A campus hot-water project is usually presented as a volume question: 10,000 beds, 50 liters per bed, 420 m³ per day. The volume is the easy part. The difficult part is that about 70% of that water is drawn between 17:00 and 23:00, and the last block must still receive 55 °C when the first block has finished.
The case below is a 10,000-student apartment scheme in a southern Chinese city with a mild winter. It uses the design method rather than a single installed record: the load is built from beds, the plant is split into four zones, and the storage is sized to move the evening peak into a 19-hour recovery window.
1. Daily demand: three coefficients, three different jobs
The shower allowance sets the water per use. Dormitory showers typically fall in the 40–60 L per person per use range; 50 L corresponds to a 10 L/min shower for five minutes. If the measured average is seven minutes, the real allowance is 70 L, and a scheme written at 50 L will run short in exam week.
The occupancy coefficient determines how many beds actually draw water. A 10,000-bed campus may have 90% resident students, but when day students, home weekends and outside showering are deducted, 0.84 is a reasonable design value. Small blocks need a higher coefficient because the sample is smaller and the variance larger.
10,000 × 50 × 0.84 = 420 m³/day.
Cross-check with the hourly coefficient: 420 ÷ 24 = 17.5 m³/h; multiplied by 2.8 gives 49 m³/h. The same figure comes from 70% of the daily water in six hours: 420 × 0.7 ÷ 6 = 49 m³/h. If the two methods differ by more than 20%, the occupancy or the timetable assumption is wrong.
2. Heat demand: the winter case decides the plant
At a 10 °C make-up and 55 °C supply, the daily heat is:
420,000 × 4.187 × 45 ÷ 3,600 ≈ 21,983 kWh/day.
In the coldest month the makeup water often falls to 5–8 °C. At 5 °C the temperature rise is 50 K and the daily heat rises to about 24,425 kWh, 11% above the nominal case. A plant sized on 10 °C will be short for the coldest forty days.
3. Four zones, not one large mechanical room
A single central plant serving 10,000 beds may have a main pipe run of more than 450 m. A DN150 insulated main loses about 0.4 K per 100 m, so 450 m costs 1.8 K and adds about 12 m of pump head. The pumping energy can exceed the saving from building one mechanical room.
Split the campus into four zones of 2,500 beds. Each zone draws 105 m³/day and its mechanical room sits in a podium or roof equipment room within 150 m of the farthest block.
| Item | Per zone | Four zones |
|---|---|---|
| Beds | 2,500 | 10,000 |
| Daily water | 105 m³ | 420 m³ |
| Summer daily heat | 5,496 kWh | 21,983 kWh |
| Winter daily heat (50 K) | 6,106 kWh | 24,425 kWh |
| Recovery window | 19 h (22:00–17:00) | — |
| Required output, summer | 289 kW | 1,157 kW |
| Required output, winter | 321 kW | 1,285 kW |
At an ambient of 7 °C, a hot-water heat pump may deliver about 0.78 of its nominal capacity. To deliver 321 kW in winter, the nameplate requirement is 321 ÷ 0.78 ≈ 412 kW. Four 110 kW units give 440 kW per zone, or 16 units for the campus. This is the normal scale for 10,000 beds; it is not a reason to install one 440 kW machine, because a single large unit loses the redundancy and the part-load control.
4. Storage: 70–80% of daily demand
Each zone needs 74–84 m³ of storage for a 105 m³ daily demand. Two 40 m³ tanks give 80 m³, or 76% of daily demand.
The tank moves the six-hour peak into the 19-hour recovery window. An 80 m³ tank at 55 °C blended to 45 °C can deliver about 80 × (55 − 10) ÷ (45 − 10) ≈ 103 m³. During the six-hour peak the 440 kW plant adds about 440 × 6 × 19.1 ÷ 1,000 ≈ 50 m³, so the zone can cover about 153 m³ against a 105 m³ daily demand. The margin is deliberate: it covers a cold snap, a late event and a tank that is not fully mixed.
There is a hydraulic constraint that is easier to miss than the tank volume. A 440 kW zone with four units and two 45 m³/h pumps gives 22.5 m³/h per unit, below the 25 m³/h minimum of many heat exchangers. The unit will trip on water flow. Use four 25 m³/h pumps, one per unit, or combine the tanks into one 80 m³ tank and enlarge the main.
