Injection Molding Park: Central vs Machine-Side Cooling

Cooling a single injection-molding factory is a capacity question: how many kilowatts, how many machines, which temperature. Cooling an industrial park is a different question: where the central plant sits, how the chilled water reaches 12 buildings, how the cooling cost is allocated, and who pays for the next expansion.

The case below is a typical park: 12 standard factory buildings, 40 injection-molding companies and 25,000 t of total clamping force. The values are a design estimate based on industry indices, not a measured record; a real project must use its own machine list and operating data.

1. Load: clamping force times a coefficient, then diversity

Injection-molding cooling load has a stable empirical relationship with clamping force: about 5 kW of cooling per 100 t of clamping force, including mold cooling and hydraulic-oil cooling. The coefficient is higher for thin-wall, fast-cycle parts and lower for thick-wall parts.

Enterprise type Clamping force Cooling at 5 kW/100 t Simultaneity Diversified load
Small household goods 8,000 t 400 kW 0.55 220 kW
Medium appliances 9,500 t 475 kW 0.62 295 kW
Automotive parts 5,500 t 275 kW 0.70 193 kW
Packaging 2,000 t 100 kW 0.50 50 kW
Total 25,000 t 1,250 kW — 758 kW

Injection-molding machines do not run at full load all year. Order patterns, mold changes and night-shift reductions mean only part of the installed fleet runs at the same time. The 40 companies also peak at different times, so the park-level simultaneity is lower than a single factory’s.

The choice of simultaneity is a commercial risk. At 0.6 the plant is 758 kW; at 0.75 it is 938 kW, 180 kW more and about 130,000 CNY more capex. Too low and a downstream expansion has no capacity; too high and the plant runs at low load for years. A common approach is to use a base load from the diversified calculation and reserve space for a modular addition.

2. Central plant or machine-side units?

Machine-side chillers are the conventional choice: each company buys a small air-cooled unit beside its machines. The park does not fund the cooling, but the site pays for it in three ways: lower efficiency, heat rejected into the workshop and a higher maintenance burden.

For this park, the machine-side capex is about 1.565 million CNY and the central plant about 1.672 million CNY, a difference of only 107,000 CNY. The central plant uses two 400 kW water-cooled screw units, one duty and one standby, two cooling towers, three chilled-water pumps (two duty, one standby) and a pipe network in the service corridor.

Item Machine-side Central plant
Capex 1.565 million CNY 1.672 million CNY
Annual electricity 692,000 kWh 346,000 kWh
Annual energy cost at 0.65 CNY/kWh 450,000 CNY 225,000 CNY
Pipe loss allowance — 5% (about 11,000 CNY/y)
Workshop air-conditioning penalty 120,000 CNY/y —
Annual total cost, including 15-year depreciation 716,000 CNY 415,000 CNY

The machine-side units have a system COP of about 2.6. The reasons are concrete: an air-cooled condenser sees a workshop at 35 °C and a unit inlet near 40 °C in summer; small units start and stop frequently; most have no part-load control. At an average load of 450 kW and 4,000 hours, the annual electricity is 450 ÷ 2.6 × 4,000 = 692,000 kWh.

The central plant has a water-cooled system COP of about 5.2 including the tower and pumps: 450 ÷ 5.2 × 4,000 = 346,000 kWh. A 2,400 m pipe network with good insulation adds 4–6% cooling loss, about 5%, so the energy cost rises from 225,000 to about 236,000 CNY. It is still about 214,000 CNY lower than machine-side.

There is also a hidden cost on the machine-side option: the condensers reject heat into the workshop, raising the summer temperature by 3–5 K. The extra air-conditioning load is roughly 15% of 1,250 kW, or 190 kW, about 120,000 CNY a year. That cost is not on the cooling bill, but it is on the park’s electricity bill.

3. The total cost, not the capex

Including a 15-year straight-line depreciation, the machine-side annual total is about 716,000 CNY and the central plant about 415,000 CNY, a difference of 301,000 CNY. The capex gap is only 107,000 CNY, so it is recovered in about four months of operation.

Expressed per kWh of cooling, the machine-side cost is about 0.40 CNY/kWh including the workshop air-conditioning penalty; the central plant is about 0.23 CNY/kWh, 42% lower. That difference is the economic reason a company agrees to connect to a park network.

