Heat Pump Water Piping: Layout, Sequence and Hydraulic Checks

Decide the circuit arrangement first

Three arrangements cover almost every commercial job.

Arrangement When to use Advantage Penalty
Direct, unit to tank Single unit, tank within 15 m Fewest components, lowest cost Unit flow must match tank coil or tank must be full-volume
Primary/secondary with buffer Multiple units, or variable demand Units see stable flow; tank can be sized on peak Extra pump and a hydraulic separator
Unit to plate heat exchanger Retrofit where the existing tank cannot be opened Keeps existing vessel and water quality Approach temperature loss of 1–2 K

For systems with two or more units, the primary/secondary arrangement is the default. Each unit gets a constant flow through its own pump, and a buffer volume of 10–20 L per kW decouples the primary from the secondary. Without that volume the units short-cycle whenever the secondary valve modulates.

Pipe sizing and pressure drop

Size on velocity and pressure drop, not on the unit connection.

Capacity (kW) Flow at ΔT 5 K (L/s) Steel DN Velocity (m/s) Pressure drop (Pa/m)
10 0.48 25 1.0 180
20 0.96 32 1.2 200
30 1.43 40 1.1 210
50 2.39 50 1.2 230
80 3.82 65 1.2 190

Keep velocity below 1.2 m/s in occupied buildings so that the pipe is not audible, and below 2.0 m/s in plant rooms. Above 1.5 m/s in a hot water circuit, erosion of copper at fittings becomes a real risk, particularly where the water is soft and the pH is low.

Pump position and the components that matter

Put the circulating pump on the return leg, where the water is coolest. A pump on the flow side sees 50–60 °C water, which shortens seal and bearing life, and it lowers the pressure at the unit’s inlet, encouraging cavitation and air release.

The working set, in order from the tank:

  1. Isolation valve, full bore, on both flow and return.
  2. Y-strainer on the return, 20 mesh, with a blow-down valve.
  3. Circulating pump, with flexible connectors either side.
  4. Check valve on the discharge, spring-loaded rather than swing, so it does not chatter at low flow.
  5. Balancing valve with a measurable orifice, so the design flow can be set and proved.
  6. Pressure gauge and thermometer on both sides of the unit.
  7. Air vent at the highest point; drain cock at the lowest.

Do not fit a strainer finer than 20 mesh on the suction side of a pump: the pressure drop will starve it. If the water is heavily scaled, treat the cause rather than adding a finer strainer.

Air is the most common fault

Air in a water circuit produces the same symptoms as a refrigerant fault: high discharge temperature, low capacity, noisy pump and unstable flow switch. It gets in through poor venting, through a suction-side leak on the pump, or through a tank connection that draws air when the level drops.

Symptom Likely cause Action
Pump noisy, flow switch chattering Air at pump inlet Vent, check pump orientation, raise static head
Unit cuts out on high pressure Poor water flow Check strainer, valve position, air
Temperature difference across unit above 7 K Flow below design Measure flow, rebalance
Flow switch alarm at start-up Air pocket in the unit Vent at the unit’s high point

Fill from the bottom of the circuit, at the lowest drain, with the highest vent open. Fill slowly — a 500 L circuit should take several minutes, not thirty seconds. Then run the pump and vent again; air comes out of solution as the water warms.

Expansion, pressure and safety

A sealed circuit needs an expansion vessel sized on the system volume and the maximum temperature, plus a safety valve set at or below the unit’s rated pressure. As a rule of thumb, allow 4%–5% expansion for a 10–60 °C swing, so a 500 L system needs a vessel of at least 25–35 L of effective volume.

System volume Vessel nominal size Safety valve setting
Up to 200 L 12–18 L 6 bar
200–500 L 24–35 L 6 bar
500–1,000 L 50–80 L 6 bar
Above 1,000 L Calculated 6 bar

Where the make-up water is hard, fit a water softener or a scale inhibitor ahead of the unit. A 1 mm scale layer on the condenser can cost 5%–8% of capacity, and it is far cheaper to prevent than to remove.

Pressure testing and flushing before insulation

Test the pipework before any insulation goes on. The usual acceptance is 1.5 times the working pressure, held for 30 minutes with no visible drop, followed by a two-hour observation at working pressure. Record the gauge reading at the start and end; a small drop on a large system may simply be air, but a drop that continues is a leak.

Flush the circuit after testing and before connecting the unit if the pipework has been open to site conditions. Construction debris destroys pump seals and blocks plate heat exchangers. Flush to a drain, not through the unit.

Insulation sequence and thickness

Insulate after testing, and insulate the fittings as carefully as the straight runs. A bare flange or valve body can lose more heat than several meters of insulated pipe.

Pipe DN Insulation thickness (thermal conductivity 0.040 W/m·K) Expected loss (W/m at 60 °C)
25 30 mm 22
32 30 mm 26
40 40 mm 30
50 40 mm 35
65 50 mm 42

Use closed-cell insulation with a continuous vapor barrier on chilled or dual-temperature lines; on hot lines the priority is a sealed jacket and UV protection outdoors. Leave no gaps at hangers — use insulated saddles, or the pipe will lose heat at every support.

What to photograph before closing up

Longkang Environmental Equipment Co., Ltd. asks contractors to submit six photographs per system before the ceiling or shaft is closed: pump and valves, strainer with the blow-down, unit connections, highest vent, lowest drain, and the pressure test gauge with its reading. These images settle most warranty questions later. Phone: +86 400-878-0280 | +86 130-0200-1280

Questions from site

Can I connect two heat pumps to one tank with a single pump?

Only if the pump is sized for the combined flow and the units are hydraulically identical. In practice, separate pumps with a common buffer give better control and let one unit be serviced while the other runs.

Does the hot water return loop need its own pump?

Yes, if the draw-off points are more than about 15 m from the tank or the system must deliver hot water within a few seconds. Size the return pump for a small flow — enough to keep the loop above 45 °C — and insulate the loop fully.

Should the pipework be copper or PPR?

Copper is more tolerant of temperature and is easier to support at large sizes; PPR is cheaper and avoids corrosion but needs more supports and longer expansion loops. Both work if sized and insulated correctly. Do not mix them without a dielectric union.

What pressure should the system run at?

Set the cold fill pressure so that the highest point is at least 0.5 bar positive when hot. For a three-story building that is typically 2.0–2.5 bar cold. Higher is not better: it increases the load on the safety valve and the tank.

How do I prove the flow is correct?

Fit a balancing valve with a measuring orifice and record the setting, or use an ultrasonic clamp-on meter at a straight run of at least 10 diameters. A temperature difference across the unit is a rough check, not proof.

Is a strainer really necessary on a new system?

Yes. New pipework carries mill scale, tape and swarf. A 20-mesh strainer with a blow-down valve costs little and protects the pump, the flow switch and the heat exchanger.