Direct or Circulating: The Return Pipe Decides

A heat-pump water heater can be piped in two ways. In direct heating, cold water passes through the unit once and leaves at the set temperature. In a circulating loop, water in a tank is drawn through the unit, heated a few degrees and returned. Both work; they fail in different places.

The choice is often made on the sales sheet. It should be made on the draw profile, the tank volume and the return pipe. This article explains the difference, the pipe sizing, the insulation and the dead-leg problem, using a 100-person dormitory as the example.

Two hydraulic arrangements

Item Direct heating Circulating loop
Water path Mains → unit → tank or point of use Tank → unit → tank
Leaving temperature Stable at the set point Rises gradually; unit sees tank temperature
Best for Large, variable draw; limited tank Large stratified tank; slow accumulation
Main risk Low flow at small draws; cycling Long heat-up; tank mixing; pump energy
Control Flow switch and modulating valve Tank sensor and pump staging

Direct heating is efficient when the unit can modulate down to the draw. A 10 kW draw on a 40 kW unit may short-cycle. A buffer tank or a variable-speed compressor smooths it. A circulating loop is efficient when the tank is large enough to store the day’s peak and the loop runs at a low temperature difference, but a poorly stratified tank can mix and lose the benefit.

The example: 100 people, 6 m³/day

At 60 L per person per day, the dormitory needs 6 m³/day at 55 °C. With 15 °C municipal water, the temperature rise is 40 K and the daily heat is 6,000 × 4.18 × 40 ÷ 3,600 = 279 kWh. A 10 HP unit with 39 kW nominal heating, derated to 70% in winter, gives about 300 kWh/day, so one unit can cover the daily energy but not the morning peak.

The peak is the design point. If 60% of the water is drawn between 06:00 and 08:00, the peak is 3.6 m³ in two hours, or 1.8 m³/h. Heating 1.8 m³/h through 40 K needs 1.8 × 1.163 × 40 = 83.7 kW. One 39 kW unit cannot do it; the tank must carry the difference. A 3 m³ tank at 55 °C stores about 3 × 1.163 × 40 = 140 kWh above the incoming water temperature, enough to bridge the peak if the recovery starts before the draw.

Pipe sizing

Size the main by velocity, not by the unit’s connection size. At 1.0 m/s, a DN25 pipe carries about 1.8 m³/h; DN32 carries about 2.9 m³/h; DN40 about 4.5 m³/h. A 1.8 m³/h peak through DN25 is at the limit; DN32 gives a quieter, lower-head system.

The pump head is the sum of pipe friction, fittings, the unit’s internal pressure drop and the height. A long return loop with many bends can double the head of a simple direct system. Do not select the pump from the unit’s nominal flow alone. Ask for the unit’s pressure-drop curve at the design flow and add the loop.

DN Flow at 1.0 m/s Typical use
DN25 1.8 m³/h Small branch, one unit
DN32 2.9 m³/h Dormitory main, 2–3 units
DN40 4.5 m³/h Hotel or factory main
DN50 7.1 m³/h Large plant, low velocity

Insulation is part of the design

Insulate both the hot-water pipe and the return pipe. A 20 mm elastomeric or polyurethane layer is a common minimum. On a 15 m run, an uninsulated DN25 pipe at 55 °C in a 20 °C mechanical room loses roughly 20–30 W/m, or 0.3–0.45 kW over the run. That is 2–4% of the daily heat, and more in winter.

Insulation also controls the return temperature. A return pipe that cools from 50 °C to 35 °C before it reaches the tank tells the controller that the tank is colder than it is. The unit runs longer, the pump runs longer, and the tank stratifies poorly. Insulate the return to within 1 m of the tank.

Dead legs and response

A dead leg is a branch between the circulation loop and a fixture that is not continuously flushed. A 15 m dead leg of DN20 holds about 4.7 L. That is not a large heat loss, but it is a response problem: the user opens the tap and waits for 4.7 L of cool water to pass. In a dormitory shower block, repeated waiting becomes water waste and complaints.

