The most common mistake in an injection-molding workshop is to buy one small chiller per machine. Twenty machines, twenty chillers: it looks simple and the initial quote is low. Three years later the workshop is hotter, the pipework is a maze and the maintenance log has twenty locations. The electricity and repair bills often exceed what a central system would have cost.
Chilling load should be calculated, not counted. It has two components: the mold, where molten polymer solidifies and releases heat, and the hydraulic oil, which absorbs heat from the pump and valves. They need different temperatures. A mold usually needs 15–25 °C; hydraulic oil is better kept at 30–35 °C. A shared chiller can serve both only with a plate heat exchanger or a mixing loop on the oil side.
The example below is a 20-machine workshop with 250 t clamping force per machine. It is an illustrative calculation, not a quotation.
1. Estimate load from clamping force
Cooling load correlates with clamping force, shot weight and polymer. A practical planning figure is 4–6 kW per 100 t of clamping force. Take the upper end for thin-wall, fast-cycle products; the lower end for thick-wall parts.
| Clamping force | Cooling load | Water flow at ΔT 5 K | Typical product |
|---|---|---|---|
| 100 t | 5 kW | 0.9 m³/h | Connectors, small parts |
| 250 t | 12.5 kW | 2.2 m³/h | Appliance housings, household goods |
| 500 t | 25 kW | 4.3 m³/h | Automotive parts, crates |
| 1,000 t | 50 kW | 8.6 m³/h | Large panels, pallets |
For 20 machines at 250 t: 20 × 12.5 = 250 kW. Add 15% for diversity and future tooling: 288 kW. Select two 150 kW units, with one able to carry the base load and the second brought in at peak. Water flow at ΔT 5 K is 250 × 3,600 ÷ (4.187 × 5 × 1,000) ≈ 43 m³/h.
About 30% of this load may be hydraulic oil. If the machines have independent oil coolers — common on larger presses — the chiller load can fall to about 8.5 kW per machine, or 170 kW total. Confirm the machine specification one by one; do not apply the upper figure to every press.
2. Two water temperatures, one source
Mold cooling. The mold needs low water temperature, high flow and a small temperature rise, so that heat is removed quickly and the cooling time shortens. Supply is typically 15–25 °C; precision molds run at 20 ± 1 °C.
Hydraulic oil. Oil that is too hot accelerates seal aging and oil degradation. Oil that is too cold becomes viscous and increases system pressure loss. A supply of 30–35 °C through a plate heat exchanger is usually right, with a bypass when oil temperature falls below 30 °C.
Barrel cooling. The feed zone of the barrel needs cooling to prevent hopper condensation and bridging, but the water must not be too cold or condensation drips onto the material. Use 25–30 °C water, often taken from the mold return.
| Load | Supply temperature | Return temperature | Control |
|---|---|---|---|
| Mold | 15–20 °C | 20–25 °C | Mixing valve; ±1 °C for precision |
| Hydraulic oil | 30–35 °C | 40–45 °C | Plate exchanger plus thermostatic valve |
| Barrel feed zone | 25–30 °C | 35 °C | Direct supply; avoid condensation |
A shared chiller can produce 12–15 °C water. One branch feeds the molds through a mixing valve to 15–20 °C; the other passes through a plate heat exchanger to cool the oil. If the workshop is dominated by large presses with a high oil load, a separate high-temperature chiller for the oil loop can be more efficient than using the low-temperature machine for both.
3. Central cooling versus machine-side units
Machine-side units are flexible and the initial cost looks lower. Their hidden cost is heat. Each small chiller rejects its condenser heat into the workshop. Twenty units act like twenty heaters, and the workshop can run 5–8 °C above outdoor temperature in summer. The factory then installs air conditioning, paying twice.
Central cooling has a higher capital cost but a higher COP, a single maintenance point and heat rejected outside. For 250 kW and 4,000 hours/year:
| Item | Machine-side | Central |
|---|---|---|
| Equipment cost | 20 × USD 2,100 = USD 42,000 | 2 × 150 kW plus pipework ≈ USD 91,000 |
| COP | 2.8–3.2 | 4.0–4.5 |
| Annual electricity at 250 kW, 4,000 h | 333,000 kWh | 238,000 kWh |
| Annual electricity cost at USD 0.09/kWh | USD 30,000 | USD 21,400 |
| Heat rejection | Into the workshop | Outside, via a dry cooler or tower |
| Maintenance points | 20 | 1 mechanical room |
The electricity saving is about USD 8,600/year; the capital difference is about USD 49,000, giving a simple payback of about 5.7 years. That alone is not compelling. The decisive factors are workshop environment and maintenance. Above ten machines in an enclosed hall, central cooling is usually the better whole-life choice. Below eight machines, or where machines are spread across floors, machine-side units are more practical.
