River dredging produces sludge at 60–85% moisture, and most of that mass is water. A grab dredger may bring up 30 t of wet spoil per day; after drying to 40%, only 10 t remains. The 20 t difference is water that no longer needs a truck, a landfill cell or a disposal fee.
Drying is therefore not only a volume-reduction measure; it is a transport and disposal decision. The economics depend on three numbers: haul distance, disposal price and the cost of evaporation. Get those wrong and the dryer runs at a loss even though the mass balance looks impressive.
Dredging method decides the feed
The dryer design starts with how the sludge was dredged. The same river can produce free-draining sand, fibrous organic mud or liquid silt, and the dewatering stage changes completely.
| Method | Typical moisture | Feed character | Pre-treatment |
|---|---|---|---|
| Grab dredger | 70–85% | Lumps, gravel, shells | Screen and grit removal |
| Cutter suction | 75–90% | Slurry, fine solids | Geotextile bag or centrifuge |
| Trailing suction | 65–80% | Sand-rich, variable | Sand separation and stockpile |
| Dry excavation | 55–75% | Clayey, cohesive | Break up and blend |
Grab dredging brings up gravel, shells and rubbish. If these enter the dryer, they jam the screw, wear the disc and block the discharge. A 10 mm screen and a grit chamber before the feed bin are mandatory, not optional. Cutter suction produces a slurry that needs mechanical dewatering before thermal drying; feeding 85% slurry directly to a dryer evaporates too much water and the energy cost becomes unacceptable.
Trailing suction sand is a different problem: it drains freely and may be sold as construction sand rather than dried. Separate the sand first, then dry only the fine organic fraction. This can cut the dryer size by 30–50%.
Mass balance for 30 t/d
Input: 30 t/d wet sludge at 80% moisture, dried to 40%. Dry solids = 30 × (1 − 0.80) = 6 t/d. Output at 40% = 6 ÷ 0.60 = 10 t/d. Water evaporated = 30 − 10 = 20 t/d.
Over 20 hours, evaporation is 1,000 kg/h. With five 250 kg/h units, four run and one stands by. The duty is 80%, which gives stable temperature and allows maintenance without stopping the plant.
Specific energy for a heat-pump dryer is about 0.32 kWh/kg water. Daily electricity is 20,000 × 0.32 = 6,400 kWh. At CNY 0.65/kWh, that is CNY 4,160/day. If the sludge is more organic and the dryer runs at 0.28 kWh/kg, the daily cost falls to CNY 3,640; if it is colder or the feed is wetter, it rises.
| Item | Value | Basis |
|---|---|---|
| Wet feed | 30 t/d | Dredger output |
| Feed moisture | 80% | After screening |
| Dry solids | 6 t/d | 30 × 0.20 |
| Dried output | 10 t/d | 6 ÷ 0.60 |
| Water evaporated | 20 t/d | 30 − 10 |
| Evaporation rate, 20 h | 1,000 kg/h | 20,000 ÷ 20 |
| Unit configuration | 5 × 250 kg/h | Four duty, one standby |
| Specific energy | 0.32 kWh/kg | Heat-pump dryer |
| Daily electricity | 6,400 kWh | 20,000 × 0.32 |
| Daily power cost | CNY 4,160 | At CNY 0.65/kWh |
Transport and disposal: the numbers that decide
Assume haulage at CNY 25/t-trip over 45 km and disposal at CNY 200/t. Wet sludge: 30 t × 25 = CNY 750/haul, plus 30 × 200 = CNY 6,000 disposal, total CNY 6,750/day. Dried: 10 × 25 = CNY 250/haul, plus 10 × 200 = CNY 2,000, total CNY 2,250/day. Saving CNY 4,500/day.
Net of power: 4,500 − 4,160 = CNY 340/day. That is thin. A 300-day year gives about CNY 102,000, which may not cover the capital and maintenance of a 1,000 kg/h plant.
If the disposal price is CNY 500/t rather than 200, the disposal saving is 30 × 500 − 10 × 500 = CNY 10,000/day; with the CNY 500/day transport saving, total is CNY 10,500/day and net is CNY 6,340/day, which makes the project attractive. If the haul distance is 10 km and the rate CNY 15/t-trip, the transport saving is 30 × 15 − 10 × 15 = CNY 300/day; with disposal at 200, the total saving is 4,300/day, net 140/day. Drying barely covers its power at that distance and fee.
| Case | Haul rate | Disposal | Daily saving | Net after power |
|---|---|---|---|---|
| Short haul, low fee | CNY 15/t, 10 km | CNY 200/t | CNY 4,300 | CNY 140 |
| Base case | CNY 25/t, 45 km | CNY 200/t | CNY 4,500 | CNY 340 |
| Long haul, mid fee | CNY 35/t, 80 km | CNY 300/t | CNY 6,700 | CNY 2,540 |
| High disposal | CNY 25/t, 45 km | CNY 500/t | CNY 10,500 | CNY 6,340 |
The conclusion is not that drying is always right. It is that drying belongs where disposal is expensive or haulage is long. Below 40 km with a low tipping fee, mechanical dewatering and direct disposal may be cheaper. Between 40 and 100 km, the balance shifts. Above 100 km or with a high fee, drying usually wins.
