In an electronics plant, the chiller often cools equipment, not people. SMT placement machines, reflow ovens, coating lines, burn-in rooms and testers all reject heat that must be removed by process water. A supply-temperature swing of 1 K can affect yield; poor water quality can scale a plate heat exchanger or block a nozzle.
Comfort cooling aims at 24 ± 2 °C room air. Process cooling aims at a supply temperature of setpoint ± 0.5 K, stable flow and water that meets the equipment maker’s quality specification. The chiller, piping, buffer and controls must be selected around those three requirements.
This article uses a 30-machine SMT shop as a worked example. The same method applies to coating, testing and assembly, but the accuracy and water-quality requirements must come from the process equipment supplier.
Common questions
What temperature?
Process cooling is usually 15–20 °C supply, not 7 °C building chilled water. A higher supply improves chiller efficiency.
What load?
Sum the equipment heat, not the room area. Use the process duty cycle and diversity. The peak is often short.
What redundancy?
N+1 on the largest module or a standby chiller. The process tolerance decides. A test line cannot stop.
What water quality?
Particles, conductivity and corrosion matter. A plate heat exchanger with fine channels needs filtration.
What control?
Supply temperature and flow, with a fast response. A building control loop is too slow for a process step.
What part-load?
Process load swings. A single fixed-speed chiller may short-cycle. Use variable speed or multiple modules.
What metering?
Power, flow and temperature per line. You cannot allocate cost or find a drift without them.
What acceptance?
A load test at the design condition, plus a step response. A steady-state reading alone does not prove control.
1. Build the load from equipment, not floor area
Start with an equipment list and the heat rejection of each item. A high-speed placement machine may draw 8–12 kW, of which 60–70% becomes heat that must be water-cooled. A reflow oven has heating and cooling zones; the cooling zone load is usually given by the oven supplier. A burn-in room is sized at its full electrical load. Testers vary by model; use 50% of nameplate if no better data is available.
Do not apply a generic W/m² figure to a process-cooling load. The equipment schedule is the design basis.
Where several processes need different temperatures, there are two options: one low-temperature loop at 15–18 °C with mixing, or separate loops. A single loop with mixing is cheaper but harder to control; separate loops cost more but isolate the processes. Below about 500 kW, a single loop with mixing is common; above 1,000 kW, separate loops are more reliable.
2. Worked example: 30 SMT machines
Input: 30 placement machines at 8 kW input, 65% heat rejection; burn-in room 100 kW; test area 50 kW; supply 20 °C, return 25 °C.
Placement load = 30 × 8 × 0.65 = 156 kW. Burn-in 100 kW; test 50 kW. Total = 306 kW.
Flow = 306 × 3,600 ÷ (4.187 × 5 × 1,000) = 52.6 m³/h, say 53 m³/h.
For N+1, use three 160 kW units: two duty units provide 320 kW, and the third stands by. This is a correction to the common “2 × 200 kW, one duty one standby” arrangement: a single 200 kW unit cannot carry a 306 kW process load. If the load falls below 160 kW, one unit can run alone; above that, the second unit starts. The standby unit auto-starts on a duty failure.
Buffer volume: 5–10 minutes of flow. At 53 m³/h, 6 minutes is 5.3 m³; select 5 m³. The buffer absorbs the temperature dip when a fixed-speed compressor loads. Without it, a 1–2 K dip reaches the process and can scrap work in progress. With proper buffering and mixing, the supply can be held within 0.5 K.
| Item | Value | Basis |
|---|---|---|
| Placement machines | 156 kW | 30 × 8 kW × 0.65 |
| Burn-in room | 100 kW | Full load |
| Test area | 50 kW | 50% of nameplate |
| Total process load | 306 kW | Sum |
| Flow | 53 m³/h | 5 K ΔT |
| Chillers | 3 × 160 kW | Two duty, one standby |
| Buffer tank | 5 m³ | 6 minutes of flow |
3. Three measures for ±0.5 K
Buffer tank. Size for 5–10 minutes of flow and place it close to the chiller outlet. The tank also acts as an air separator and stabilizes pump pressure.
