Heat pumps · Chillers · Sludge drying systems
Industrial cooling · Process

Ice Storage Chillers: When the Tariff Pays

Ice storage is not a different kind of chiller. It is a different operating schedule. The chiller charges an ice bank at night, when electricity is cheap or when the plant has spare capacity, and the ice melts during the day to carry part or all of the cooling load. The chiller may be smaller, the peak demand may be lower, and the tariff bill may fall.

It is also easy to sell badly. A project with a small peak/off-peak tariff gap, a short charge window or no space for a tank will spend capital on a system that cannot recover it. The economics have to be checked before the ice tank is selected.

1. The principle and the modes

An ice storage system uses a chiller with a brine loop to freeze water in a tank or in encapsulated modules. The stored energy is mostly latent heat: melting one metric ton of ice absorbs about 93 kWh, so a tank of a few cubic meters holds a substantial cooling reserve. In practice, the usable storage density is lower, typically 45–60 kWh per m³ of tank volume; use the vendor’s certified data, not the theoretical latent heat.

There are three operating modes:

Chiller priority. The chiller carries the load and the ice bank supplements peaks. The chiller runs efficiently, the tank is smaller, and the peak shaving is partial.

Storage priority. The ice bank carries the load first, and the chiller starts when the storage is depleted. The peak demand falls furthest, but the chiller may start late and run at a high load.

Full storage. The ice bank carries the entire design-day load. The chiller is sized for the night charge only, which can be much smaller than the daytime peak. This is the most aggressive and the most space-intensive option.

2. When ice storage fits

Condition Why it matters Warning sign
Large peak/off-peak tariff gap The saving is the price difference, not the storage itself Gap below about 0.4 CNY/kWh
Charge window of 8 hours or more The chiller must rebuild the ice between peaks Six hours or less with a high storage fraction
Daytime peak capacity constraint Storage reduces the electrical demand and the chiller size The transformer has ample spare capacity and demand charges are low
Space for a tank and brine loop Storage density is finite; the tank is not small No mechanical room or roof space
Load concentrated in daytime The tank must be discharged, not idle 24-hour flat load with little peak
Chiller can make low-temperature brine Ice charging needs −5 to −6 °C or lower Standard comfort chiller without a low-temperature map

The tariff condition is the first filter. If the peak and off-peak prices are close, the storage loses money before any equipment is bought. The second filter is the load shape: a data center or a continuous process has little peak to shift, while an office, mall or cinema has a pronounced afternoon peak.

3. Sizing the tank and the charge capacity

Start with the daily cooling energy, not the peak kW. For a 1,000 kW peak, 10 equivalent full-load hours, the daily load is 10,000 kWh. If 25% is shifted to storage, the tank must deliver 2,500 kWh. At 50 kWh/m³, the gross tank volume is about 50 m³; add 10–15% for unusable volume and stratification.

The charge chiller must rebuild 2,500 kWh within the off-peak window. Over 8 hours, the average charge load is 312 kW, before the charging COP penalty. If the chiller also carries a base load during the day, the total capacity is the larger of the daytime base plus charge, or the peak minus storage. This is why a storage system does not simply shrink the chiller by the storage fraction.

Item Example value Basis
Peak load 1,000 kW Design day
Daily cooling energy 10,000 kWh 10 equivalent hours
Storage fraction 25% 2,500 kWh
Tank volume 50–58 m³ 50 kWh/m³ plus margin
Charge window 8 h Average 312 kW
Chiller capacity 750–850 kW Peak minus storage, plus charge constraint

4. The economics, with the penalty included

Ice charging runs the chiller at a lower evaporating temperature, so its COP is lower than in comfort mode. A standard chiller may drop 20–30% in COP during charging; a dedicated low-temperature chiller may drop less. The storage also has a round-trip loss from tank heat gain and pump work, typically 5–10%.

Example: shift 2,500 kWh from a peak tariff of 1.2 CNY/kWh to an off-peak tariff of 0.4 CNY/kWh. The daytime cost avoided is 3,000 CNY. The charge electricity, at a 10% penalty, is 2,750 kWh, costing 1,100 CNY. The gross saving is 1,900 CNY/day. Over 300 equivalent days, that is 570,000 CNY/year. If the tank, brine loop, controls and larger chiller add 1.2 million CNY, the simple payback is about 2.1 years.

The example is deliberately round. Change the tariff gap to 0.2 CNY/kWh and the annual saving falls to about 285,000 CNY; the payback doubles. Change the charge window to 6 hours and the chiller must be larger, raising the capital cost. The sensitivity, not the headline payback, decides whether the project is robust.

5. Integration details

Brine temperature. The chiller must be rated for the charging supply temperature, usually −5 to −6 °C, and the tank must be protected against freezing and stratification. A standard comfort chiller cannot be converted by changing the setpoint.

Pump and piping. The brine loop has a higher pressure drop and a lower specific heat than water. Size the pump on the glycol mixture and the lowest temperature, not on water at 20 °C.

Controls. The sequence must decide when to charge, when to discharge, and how to avoid simultaneous charge and discharge. A storage controller that does not see the tariff period, the tank state of charge and the building load will either under-use the tank or run the chiller at the wrong time.

Metering. Install separate energy meters for the chiller, the brine pump and the tank loop. Without them, the savings cannot be verified and the performance guarantee cannot be settled.

6. Commissioning and the risks

Test the full charge, the full discharge, the changeover and the design-day simulation. Record the tank state of charge, the brine temperatures, the chiller power and the delivered cooling. A tank that charges in 12 hours instead of 8 is short of capacity; a tank that discharges in 4 hours instead of 6 is stratified poorly or undersized.

The main risks are tariff changes, space, low-temperature chiller availability and control complexity. A tariff that changes after the investment can erase the saving. A tank that cannot be inspected or cleaned becomes a future problem. And a control sequence that is not commissioned is a tank that sits full while the chiller runs.

Common questions

Does ice storage reduce the chiller size?

It can, but not by the full storage fraction. The chiller must still carry the daytime base and recharge the tank within the off-peak window. The charge constraint often sets the size.

How much space does an ice storage tank need?

At 45–60 kWh/m³, a 2,500 kWh storage needs roughly 45–60 m³ of gross tank volume, plus access and piping. That is a mechanical room or roof decision, not a small add-on.

Is ice storage suitable for a data center?

Usually not for the base load, because the load is flat and the peak/off-peak gap is small. It can be useful for a short emergency cooling reserve, but that is a different value proposition from tariff shifting.

How much does the charging COP drop?

Typically 20–30% for a standard chiller, less for a dedicated low-temperature machine. The exact figure is in the chiller’s low-temperature map; use it in the economics.

Can a standard chiller be used for ice storage?

Only if it is rated for the brine temperature and the charging condition. A comfort chiller converted by changing the setpoint may freeze the evaporator or lose most of its capacity.

What is the first number to check?

The peak/off-peak tariff gap and the charge window. If either is weak, the storage cannot pay back, regardless of the tank design.

When does ice storage pay?

When the peak-to-night tariff gap is wide, the charge window is long and the tank space exists. The low-temperature charge penalty must be included.

What space and penalty?

Ice storage needs a tank and a chiller that can charge at low temperature. The penalty can erase the saving. Model both.

Further technical reading

LONGCOM can check the tariff gap, load shape, charge window and tank space before an ice-storage scheme is priced, and define the metering that proves the saving. For a feasibility review, contact 400-878-0280 or 13002001280.