“Payback in two years” is a sales statement until the boundary is defined. A heat-pump hot-water system has a higher capital cost than an electric heater and a lower running cost; the payback is the difference in capital divided by the difference in annual operating cost. Change the boundary and the number moves.

The useful method is to build the saving from the load, the tariff and the operating hours, then test the result against the capital delta. A payback that survives a lower load, a higher tariff or a shorter season is a robust case; one that only works at the brochure COP is not.

1. Define the boundary first

Compare the same service, not two different systems. The heat-pump case should include the heat pump, the storage tank, the circulation pump, the piping, the controls and the electrical work. The electric-heater case should include the heaters, the same tank and the same distribution. If the heat-pump quote includes a new tank and the electric case does not, the capital delta is overstated.

For a retrofit, include removal, crane access, electrical upgrade and downtime. For a new build, include the space and structural cost of the plant. The incremental capital is the difference between the two complete solutions, not the invoice price of the heat pump alone.

2. Build the load

For hot water, the daily heat is:

Q = 1.163 × V × ΔT

where Q is in kWh, V is the daily water volume in m³ and ΔT is the temperature rise in K. One metric ton of water from 15 °C to 55 °C needs 1.163 × 1 × 40 = 46.5 kWh of heat. That is the useful heat, before any distribution loss.

Add the tank and pipe loss. A poorly insulated tank can lose 5–8% of the stored heat per day; a well-insulated tank loses less. Add the distribution loss if the hot water is circulated through long pipes. The heat pump must supply the useful heat plus the loss.

3. Convert heat to electricity

Option Efficiency Electricity for 46.5 kWh heat Cost at 0.8 CNY/kWh
Electric resistance COP 0.95–1.0 46.5–49 kWh 37.2–39.2 CNY
Heat pump, COP 4.0 COP 4.0 11.6 kWh 9.3 CNY
Heat pump, COP 3.5 COP 3.5 13.3 kWh 10.6 CNY
Heat pump, winter COP 2.5 COP 2.5 18.6 kWh 14.9 CNY

The saving per metric ton is the difference between the resistance cost and the heat-pump cost. At COP 3.5 and 0.8 CNY/kWh, the saving is about 26.6 CNY per metric ton. At 10 metric tons/day, 365 days, the annual saving is about 97,000 CNY before maintenance and the heat-pump auxiliary power.

4. The annual saving

Multiply the daily saving by the number of equivalent full-load days. A hotel may operate 365 days but at a lower load in the shoulder season; a school may operate 200 days; a factory dormitory may operate 330 days. Use the actual occupancy, not the calendar.

Deduct the heat-pump maintenance, the circulation-pump power and any tariff difference. A heat pump with a 10-year life and a 5% annual efficiency decline has a different saving in year 8 than in year 1. For a simple payback, use the year-1 saving and note the degradation; for a lifecycle cost, discount the annual savings.

5. The capital delta and the payback

Example: a 10 m³/day hot-water system, 46.5 kWh heat per metric ton, 365 days, electricity at 0.8 CNY/kWh. Resistance: 46.5 × 10 × 365 = 169,725 kWh/year, 135,780 CNY/year. Heat pump at COP 3.5: 48,493 kWh/year, 38,794 CNY/year. Saving: about 97,000 CNY/year. If the incremental capital is 180,000 CNY, the simple payback is about 1.9 years. If the incremental capital is 300,000 CNY, it is about 3.1 years.

The same calculation at 5 m³/day and a 180,000 CNY delta gives about 3.7 years. At 3 m³/day, it is over six years. The load, not the COP, is usually the decisive variable.

6. What can break the case

Low utilization. A hotel with a seasonal shutdown, a school with long holidays or a factory with one shift has fewer equivalent days than the calendar suggests.

Low tariff or a high demand charge. A low energy price lengthens the payback. A demand charge that the heat pump does not reduce can erase part of the saving.

Oversizing. A unit selected for a peak that occurs a few hours a year costs more and may cycle. The part-load performance matters more than the nameplate COP.

Maintenance and water treatment. Scale and poor water quality reduce the COP and add cleaning cost. Include a maintenance line in the operating cost.

7. A defensible one-page case

State the daily volume, the temperature rise, the annual equivalent days, the tariff, the heat-pump COP at the site’s winter condition, the auxiliary power and the maintenance. Show the resistance and heat-pump annual costs side by side. Show the incremental capital and the simple payback. Add a sensitivity table for ±20% load and ±20% tariff. A reader can then see which assumption drives the answer.

Common questions

Is payback calculated on the whole system or the extra cost?

On the incremental capital: the complete heat-pump solution minus the complete alternative. Using the whole invoice overstates the payback.

Which COP should I use?

The seasonal COP at the site, not the nominal 20 °C value. A winter COP of 2.5–3.5 is more realistic for many hot-water projects than a brochure 4.0.

Do I include maintenance?

Yes. Cleaning, filters, pumps and refrigerant checks are real costs. A payback that ignores them is optimistic.

How long should the analysis run?

At least the equipment life, usually 10–15 years, with a discount rate. A simple payback is a screening tool; a lifecycle cost is the investment case.

Does a lower tariff help or hurt?

It hurts the heat-pump case, because the saving per kWh is smaller. A high tariff with a large resistance load gives the fastest payback.

What is the most common error?

Using the daily volume as the annual volume, or using 365 days for a facility that runs 200. The equivalent-day count is usually the largest source of error.

Should I use simple payback or NPV?

Use simple payback to screen and NPV or IRR to decide. Payback ignores what happens after it is reached; NPV includes the remaining life, fuel escalation and discount rate. Present both, and state the boundary and the tariff assumption.

How do I handle a hybrid with a backup boiler?

Split the annual heat between the heat pump and the boiler using the bin method. The heat pump covers the base load; the boiler covers the peak and the backup. The incremental capital is the heat pump plus controls, not the whole hybrid plant.

Further technical reading

LONGCOM can build the load, tariff and capital boundary for a specific site, and test the payback against a lower load and a higher tariff. For a lifecycle comparison, contact 400-878-0280 or 13002001280.

Related reading

Heat pump vs gas boiler cost · Heat-pump price factors · Energy per metric ton of hot water