4. Three conditions for a central network

Load density. The cooling load per meter of pipe should be at least 0.3 kW/m. This park has 758 kW over 2,400 m, or 0.32 kW/m, just above the line. A spread-out park with long pipes and low load will lose the advantage to pipe loss and pumping.

Similar temperature requirement. Injection-molding mold cooling typically uses 12–15 °C supply and 18–20 °C return, so the network can serve all companies at one temperature. If the park also has a pharmaceutical or electronics tenant needing 7 °C, do not lower the whole network; give that tenant a separate small plant.

A single operating entity. Someone must own the plant, allocate the cooling, maintain the network and plan the expansion. A park with 40 independent companies and no operator will struggle to agree on the connection charge and the capacity reserve.

5. Design details that decide the result

Use a service corridor rather than direct burial. It is easier to inspect, easier to add a tenant and less likely to hide a leak. It costs about 30% more, but the maintenance and expansion benefits are real. Insulate with 40 mm polyurethane and a galvanized steel jacket; support and compensate the above-ground sections every 30 m.

Measure each tenant’s cooling with a Btu meter, not a flow estimate. A two-part tariff with a capacity charge and a consumption charge is common; this park’s consumption charge is about 0.23 CNY/kWh, about 40% below the tenants’ own cost. That is what makes the connection attractive.

The central plant should be modular. Two 400 kW units with one standby cover 758 kW; a 200 kW module can be added when the load grows to 900–950 kW. Do not install one oversized unit for a future load that may never arrive.

Network layout and expansion: the two decisions after the plant size

A central plant is not only a chiller room. The pipe network and the phasing plan decide whether the park can add customers without a second excavation.

Phase Connected customers Cooling load Plant Main pipe
Phase 1 18 380 kW 1 × 400 kW DN200
Phase 2 30 620 kW 2 × 400 kW DN200
Phase 3 40 758 kW 2 × 400 kW + 1 × 200 kW DN250

A walkable service trench costs about 30% more than direct burial, but it can be inspected, extended and tapped without breaking a road. Insulate with 40 mm polyurethane, protect the jacket with galvanized steel, and put anchors and expansion joints at 30 m intervals on the elevated sections.

Hydraulic balance is the design bottleneck. Forty connections at different distances from the plant produce a wide pressure spread; without dynamic balancing valves at each connection and a variable-speed pump maintaining the worst-case differential, the near-end users take too much flow and the far-end users go short. The common fix — raise the pump head — doubles pump power and does not solve the distribution.

Expansion follows the same logic. Build the civil works to the final size, install chillers and pumps by phase, lay the main to the final diameter and the branches to the current phase. A DN250 main at low first-phase flow has a small efficiency penalty, but it avoids replacing the spine later. Longcom’s water chiller page lists the modular plant configurations used in this staged park.

Common questions

Is 758 kW the sum of all machines?

No. It is the diversified load after simultaneity. The installed cooling at 5 kW/100 t is 1,250 kW; the park does not need 1,250 kW at once.

Why is the central plant capex only 10% higher?

Because the machine-side option is many small air-cooled units, each with its own condenser and controls. The central plant gains scale but adds a network and a mechanical room.

What if the load grows?

Add a modular unit and extend the corridor. Reserve mechanical room space and pipe tees at the design stage; a network built for 758 kW can often carry 900–950 kW with a pump change.

Can one network serve 7 °C and 12 °C tenants?

Not efficiently. Lowering the whole network by 1 K raises chiller energy by about 3%. Serve the 7 °C tenant from a separate small plant.

How is the cooling cost allocated?

Use a Btu meter at each connection and a two-part tariff: capacity and consumption. The consumption price should reflect the central plant’s cost, not the tenant’s alternative.

What is the first feasibility test?

Load density: diversified load divided by network length. Below 0.3 kW/m, the pipe loss and pumping usually erase the central-plant advantage.

How do I size a central plant?

Use load diversity, not the sum of machine nameplates. Pipe length and simultaneity decide. A central plant can be smaller than the sum and still meet the peak.

What about machine-side?

Machine-side cooling is simpler for a few machines but duplicates condensers and compressors. Central wins when the park is dense and the load varies.

Further technical reading

LONGCOM can build the diversified load, compare central and machine-side cooling, and design the network and metering for an injection-molding park. For a park feasibility review, contact 400-878-0280 or 13002001280.

Related reading

Chiller plant group control · Water chiller sizing · Chiller plant sensors