A commercial air-source heat pump is electrically simple: one compressor, two fans, a circulation pump and a controller. It is also where a disproportionate number of site problems begin. A cable selected on running current alone overheats during starting. An grounding conductor connected to the wrong terminal causes protective devices to operate incorrectly. A residual-current device selected without considering inverter leakage current trips repeatedly. None of these failures is obvious on the day of installation; they appear months later and are often blamed on the machine.
The following sequence covers cable sizing by load type, grounding, protective devices, panel installation and the checks that must be completed before energization. It is a technical reference for a typical three-phase commercial unit; the final design must follow the manufacturer’s data, the low-voltage installation code and local requirements.
Size cables by load type, not by total current alone
Three load families behave differently. Motor loads include the compressor, fans and pumps; their continuous current must be at least 1.25 times rated current, and the voltage drop during starting must be checked. Electric resistance heat has no starting surge but runs at full load for long periods; size it on power and voltage. Control circuits use shielded cable and must be separated from power conductors.
For a 40 kW heat pump, the compressor input may be about 11 kW. At 380 V three-phase, the rated current is about 21 A. Applying the 1.25 factor gives 26 A, so a 4 mm² copper conductor with a normal rating of about 30 A is appropriate. A 6 kW electric heater at 220 V draws about 27 A and requires 6 mm² copper. Control wiring should be 0.5–1.0 mm² shielded twisted pair, in a separate trunking at least 300 mm from power cables.
| Copper cross-section | Approximate current rating | Typical use |
|---|---|---|
| 1.5 mm² | 12 A | Control circuits |
| 2.5 mm² | 20 A | Small fans, sensor supplies |
| 4 mm² | 30 A | 40 kW unit main circuit |
| 6 mm² | 40 A | Electric backup heat, larger units |
| 10 mm² | 65 A | Branch circuits for multiple units |
The table assumes a run under 30 m and normal installation. Above 50 m, voltage drop becomes the governing constraint: keep it below 5% and increase one size if necessary. For four 40 kW units starting together, either stagger the starts by 30 seconds or use soft starters, and size the supply on starting current rather than running current. A shared supply that is adequate for steady operation can still collapse when all four compressors start within the same second.
Grounding: three points that must be bonded, one that must not
Three locations require a protective earth: the metal enclosure of the unit, the control panel door, and the motor frame. Use yellow-green conductors with a cross-section at least half that of the phase conductor. The panel door needs a braided copper bonding strap; a painted hinge is not an earth path. The motor frame must be bonded at its earth terminal, not merely through a fixing bolt.
The one connection that must not be made is between neutral and protective earth at the unit. In a TN-S system, N and PE are separated from the transformer onward. Linking them at the heat pump creates a parallel earth path and can cause residual-current protection to operate incorrectly. The measured earth resistance should not exceed 4 Ω. On a roof, the building lightning-protection earth may be used if its measured resistance is acceptable; if the local soil resistivity is high, use additional rods or a proper resistance-reduction system rather than commissioning without a measurement.
Protective devices and their selection
A circuit breaker provides short-circuit and overload protection. Its rated current should follow the 1.25 factor for motor loads, and its breaking capacity must match the prospective short-circuit current at the panel. A residual-current device protects people and equipment; 30 mA with an operating time of no more than 0.1 s is the usual target. Inverter-driven units can have standing leakage current, so a Type B or time-delayed device may be needed. Do not solve nuisance tripping by increasing the trip current; that removes the protection.
A contactor handles motor starting and stopping, with contact rating at least 1.5 times the load. A thermal overload relay is set to the motor’s rated current. A phase-sequence relay is mandatory for scroll compressors: reverse rotation can damage the scroll set within tens of seconds, and the relay costs far less than a compressor. Surge protection is recommended for roof-mounted equipment.
Breaking capacity deserves explicit attention. A distribution board may have a prospective short-circuit current above 10 kA; a breaker rated 6 kA cannot safely clear a fault. Also check discrimination: the breaker’s trip current must be below the cable’s continuous rating, otherwise the cable can overheat while the breaker remains closed.
Panel location, cooling and moisture
Mount the panel close to the unit, out of direct sun and rain, with a minimum IP54 enclosure indoors and IP65 outdoors. The bottom of the enclosure should sit 1.2–1.5 m above the floor, the door should open toward the service aisle, and each circuit should be labeled. Leave at least 1 m in front for door swing and at least 0.3 m between adjacent panels for heat dissipation.
