Hotel Central Air-Conditioning: Chiller Configuration and Plant Design

Start with the load profile, not the peak

Hotel area Load Notes
Guest rooms 60–90 W/m² Depends on glazing and orientation
Corridors and lobby 40–70 W/m² High fresh-air load in the lobby
Restaurants 100–150 W/m² People and kitchen extract
Ballroom 120–180 W/m² Intermittent, high occupancy
Back of house 50–80 W/m² Laundry adds process cooling
Kitchen Process cooling Often a separate system

A 300-room hotel at 45 m² per room and 75 W/m² gives about 1,000 kW for the rooms, plus public areas and restaurants, so 1,300–1,600 kW installed is typical. The peak occurs on a summer afternoon with full occupancy and a function in the ballroom.

The night load is the design problem

At 3 a.m. in spring, the load may be 12%–18% of peak: a few rooms, the lobby, and the back of house. A single large centrifugal at 15% load will surge or run with hot gas bypass, which is inefficient and noisy.

Configuration Night load behavior Comment
1 × 1,400 kW centrifugal Surge risk below 25% Poor part load
2 × 700 kW centrifugal One machine at 30% Marginal
2 × 700 kW screw One machine at 30%, stable Better
1 × 1,000 kW + 1 × 400 kW Small machine at 50% Good
3 × 500 kW screw One at 42% Good, N+1

The last two are the configurations most hotels should consider. The large-plus-small arrangement is the most efficient at night; the three-equal arrangement gives the strongest redundancy.

Chiller type and efficiency targets

Machine COP IPLV Suited to
Air-cooled screw 3.0–3.4 3.5–4.2 Small hotels, no plant room
Water-cooled screw 5.0–5.8 6.0–6.8 Most hotels with a tower
Water-cooled centrifugal VSD 6.0–6.5 6.8–7.4 Large hotels
Magnetic bearing 6.4–7.0 7.2–7.8 Premium, low maintenance

For a hotel, IPLV matters more than COP: the plant spends most of its life between 30% and 70% load. Specify an IPLV target and check it against the local energy code.

Hydraulics: primary/secondary and the decoupler

Arrangement Suited to Watch out for
Primary variable flow Single chiller Minimum flow protection
Primary/secondary Multiple chillers Decoupler sizing
Distributed pumping Large risers Balancing complexity

Hotels have long risers and variable flow at the fan coils, so primary/secondary with a decoupler is the normal arrangement. Size the decoupler for the largest single chiller’s flow, and control the bypass on differential pressure.

Noise and vibration: the constraint that shapes the plant room

Source Level Measure
Chiller compressor 80–90 dB(A) at 1 m Acoustic enclosure, spring isolators
Chilled water pump 75–85 dB(A) Inertia base, flexible connectors
Cooling tower 70–85 dB(A) Remote location, low-noise fan
Piping Structure-borne Resilient hangers, no rigid contact

A plant room directly below guest rooms needs a floating floor or a separate structure. Retrofitting isolation into an existing plant room is expensive and rarely fully effective, so the room’s position is a design decision, not a construction detail.

Integration with domestic hot water

Option Efficiency Comment
Separate heat pump for DHW High Simplest, independent operation
Chiller heat recovery Very high Uses condenser heat, but couples the systems
Dedicated heat recovery chiller High Runs both loads simultaneously
Boiler for DHW Low Incumbent, being displaced

A hotel with a year-round cooling load and a year-round hot water load is the ideal candidate for heat recovery. A desuperheater on the chiller can supply 15%–25% of the DHW energy at almost no extra compressor work; a full heat recovery unit can supply more, at the cost of complexity.

Controls and staging

Function Setting
Staging On leaving water temperature and load trend, not on return temperature alone
Minimum load Protect with bypass or a small machine
Setpoint reset Raise chilled water temperature as load falls
Scheduling Unoccupied setback by area
Metering Chiller, pumps, tower separately
Alarms To the front desk and the engineering mobile

Chilled water reset is the simplest efficiency measure available: raising the supply from 7 °C to 9 °C at part load improves chiller efficiency by roughly 2%–3% per Kelvin, provided the dehumidification load allows it. In a humid climate, the reset must be limited by the space humidity.

A configuration example

A 300-room city hotel, 1,400 kW peak, water-cooled plant:

Item Selection Reason
Base machine 1 × 450 kW screw Night and shoulder load
Main machine 1 × 950 kW centrifugal VSD Daytime peak, efficient at part load
Standby 450 kW cross-connected N+1 on the base load
Chilled water 7/12 °C, primary/secondary Standard
Tower 2 cells, 50% each Turndown and maintenance
Heat recovery Desuperheater on the screw DHW preheat
Plant room Basement, floating floor Noise to guest rooms

The cross-connection is what makes the arrangement work: either machine can serve either header, so a failure does not take out a section of the building.

Longkang Environmental Equipment Co., Ltd. configures hotel plants around the night load and the noise path, and supplies the staging logic with the equipment so the plant does not rely on an operator to switch machines manually. Phone: +86 400-878-0280 | +86 130-0200-1280

Questions from hotel engineering teams

How much spare capacity should a hotel carry?

10%–15% on the peak, plus N+1 on the base load. Hotels rarely shut down for maintenance, so redundancy has to be built in rather than scheduled.

Is air-cooled acceptable for a city hotel?

For small hotels, yes, if there is roof space and the noise can be managed. For 1,000 kW and above, water-cooled is usually more efficient and easier to site.

Can the chiller supply domestic hot water?

With a desuperheater or a heat recovery condenser, yes. It covers preheat, not the full load, and the DHW system still needs its own plant for winter.

How do I handle a ballroom function that doubles the load?

Either size for it, or use a thermal storage tank charged at night, or accept a temporary temperature rise. Many hotels size the plant for the ballroom and accept the part-load penalty, which is where a VSD machine pays for itself.

What chilled water temperature should I use?

7/12 °C is standard. Raising it to 8/13 °C improves efficiency but reduces dehumidification; in a humid climate, keep 7 °C or use a separate dehumidification system.

How often should the plant be reviewed?

Every three to five years, against actual metered consumption. Hotels change: a new restaurant or a refurbished floor alters the load, and the staging logic should follow.