Variable-speed compressor or pump. A fixed-speed chiller controls by starting and stopping, which produces a saw-tooth temperature. A variable-speed drive modulates continuously. If the load varies widely, make both the chiller and the pump variable-speed, and prioritize pump control: stable flow matters more to the process than a fraction of a degree.
Three-way mixing or blending. The process may need a lower temperature than the chiller outlet. A three-way valve blends return water into supply. Size the valve for authority of at least 0.3 and match its stroke speed to the load variation.
All three are needed for ±0.5 K. One or two measures usually give ±1.5 K, which is not enough for coating or high-accuracy processes.
4. Water quality and materials
Process cooling is normally a closed loop of deionized water. The reasons are scale, corrosion and ionic contamination of the product. Control conductivity, pH, dissolved oxygen and particulates.
All wetted parts should be stainless steel 304 or 316L. Plate heat exchangers should be all-stainless brazed or gasketed. Do not use copper or carbon steel: deionized water is aggressive, and copper tubes can develop pinholes within months.
Two installation details matter. First, isolate dissimilar metals with insulating gaskets at flanges to prevent galvanic corrosion. Second, install a side-stream filter and deoxygenation, and blanket the loop with nitrogen during long shutdowns.
Conductivity is often specified below 10 µS/cm, but follow the equipment maker’s limit. A mixed-bed resin polisher and a conductivity meter with alarm are good practice.
5. Free cooling: the year-round opportunity
Electronics plants often need cooling in winter. When the outdoor wet-bulb temperature is below the required cooling-water temperature, the compressor can be bypassed and the cooling tower can supply the load directly or through a plate heat exchanger.
For a 306 kW load, 800 equivalent free-cooling hours and a COP of 4.5, the saving is 306 × 800 ÷ 4.5 = 54,400 kW·h/year. At CNY 0.65/kWh, that is about CNY 35,000/year. A free-cooling retrofit (plate exchanger, piping, controls) may cost CNY 150,000–250,000, giving a payback of about 4–7 years.
Check two conditions before committing: the site must have enough low-wet-bulb hours, and the cooling tower must have spare capacity. If the tower was sized for the maximum load and the fans can run at low speed in winter, the retrofit is cheaper.
6. Reliability: three non-negotiable items
Standby capacity. A process-cooling stoppage scraps work in progress; it is not a comfort issue. Provide N+1 and automatic transfer. Do not rely on manual switching.
Dual supply or emergency power. It is not practical to put the whole chiller plant on generator. A workable compromise is to back up one chiller and the chilled-water pump, maintaining minimum flow and temperature.
Water-quality monitoring. Monitor conductivity, flow and differential pressure online, and alarm to the control room. A falling flow often indicates a blocked filter or a leak before the temperature alarm responds.
Key parameters for process cooling
Electronics process cooling is sized from equipment heat, not floor area. The table is the scheme-stage cross-check before the equipment list and the local weather data are applied.
| Parameter | Reference | Why it matters |
|---|---|---|
| Process cooling load index | 150–250 W/m² | Includes equipment and room air; use the middle of the range for SMT |
| Equipment heat rejection | 60–70% of input power | Placement machines and test benches are the dominant loads |
| Supply-to-return difference | 5 K | A 4 K difference raises flow and pipe size |
| Buffer volume | 5–10 minutes of flow | Higher precision uses the upper end |
| Temperature control | ±0.5 to ±1 °C | Coating and inspection need the tighter band |
| Conductivity | 10 µS/cm or lower | Deionized closed loop protects the product and the heat exchanger |
Use the table to test a quotation, not to replace the equipment list. A 30-machine SMT room at 8 kW input and 65% heat rejection has a process load of 156 kW before the burn-in room and test area are added; the floor-area index would understate it. Add the buffer and the N+1 unit after the load is fixed, not before.
Water quality belongs in the same check. A deionized loop with 10 µS/cm or lower conductivity, compatible stainless steel and a closed expansion vessel will keep the heat exchanger clean; a tap-water loop will scale and corrode within months. Free cooling is the third check: if the local wet-bulb is low enough for 2,000 hours or more, the chiller can be off for part of the year. Longcom’s water chiller page lists the process-cooling configurations and materials.