Heat is the hidden failure mode. Relays, breakers and inverters all dissipate heat; a sealed outdoor enclosure in summer sun can exceed 70 °C internally, which shortens component life sharply. Fit a sun shield and ventilation fan, and use a panel air conditioner where several inverters are installed. In coastal or basement locations, add an anti-condensation heater because dew inside the panel causes tracking and short circuits.
Pre-energization checklist
Before power is applied, measure insulation resistance phase-to-earth with a megohmmeter, having disconnected sensitive controllers to avoid damaging them. The usual acceptance value is at least 1 MΩ. Confirm earth continuity at every bonded point. Check phase sequence with a phase-sequence meter and jog the compressor to confirm rotation. Confirm the supply is 380 V ±10%; outside that range, the compressor may overheat and trip, and the supply should be corrected rather than worked around.
Also check terminal tightness, protection settings, sensor readings against ambient conditions, and the emergency stop. The emergency stop must be tested under control, not merely inspected. If the unit is inverter-driven, confirm the Type B residual-current device and the shielding of the control cable. All electrical work must be carried out by a licensed electrician; the owner should not modify the wiring after commissioning.
Boundary: the assumptions behind the electrical requirements
The cable, grounding and protection tables above assume a three-phase 380 V commercial unit, a TN-S supply and a cable run under 30 m. Change any one of those and the calculation changes. The boundary conditions are as important as the tables.
| Case | What changes | Check before design |
|---|---|---|
| VFD unit | Higher standing leakage current and harmonic noise | Type B or time-delayed RCD; shielded control cable |
| Single-phase unit | Different current, cable and protection values | Do not apply the three-phase table |
| Cable run over 50 m | Voltage drop becomes the limiting criterion | Keep drop within 5%; upsize one step if needed |
| Multiple units on one supply | Starting current stacks | Diversity 0.8–0.9; stagger starts by 30 s |
| TN-C-S or mixed grounding | N and PE may not be separated at the unit | Confirm the supply arrangement before bonding |
| High ambient or sealed panel | Component derating and condensation risk | Panel cooling or anticondensation heater |
A VFD unit is the most common boundary change. The drive’s leakage current can exceed the 30 mA threshold of a general-purpose RCD, especially at startup. Select a Type B device or a device with a short delay, and keep the control cable screened and separated from the power cable. Do not solve nuisance tripping by raising the trip current; that removes the protection the device was installed for.
Long cable runs are an electrical problem before they are a voltage problem. A 5% drop at the compressor terminals can cause a high-current trip on a hot day, and the cause is often misdiagnosed as a compressor fault. Check the run length, the conductor size and the starting current together. Local low-voltage code and the approved design file take precedence over this article, and termination must be done by a licensed electrician. Longcom’s air-source heat pump page gives the electrical data for each model family.
Common questions
What happens if the cable is undersized?
The conductor runs hot, voltage drop increases, and the compressor may trip on undervoltage during starting. Insulation ages faster and, in the worst case, the cable becomes a fire risk. The 1.25 factor on motor rated current is a minimum, not a target.
Why does the residual-current device keep tripping?
Check insulation resistance first. If the unit has an inverter and the device is a standard Type AC, replace it with a Type B or time-delayed device. Do not increase the trip current to stop nuisance trips.
What if the earth resistance cannot reach 4 Ω?
Use the building earth on roof installations if its measured resistance is acceptable. Otherwise add electrodes or a resistance-reduction treatment. A unit with an unsatisfactory earth should not be commissioned.
Does the control panel need air conditioning?
If it contains several inverters or the surrounding temperature regularly exceeds 40 °C, yes. A sun shield and ventilation fan may be enough for a simple panel; the decision should be based on measured internal temperature against the component rating.
Can the phase-sequence relay be omitted?
Not on a scroll compressor. Reverse rotation damages the scroll set, and repair cost is far higher than the relay. It is one of the lowest-cost protective devices on the unit.
Can several units share one panel?
Yes, but each unit needs its own breaker and protection so that one fault can be isolated. Size the incoming supply on the sum of running currents with a diversity factor of 0.8–0.9, and check the starting current of the largest unit.
What cable and breaker?
Size by current, voltage drop and routing, then check the terminal and lug. The breaker protects the cable, not just the compressor. Use the manufacturer’s schematic.
What pre-energization checks?
Insulation resistance, phase rotation, ground continuity, torque and panel cooling. Record each. Energizing without these risks a repeat failure.
Related reading
- 220 V or 380 V: Choosing the Power Supply
- Commissioning an Air-Source Heat Pump
- Heat Pump Fault Codes and Troubleshooting
- Installing an Air-Source Heat Pump
Related reading
Heat-pump commissioning · Installation stages · Heat-pump maintenance