Heat pumps · Chillers · Sludge drying systems
Heat pump · Hot water · Heating · Cooling

Inverter Heat Pumps: Part-Load Efficiency

An inverter heat pump is not simply a fixed-speed unit with a variable-frequency drive. Its value depends on the annual load profile, the compressor’s turndown limit, the water system it feeds, and the settings commissioned on site. A unit that is correctly chosen but badly set will cycle at high frequency and lose both efficiency and compressor life.

The commercial argument is also narrower than the sales sheet suggests. The saving is typically 10–25% of annual electricity in a hotel or hospital with a broad load range, and close to zero in a process that runs at 80–100% all year. The decision should be made from a load-duration curve, not from the nominal COP.

1. What the drive actually changes

A scroll compressor’s displacement is approximately proportional to speed. When the frequency falls from 50 Hz to 35 Hz, heating capacity falls to about 70% of rated, while input power falls to about 62%. The difference is the part-load gain: a lower pressure ratio reduces the compression work per kilogram of refrigerant.

There is a lower limit. Below the manufacturer’s minimum frequency — commonly 25–30 Hz for commercial scrolls — oil return and bearing lubrication become unreliable. A single compressor therefore has a turndown ratio of only about 1.6:1 to 2:1. Below that, the unit can only stop. Wider turndown requires two independent refrigerant circuits, or two or more units under group control, giving 4:1 to 6:1 at plant level.

The expansion valve must follow. An electronic expansion valve is normally used, with superheat held at 3–5 K. During commissioning, verify the actual superheat at several frequencies with a clamp meter and a pressure gauge; the controller display alone is not evidence.

2. Read the part-load table before calculating the saving

A 40 kW commercial unit with a well-designed inverter circuit might have the following performance points. The numbers are illustrative; always use the manufacturer’s table for the selected model.

Load Frequency Capacity (kW) Input (kW) COP Annual hours, hotel
100% 50 Hz 40.0 9.80 4.08 10%
75% 44 Hz 30.0 6.60 4.55 30%
50% 38 Hz 20.0 4.10 4.88 40%
25% 30 Hz 10.0 2.20 4.55 20%

For an annual heat demand of 60,000 kW·h, the inverter unit uses 6,000 ÷ 4.08 + 18,000 ÷ 4.55 + 24,000 ÷ 4.88 + 12,000 ÷ 4.55 = 12,982 kW·h. A fixed-speed unit at COP 4.08, with 8% added for cycling and temperature swing, uses 60,000 ÷ 4.08 × 1.08 = 15,882 kW·h. The saving is 2,900 kW·h, or about 2,175 CNY/year at 0.75 CNY/kWh. If the inverter premium is 6,000 CNY, the simple payback is about 2.8 years.

The lesson is that the saving is a few thousand CNY per year, not half the bill. If the 25% load band rises from 20% to 40% of annual hours, the saving grows; if the plant runs above 80% all year, the premium may never pay back.

3. Five settings that decide whether the inverter earns anything

Outlet temperature. Hot-water energy is highly sensitive to setpoint. Dropping from 55 °C to 45 °C lowers the condensing temperature by roughly 8 K and can improve COP by 15–20%. Set the temperature to the lowest value the fixtures actually need, not to the highest value someone is afraid of.

Minimum run and stop times. Set at least 5–6 minutes each. If they are too short, the unit degrades into high-frequency start-stop operation near the tank setpoint, which damages the compressor and wastes energy.

Defrost recovery. During defrost, the fan stops and the compressor raises discharge temperature; the instantaneous COP is negative. After defrost, do not return to full speed immediately. Ramp over 30–60 s and keep the water pump running to avoid a high-pressure trip.

Pump interlock. A variable-speed compressor with a fixed-speed pump is a common mismatch. As the compressor slows, the water flow stays high, the supply-return difference falls from 5 K to 2–3 K, and the evaporating temperature is pulled down. Use a variable-speed pump or a pump signal from the unit, with a minimum-flow limit above the heat exchanger’s safe value.

Lead-lag rotation. In a multi-unit plant, rotate lead and lag by cumulative run hours. Otherwise one unit spends its life at low frequency, with poor oil return and carbon build-up. Give every unit a run near full speed each week.

4. Where the premium does not pay

Steady process load. Injection molding, reactor cooling or other continuous processes that sit near rated capacity give the inverter little low-load time. Several small fixed-speed units with staging are usually cheaper and more robust.

Weak electrical supply. A drive’s input current harmonic content is commonly 5–15%. On a weak transformer with little reactive compensation, this can distort voltage and disturb precision equipment on the same bus. Add a line reactor and a filter, or give the drive a separate supply.

Roof-mounted units on light steel. The 30–40 Hz band is a resonance zone for many scroll compressors. If the frame and pipe supports are not stiff enough, vibration can crack welds and destroy insulation. Check the manufacturer’s vibration data and add dampers and supports.

One small unit at rated load. If the plant has a single unit and the design load is close to its rating, low-load hours are too few to recover the premium.

Frequent defrost in cold, humid climates. The inverter can shorten defrost and reduce its frequency, but it cannot eliminate the reversed-cycle energy. Cold-climate performance depends more on vapor injection, coil area and defrost logic.

Related reading

How to read a heat-pump COP · Why chillers are more efficient at part load · Heat-pump maintenance schedule · Heat-pump selection mistakes

Longcom Environmental Protection Equipment Co., Ltd. can build the annual load curve, compare inverter and fixed-speed options, and commission the five settings above. For project data, call 400-878-0280 or 13002001280.

Frequently asked questions

What is part-load efficiency?

The efficiency at 30–70% load, where most hours operate. A fixed-speed unit cycles on and off, while an inverter unit modulates. The part-load table, not the full-load COP, decides annual energy.

How do I read the part-load table?

Look at capacity and power at several ambient and water temperatures, then match to the bin-hour load. Check the minimum speed and the turn-down ratio. A table that stops at 50% load hides the most common operating range.

What five settings matter?

Compressor minimum and maximum speed, water-temperature setpoint and dead band, defrost logic, pump control and demand limiting. Wrong minimum speed causes short cycling and poor oil return.

What are the low-frequency limits?

At low speed, oil return, refrigerant distribution and compressor cooling can become marginal. The manufacturer sets a minimum speed and run time. Do not force the unit below them to chase a tiny load.

Inverter vs fixed-speed: which is better?

Inverter is better for variable loads and part-load efficiency; fixed-speed is simpler and cheaper for steady full-load duty. A poorly controlled inverter can be worse than a well-controlled fixed-speed unit.

How should the unit be sized?

Size for the design load, then check the turn-down ratio against the minimum load. An oversized inverter unit may spend its life at the minimum speed, cycling or inefficient. Part-load data should drive the selection.

What controls are needed?

Outdoor reset, water-temperature compensation, pump interlock, defrost and a clear demand limit. The controller should log speed, power and temperatures so part-load behavior can be verified.

How is the savings claim verified?

Compare annual energy using the same load and weather, with measured power at several loads. A single COP comparison is not a savings calculation. Meter the unit for at least a week after commissioning.