Keep branches short, insulate them, and if a branch is longer than 10–15 m, add a local point-of-use heater or a secondary loop. Do not solve a dead-leg problem by raising the tank temperature; that increases standing loss and scaling.

Controls and stratification

In a circulating loop, the tank sensor should be in the upper third, not at the bottom. The unit should heat the top of the tank first and leave the bottom cooler. A tank with a dip tube and a baffle stratifies better than a tank with a side inlet at mid-height. A poorly stratified tank can lose 10–20% of its usable capacity.

In direct heating, a flow switch and a modulating valve are essential. The unit should not run at low flow; the refrigerant pressure will fall and the compressor will cycle. A minimum-flow bypass protects the unit but wastes energy if it is always open. Use a two-position valve that opens only when the draw is below the minimum.

Commissioning the pipework

Flush the pipework before connecting the unit. Solder and weld debris in a brazed-plate heat exchanger is a warranty issue. Fill, vent and pressure-test at 1.5 times the design pressure, then flush until the strainer is clean. Set the pump to the design flow, measure the temperature rise across the unit and record it. A unit that is 2 K short of design rise at design flow is not fully charged or is fouled.

Label the return pipe, the isolation valves and the strainer. The next technician should not have to guess which line is the return. A simple schematic fixed inside the mechanical room door saves more time than a thicker manual.

Which one to choose

Choose direct heating when the draw is large and variable, the tank is small, and the unit can modulate. Choose a circulating loop when the tank is large, the draw is spread over the day, and the loop can be short and well insulated. If the mechanical room is far from the draw, a direct system with a local buffer may beat a long loop; if the tank is already installed, a loop may be the cheaper retrofit.

Common questions

Which is more efficient, direct or circulating?

Direct heating avoids tank mixing and reheating, so it can be more efficient when the unit modulates to the draw. A circulating loop with a large, stratified tank can also be efficient, but a long loop and a mixed tank lose the advantage.

How do I size the hot-water pipe?

By velocity and peak flow, not by the unit connection. At 1.0 m/s, DN25 carries about 1.8 m³/h and DN32 about 2.9 m³/h. A 1.8 m³/h dormitory peak is at the limit for DN25; DN32 is quieter.

Why insulate the return pipe?

An uninsulated return cools before it reaches the tank, so the sensor reads low and the unit runs longer. Insulate both flow and return to within 1 m of the tank, with at least 20 mm.

What is a dead leg?

A branch that is not continuously flushed. A 15 m DN20 branch holds about 4.7 L, so the user waits for cool water. Keep branches short; above 10–15 m, add a local heater or secondary loop.

Can one 10 HP unit serve 100 people?

For 6 m³/day at 40 K, the daily heat is about 279 kWh. A 39 kW unit at 70% winter output gives about 300 kWh/day, but it cannot cover a 1.8 m³/h morning peak alone. The tank must carry the peak.

Where should the tank sensor be?

In the upper third of the tank. Heating the top first preserves stratification. A sensor at the bottom reads the coldest water and makes the unit heat the whole tank.

Which layout is better for long dead legs?

A circulating loop keeps hot water at the tap and cuts wait time, but it adds pump head and heat loss. Direct heating is simpler for compact layouts. Insulate the return and control the pump on temperature or occupancy.

Can I convert direct to circulating?

Yes, but add a return pipe, a pump, a check valve and a control strategy. The heat pump and tank must accept the extra flow. Do not simply tee a return into the outlet; it will short-circuit the tank.

Further technical reading

For piping layout, see Heat Pump Water Piping: Layout, Sequence and Hydraulic Checks. For insulation, see Hot Water Tank Installation and Pipe Insulation. For tank matching, see Buffer Tank and Pump Matching. For commissioning, see Commissioning an Air-Source Heat Pump.

Related reading

Heat-pump water piping · Heat pump and tank matching · Heat-pump commissioning