Start with the load profile, not the peak
| Hotel area | Load | Notes |
|---|---|---|
| Guest rooms | 60–90 W/m² | Depends on glazing and orientation |
| Corridors and lobby | 40–70 W/m² | High fresh-air load in the lobby |
| Restaurants | 100–150 W/m² | People and kitchen extract |
| Ballroom | 120–180 W/m² | Intermittent, high occupancy |
| Back of house | 50–80 W/m² | Laundry adds process cooling |
| Kitchen | Process cooling | Often a separate system |
A 300-room hotel at 45 m² per room and 75 W/m² gives about 1,000 kW for the rooms, plus public areas and restaurants, so 1,300–1,600 kW installed is typical. The peak occurs on a summer afternoon with full occupancy and a function in the ballroom.
The night load is the design problem
At 3 a.m. in spring, the load may be 12%–18% of peak: a few rooms, the lobby, and the back of house. A single large centrifugal at 15% load will surge or run with hot gas bypass, which is inefficient and noisy.
| Configuration | Night load behavior | Comment |
|---|---|---|
| 1 × 1,400 kW centrifugal | Surge risk below 25% | Poor part load |
| 2 × 700 kW centrifugal | One machine at 30% | Marginal |
| 2 × 700 kW screw | One machine at 30%, stable | Better |
| 1 × 1,000 kW + 1 × 400 kW | Small machine at 50% | Good |
| 3 × 500 kW screw | One at 42% | Good, N+1 |
The last two are the configurations most hotels should consider. The large-plus-small arrangement is the most efficient at night; the three-equal arrangement gives the strongest redundancy.
Chiller type and efficiency targets
| Machine | COP | IPLV | Suited to |
|---|---|---|---|
| Air-cooled screw | 3.0–3.4 | 3.5–4.2 | Small hotels, no plant room |
| Water-cooled screw | 5.0–5.8 | 6.0–6.8 | Most hotels with a tower |
| Water-cooled centrifugal VSD | 6.0–6.5 | 6.8–7.4 | Large hotels |
| Magnetic bearing | 6.4–7.0 | 7.2–7.8 | Premium, low maintenance |
For a hotel, IPLV matters more than COP: the plant spends most of its life between 30% and 70% load. Specify an IPLV target and check it against the local energy code.
Hydraulics: primary/secondary and the decoupler
| Arrangement | Suited to | Watch out for |
|---|---|---|
| Primary variable flow | Single chiller | Minimum flow protection |
| Primary/secondary | Multiple chillers | Decoupler sizing |
| Distributed pumping | Large risers | Balancing complexity |
Hotels have long risers and variable flow at the fan coils, so primary/secondary with a decoupler is the normal arrangement. Size the decoupler for the largest single chiller’s flow, and control the bypass on differential pressure.
Noise and vibration: the constraint that shapes the plant room
| Source | Level | Measure |
|---|---|---|
| Chiller compressor | 80–90 dB(A) at 1 m | Acoustic enclosure, spring isolators |
| Chilled water pump | 75–85 dB(A) | Inertia base, flexible connectors |
| Cooling tower | 70–85 dB(A) | Remote location, low-noise fan |
| Piping | Structure-borne | Resilient hangers, no rigid contact |
A plant room directly below guest rooms needs a floating floor or a separate structure. Retrofitting isolation into an existing plant room is expensive and rarely fully effective, so the room’s position is a design decision, not a construction detail.
Integration with domestic hot water
| Option | Efficiency | Comment |
|---|---|---|
| Separate heat pump for DHW | High | Simplest, independent operation |
| Chiller heat recovery | Very high | Uses condenser heat, but couples the systems |
| Dedicated heat recovery chiller | High | Runs both loads simultaneously |
| Boiler for DHW | Low | Incumbent, being displaced |
A hotel with a year-round cooling load and a year-round hot water load is the ideal candidate for heat recovery. A desuperheater on the chiller can supply 15%–25% of the DHW energy at almost no extra compressor work; a full heat recovery unit can supply more, at the cost of complexity.
Controls and staging
| Function | Setting |
|---|---|
| Staging | On leaving water temperature and load trend, not on return temperature alone |
| Minimum load | Protect with bypass or a small machine |
| Setpoint reset | Raise chilled water temperature as load falls |
| Scheduling | Unoccupied setback by area |
| Metering | Chiller, pumps, tower separately |
| Alarms | To the front desk and the engineering mobile |
Chilled water reset is the simplest efficiency measure available: raising the supply from 7 °C to 9 °C at part load improves chiller efficiency by roughly 2%–3% per Kelvin, provided the dehumidification load allows it. In a humid climate, the reset must be limited by the space humidity.
A configuration example
A 300-room city hotel, 1,400 kW peak, water-cooled plant:
| Item | Selection | Reason |
|---|---|---|
| Base machine | 1 × 450 kW screw | Night and shoulder load |
| Main machine | 1 × 950 kW centrifugal VSD | Daytime peak, efficient at part load |
| Standby | 450 kW cross-connected | N+1 on the base load |
| Chilled water | 7/12 °C, primary/secondary | Standard |
| Tower | 2 cells, 50% each | Turndown and maintenance |
| Heat recovery | Desuperheater on the screw | DHW preheat |
| Plant room | Basement, floating floor | Noise to guest rooms |
The cross-connection is what makes the arrangement work: either machine can serve either header, so a failure does not take out a section of the building.
Longkang Environmental Equipment Co., Ltd. configures hotel plants around the night load and the noise path, and supplies the staging logic with the equipment so the plant does not rely on an operator to switch machines manually. Phone: +86 400-878-0280 | +86 130-0200-1280
Questions from hotel engineering teams
How much spare capacity should a hotel carry?
10%–15% on the peak, plus N+1 on the base load. Hotels rarely shut down for maintenance, so redundancy has to be built in rather than scheduled.
Is air-cooled acceptable for a city hotel?
For small hotels, yes, if there is roof space and the noise can be managed. For 1,000 kW and above, water-cooled is usually more efficient and easier to site.
Can the chiller supply domestic hot water?
With a desuperheater or a heat recovery condenser, yes. It covers preheat, not the full load, and the DHW system still needs its own plant for winter.
How do I handle a ballroom function that doubles the load?
Either size for it, or use a thermal storage tank charged at night, or accept a temporary temperature rise. Many hotels size the plant for the ballroom and accept the part-load penalty, which is where a VSD machine pays for itself.
What chilled water temperature should I use?
7/12 °C is standard. Raising it to 8/13 °C improves efficiency but reduces dehumidification; in a humid climate, keep 7 °C or use a separate dehumidification system.
How often should the plant be reviewed?
Every three to five years, against actual metered consumption. Hotels change: a new restaurant or a refurbished floor alters the load, and the staging logic should follow.