The three definitions
| Definition | Formula | Example (20 t/d at 80% moisture) |
|---|---|---|
| Wet tonnage | As delivered | 20 t/d |
| Dry solids | Wet × (1 − moisture) | 4 t/d |
| Water content | Wet × moisture | 16 t/d |
| Evaporation rate | Wet − product | Depends on outlet moisture |
A dryer specified as “20 t/d” without a stated moisture content is unspecified. At 75% moisture it must handle 5 t of dry solids; at 82% moisture only 3.6 t — a 28% difference in solids load and a much larger difference in evaporation duty.
Conversions you will actually use
Wet to dry solids: tDS = W × (1 − M₁)
Dry solids to wet at a new moisture: W₂ = tDS ÷ (1 − M₂)
Water to evaporate: E = W₁ − W₂
Evaporation per hour: E_h = E ÷ operating hours
| From | To | Formula |
|---|---|---|
| Wet tonnage at M₁ | Dry solids | W × (1 − M₁) |
| Dry solids | Wet tonnage at M₂ | tDS ÷ (1 − M₂) |
| Wet at M₁ | Wet at M₂ | W × (1 − M₁) ÷ (1 − M₂) |
| Wet at M₁ | Water evaporated to M₂ | W × [1 − (1 − M₁) ÷ (1 − M₂)] |
| Evaporation | Energy (heat pump) | E ÷ 2.5 to 4 kg/kWh |
A conversion table worth keeping
For 1 tonne of sludge at 80% moisture, the product mass at different outlet moisture contents:
| Outlet moisture | Product mass (t) | Water removed (t) | Volume reduction |
|---|---|---|---|
| 70% | 0.667 | 0.333 | 33% |
| 60% | 0.500 | 0.500 | 50% |
| 50% | 0.400 | 0.600 | 60% |
| 40% | 0.333 | 0.667 | 67% |
| 30% | 0.286 | 0.714 | 71% |
| 20% | 0.250 | 0.750 | 75% |
| 10% | 0.222 | 0.778 | 78% |
The curve flattens: the first 30 percentage points of moisture removal (80% to 50%) cut the mass by 60%, while the next 30 points (50% to 20%) add only 15 more. This is why the outlet target should be set by the disposal route and not by ambition.
Reading a supplier’s capacity claim
Ask three questions of any quoted capacity figure:
- At what inlet moisture? A claim of 20 t/d is meaningless without it.
- To what outlet moisture? Capacity at 60% outlet is roughly double capacity at 20% outlet for the same machine.
- Over how many hours? A 24-hour duty is not comparable with an 8-hour duty.
A credible specification reads like this: “10 t/d wet sludge at 80% moisture, dried to 30% moisture, 20 hours per day, evaporation 357 kg/h”. Every number can then be checked against the mass balance.
Worked example: checking a claim
A supplier offers a unit described as “5 t/d capacity”. Your sludge is 82% moisture and you need 40% outlet.
| Step | Calculation | Result |
|---|---|---|
| Dry solids | 5 × (1 − 0.82) | 0.90 t/d |
| Product at 40% | 0.90 ÷ 0.6 | 1.50 t/d |
| Water evaporated | 5 − 1.50 | 3.50 t/d |
| Evaporation per hour (20 h) | 3,500 ÷ 20 | 175 kg/h |
| Energy at 3 kg/kWh | 3,500 ÷ 3 | 1,167 kWh/d |
Now compare with your actual requirement. If your plant produces 8 t/d at the same moisture, one unit is not enough — you need two, or a larger model. The “5 t/d” figure was correct but referred to a different duty.
Capacity versus turndown
A line that can evaporate 500 kg/h at full output may not run stably at 100 kg/h. Check the turndown ratio:
| Configuration | Typical turndown | Implication |
|---|---|---|
| Single batch cabinet | 3:1 | Suits variable output |
| Single continuous belt | 2:1 | Limited turndown |
| Two parallel lines | 4:1 combined | Better matching to seasonal variation |
A plant with strong seasonal variation in sludge output should consider two smaller lines rather than one large one, so the low season does not run at 15% capacity.
Frequently asked questions
Is capacity quoted in wet tonnes or dry solids?
Both are used in the industry, which is exactly why the ambiguity persists. Always convert to dry solids and evaporation rate before comparing offers.
How does sludge type affect throughput?
Fibrous and oily sludges dry more slowly and may need longer residence time, reducing effective capacity by 10%–30% compared with typical municipal sludge. Ask for a test on your own sludge where the volume justifies it.
What if moisture content fluctuates daily?
Size on the highest sustained moisture content, not the annual average. A dryer sized on the average will be short every time the filter press underperforms.
Does the feed system limit throughput?
Frequently yes. A screw conveyor or piston pump sized for the average rate will bottleneck the line during peak output. Size the feed and discharge for the same rate as the dryer.
How is throughput verified after commissioning?
By weighing the product and measuring its moisture content over a full working day, then back-calculating the evaporation rate. A 24-hour test at design inlet moisture is the fairest check.
Can throughput be increased later?
Sometimes, by adding drying modules or extending residence time. It is cheaper to allow space and utility capacity at the outset than to rebuild a line in an operating plant.
Longkang Environmental Equipment Co., Ltd. specifies capacity as wet tonnage, inlet and outlet moisture, operating hours and evaporation rate together, so that the figure can be checked rather than interpreted. Phone: +86 400-878-0280 | +86 130-0200-1280