4. Water temperature and cycle time
Mold temperature affects cooling time, and cooling time is typically 50–70% of the molding cycle. A 1 °C reduction in mold temperature shortens cooling by roughly 1–2%, but too low a mold temperature causes short shots, weak weld lines and internal stress.
Example: a 30 s cycle with 18 s cooling. Reducing water temperature by 3 °C shortens cooling by about 8%, to 16.6 s. The cycle becomes 28.6 s, and output rises by 30 ÷ 28.6 − 1 ≈ 4.9%.
At USD 1,100 daily value per machine, a 5% output gain is about USD 55/day — far more than the electricity saved by lowering the temperature. The priority is therefore stable temperature, not the lowest possible temperature.
Stability needs buffer volume and mixing. A chiller staging on and off can swing water temperature by 1–2 K, which appears at the mold as cycle variation. Fit a 3–5 m³ buffer tank and a motorized mixing valve on the mold supply, holding ±1 °C. The buffer also lets the chiller run at a steadier load.
5. Four site problems
Mold passage scaling. Cooling slows and parts show local over-heating. Hard water and small passages scale within three months. Fit a water softener and clean the mold passages quarterly with a weak acid; 0.2 mm of scale can reduce heat transfer by about 5%.
Insufficient flow. The temperature difference between the fixed and moving halves exceeds 2 K. The cause is usually unbalanced branches or undersized pipework, not a lack of total flow. Fit a manifold and flow meters, and balance each circuit; do not simply increase pump speed.
High-pressure alarm in summer. The cooling tower is undersized or the condenser is fouled. Check the cooling water inlet temperature, flow and condenser approach before adding refrigerant.
Hot workshop. The temperature is more than 3 °C above outdoor. Machine-side condensers are rejecting heat indoors. Move the condensing side outside or convert to central cooling; a larger chiller will only make the room hotter.
6. Key parameters
| Parameter | Reference | Note |
|---|---|---|
| Cooling load | 4–6 kW per 100 t clamping force | Upper end for thin-wall fast cycle |
| Mold supply | 15–25 °C | Precision mold 20 ± 1 °C |
| Hydraulic oil supply | 30–35 °C | Bypass below 30 °C |
| Supply–return difference | 5 K | Larger ΔT reduces flow but may affect stability |
| Buffer tank | 3–5 m³ | 5–10 minutes of flow |
| Workshop temperature | No more than 3 °C above outdoor | Higher means heat rejection is inadequate |
7. Common questions
What chiller size for 20 injection machines?
Calculate by clamping force. A 250 t machine is about 12.5 kW, so 20 machines are 250 kW; with 15% margin, 288 kW, selected as two 150 kW units. If the machines differ, sum each machine rather than averaging.
Central or machine-side?
Above ten machines in an enclosed hall, central cooling is usually better: about 30% higher COP, heat rejected outside and one maintenance point. Below eight machines, or across several floors, machine-side units are more flexible. The hidden cost of machine-side is the heat left in the workshop.
Is colder water always better?
No. Colder water shortens cooling, but too cold a mold causes short shots, weak weld lines and stress. Set the mold temperature to the process requirement and hold it within ±1 °C; do not chase the lowest number.
Why is the fixed-to-moving-half temperature difference large?
Flow imbalance. The manifold branches have different resistance, the pipe may be undersized, or one circuit is blocked. Fit a manifold and flow meters and balance each circuit; also check whether the mold water passages are symmetrical.
The workshop is hot. Is the chiller undersized?
Usually not. Machine-side condensers reject heat into the room; twenty units are twenty heaters. Move the condensing side outdoors or centralize. A larger chiller will make the workshop hotter.
Should hydraulic oil be cooled separately?
Check the machine. Large presses often have their own oil cooler and only need 30–35 °C water through a plate exchanger. Small machines share the mold circuit; if the oil becomes too viscous, give it an independent loop at 30–35 °C.
Longcom Environmental Protection Equipment Co., Ltd. can calculate molding load, compare central and machine-side schemes, and design hydraulic balancing for the water circuits. Send the machine list, clamping forces and product cycle to admin@longk.com or call 400-878-0280.
Loads, temperatures and costs are planning estimates. Final selection must use the machine specification, polymer, cycle time, local climate and workshop layout.
What load?
Mould clamping, injection and cooling. The peak is short; size on the heat removed per cycle, not the machine tonnage.
Why 7 °C supply?
It gives a stable mould temperature and faster cycle. Colder supply can freeze the gate or raise condensation.