Site constraints on a riverbank
Dredging sites are often floodplains with soft ground, seasonal access and no power. A 1,000 kg/h plant needs about 400–600 m² including feed storage, drying, odor control and dried-product storage, and 350–450 kW of connected power. If the site floods, raise the platform 0.5 m above the 50-year flood level or use a mobile container.
Odor is the second constraint. River sludge is anaerobic and contains sulphide; drying at 60–70 °C releases ammonia and volatile sulfur compounds. Enclose the feed and discharge, extract 8–12 air changes per hour, and use a biofilter or chemical scrubber. A 30 t/d plant typically needs 3,000–5,000 m³/h of odor treatment air. Skipping this causes complaints within the first week.
Power quality matters on a dredger site. A generator may be the only supply; size it for starting current, not running current. A 250 kg/h heat-pump dryer has a 60–80 kW compressor and a 5–7 kW fan; starting current can be 2–3 times running current. Use soft start or inverter and a generator with 25–30% margin.
Wet product storage needs a covered bay. Dried sludge at 40% reabsorbs moisture from rain and can re-grow odor. Store on a concrete slab with drainage and a roof, and ship within 7–10 days.
Four cases where drying is the wrong answer
The sludge is contaminated with heavy metals or persistent organics and must go to hazardous-waste incineration. Drying reduces water but does not destroy the contaminant; the disposal route and cost remain, and the dryer adds a step.
The river is dredged once for a small volume, under 5,000 t. A mobile dryer can serve several sites, but mobilization and demobilization may exceed the saving. Consider geotextile bag dewatering or a temporary lagoon instead.
The sludge is mostly sand and gravel with little organic matter. Separate and sell the sand; thermal drying adds no value.
The site has no reliable power or odor buffer, and the nearest residents are within 200 m. The environmental risk outweighs the transport saving.
Boundaries
The mass balance assumes 80% feed and 40% output. A 70% feed gives 20 t/d output at 40%, and a 85% feed gives 5 t/d; the dryer and haulage scale accordingly. The energy figure is for a heat-pump dryer; a thermal dryer may use 0.8–1.2 kWh/kg or fuel, and the economics change. Disposal prices and haul rates are local and must be quoted, not assumed.
Common questions
How much water does river sludge contain?
Typically 60–85%. At 80%, 30 t of wet sludge contains 24 t water and 6 t dry solids. Drying to 40% leaves 10 t, so 20 t water is evaporated.
Is drying always cheaper than hauling wet sludge?
No. At 10 km and CNY 15/t-trip with a CNY 200/t tip fee, the saving is about CNY 4,300/day and power costs CNY 4,160/day, so it barely breaks even. It works where haulage is long or the tip fee is high.
What pre-treatment is needed?
Screen out gravel, shells and rubbish, and remove grit. Cutter-suction slurry needs mechanical dewatering before thermal drying. Sand-rich dredging should separate sand first and dry only the fines.
What capacity for 30 t/d?
At 80% to 40%, evaporation is 20 t/d. Over 20 hours that is 1,000 kg/h; five 250 kg/h units with four duty and one standby give 1,000 kg/h duty and resilience.
How much power does it need?
About 6,400 kWh/day at 0.32 kWh/kg, or 350–450 kW connected for a 1,000 kg/h plant. A generator must be sized for starting current, not running current.
Can the dried product be reused?
It depends on contamination. Clean river sediment can go to landfill cover, brick making, cement or soil improvement; contaminated sediment must follow hazardous-waste rules. Test the leachate before choosing a route.
How do I estimate haulage savings?
Multiply the wet metric tons by the reduction in mass, then by the transport and disposal rate. Include loading, unloading and any tipping fee. Drying to 30% can cut a 30 t/d feed to about 10 t/d, but the dryer adds power and operator cost.
What if the riverbank has no power?
Use a generator or a mobile unit with its own power, and check the fuel cost. If the site is remote, the logistics of fuel and spare parts may outweigh the transport saving. Compare a temporary transfer station.
Related reading
- Sludge Dryer Installation: Site and Foundations
- Sludge Dryer Feed and Discharge Systems
- Dried Sludge Disposal and Recovery
- Sludge Volume Reduction and Drying Cost