but the radiators or the tank coils must be checked against the lower flow temperature a heat pump prefers.
Why the operating cost case is strong
| Heat source | Efficiency | Energy per 1,000 kg at ΔT 45 K | Relative cost |
|---|---|---|---|
| Electric resistance | 0.95–1.0 | 523 kWh | 100 |
| Coal boiler | 0.60–0.70 | 750–870 kWh coal | 45–60 |
| Gas boiler | 0.88–0.92 | 570–595 kWh gas | 55–70 |
| Air-source heat pump | COP 3.0–4.0 | 131–174 kWh | 20–30 |
The comparison depends on local tariffs, but the ratio between electricity at COP 3.5 and gas at 90% is roughly 1:2.5 in most markets, which is why heat pumps displace boilers wherever electricity is not heavily taxed relative to gas.
Electrical capacity: the constraint people forget
| Plant size | Approximate running current at 380 V | Transformer suggestion |
|---|---|---|
| 100 kW | 160 A | 200 kVA dedicated |
| 300 kW | 480 A | 630 kVA |
| 500 kW | 800 A | 1,000 kVA |
| 800 kW | 1,280 A | 1,600 kVA |
If the park supply cannot be upgraded, the project is limited to the available capacity, and the answer is a smaller plant with more storage, not a larger one with a promise of a later upgrade.
Operations in a factory environment
| Issue | Measure |
|---|---|
| Dust and metal particles | Coil cleaning every 1–2 months |
| Corrosive atmosphere | Coated coils, IP65 panels |
| Unskilled operation | Locked setpoints, simple alarms |
| Vandalism and theft | Secure compound, locked isolators |
| Water hardness | Softener where above 250 mg/L |
Factory sites are harder on equipment than hotels. A coil that would last three years in a hotel may need cleaning monthly next to a foundry.
A worked example
A 2,000-worker, three-shift factory, 50 L per worker, 12-hour recovery:
| Item | Calculation | Result |
|---|---|---|
| Daily demand | 2,000 × 50 L | 100 m³/d |
| Energy | 100,000 × 4.186 × 45 ÷ 3,600 | 5,233 kWh |
| Plant at 12 h | 5,233 ÷ 12 | 436 kW |
| Winter correction | 436 ÷ 0.75 | 581 kW nominal |
| Units | 581 ÷ 40 kW | 15 units of 40 kW |
| Peak per shift | 18% of 100 m³ | 18 m³ |
| Storage | 18 − 12, ×1.2 | about 7 m³, specify 2 × 5 m³ |
The storage looks small because the plant is large: with 436 kW running, most of the peak is met directly. That is the opposite of the school case, and it is why the shift pattern has to be established first.
Longkang Environmental Equipment Co., Ltd. sizes factory dormitory systems from the shift roster, and provides a cost comparison against the existing boiler using the site’s own fuel and electricity prices. Phone: +86 400-878-0280 | +86 130-0200-1280
Questions from plant engineers
How do I size for a dormitory that is only 70% occupied?
Size on the design occupancy but set the controls to stage units, so a partly occupied block runs fewer machines. Do not size on current occupancy: the dormitory will fill.
Can the heat pumps run on the factory’s 380 V supply?
Yes, three-phase 380–415 V is standard for commercial units. Single-phase 220 V units are limited to about 3–5 kW and are only suitable for small blocks.
What is the payback against a gas boiler?
Typically three to five years at current tariffs, depending on hours of use and the gas price. A dormitory used all year at high occupancy pays back faster than a seasonal one.
Do I need a new transformer?
Often yes for plants above 300 kW. Check with the park supply authority early; a transformer upgrade can take longer than the equipment delivery.
How much maintenance does a 15-unit bank need?
Two scheduled visits a year plus monthly coil cleaning in a dusty environment. Fifteen units is a lot of filters and coils; consider a maintenance contract rather than ad hoc calls.
Can waste heat from the process be used instead?
If the factory has waste heat at 30–45 °C, a water-source or hybrid heat pump will beat an air-source unit on efficiency. Ask the process engineer before specifying air-source.