5. Distribution: measure at the farthest block
The four loops range from 120 m to 480 m, and the resistance ratio between the nearest and farthest loop can reach 2.5–3.0. In a direct-return system the near branches take more than 30% of the flow, the far terminals receive 3–5 K less, and the plant gauges look normal while students report cold water.
Use three layers of control: a static balancing valve on each zone main, set to the design flow and recorded on the valve tag; a dynamic balancing valve on each riser branch; and variable-speed circulation with the pressure sensor at the farthest zone main, not at the pump outlet. A sensor at the pump outlet holds the near-end pressure and leaves the far end short.
Commission by the proportional method: open all valves, measure each branch, calculate the ratio of actual to design flow, and start with the branch having the highest ratio. Four zones and 28 risers typically take three days for two technicians. The acceptance criterion is a flow deviation within 10% per zone and a terminal temperature difference within 2 K between the nearest and farthest points.
Set the supply temperature from the farthest point. A 57 °C outlet, 55 °C at the farthest terminal and 45 °C return is the result of a 1.8 K main loss. If the outlet is set at 55 °C, the farthest block receives 53 °C and the mixing valve runs wide open.
6. Roof load, lifting and waterproofing
A 40 m³ stainless tank weighs about 4.5 t empty, 40 t full, plus 1.5 t of supports and foundation: 46 t over a 5 × 4 m footprint, or 23 kN/m². A typical accessible roof live load is 2.0 kN/m², a factor of 11. The roof will not collapse on the first day, but the slab will crack over two or three heating seasons.
Three positions are viable: above a column-and-beam node beside the stair, a podium roof, or a ground-level mechanical room. On a roof, use a steel transfer frame: two 200 mm I-beams spanning two main beams, with the tank sitting on the steel so the load goes to the columns rather than the slab. The structural engineer must issue a written check; “we always put it there” is not a calculation.
A 110 kW unit weighs about 1.1 t in operation. Its base should be 200 mm above finished floor, with 10 mm rubber pads, 1.2 m between units and 1.5 m clear on the air-inlet side. Four units in a row without this clearance recirculate warm air, raise the inlet temperature by 2–3 K and lose about 4% of heating capacity.
Plan the lifting window with the university. A 25 t crane standing on the ring road at an 18 m radius needs a 2.2 × 2.2 m roof opening, and the lift should be scheduled between 06:00 and 08:00 to avoid student traffic. Seal the opening with a steel plate and waterproof sleeve after installation. Pipes through the roof need a 250 mm concrete upstand and a 300 mm waterproof turn-up. These three details are the common leak paths; a hose test on each is more reliable than a photo record.
7. Metering, holidays and phased construction
At 16 students per shower position, a 10,000-bed campus needs about 620 positions. At 0.6 m³/h per position and a 30% simultaneous use, the instantaneous flow is about 112 m³/h, 2.3 times the heat-based peak of 49 m³/h. The pipes, supply pumps and controllers are sized for 112 m³/h; the heat pump and tank are sized for 49 m³/h. Mixing the two numbers produces a plant that barely runs in daytime.
Billing at 0.04 CNY per liter makes a 50 L shower cost about 2 CNY. A free monthly allowance of 1.5 m³ is common. The purpose is demand control: it reduces the average shower from 60–80 L to 45–55 L, a 15–25% reduction. Do not size the plant on the reduced volume; billing faults, a temporary suspension and a new student’s first month can all push demand back up.
During holidays only 3–8% of students remain. Run one zone with two units at a 5 °C frost-protection setpoint, drain the other three zones and tag the valves. Outdoor pipes need 30 mm insulation and 12 W/m self-regulating heat tracing, switched at 4 °C and off at 8 °C, interlocked with the plant so the trace does not run all holiday.
For phased construction, build the interfaces for the full campus in phase one: mechanical room area and foundations for four zones, and a DN150 main installed once. Phase two then adds units, tanks and pumps at the reserved tees, with a night-time changeover. If phase one installs a DN100 main for 5,000 beds, phase two will either re-dig the road or run at reduced flow.
Seasonal operation table
A campus is not one load. The same 420 m³/day design has five operating modes, and each has a different minimum plant. The table converts the design into an operating plan for the facilities team.
| Period | Occupancy | Daily water | Operating mode | Must-do action |
|---|---|---|---|---|
| Normal term | Full | 420 m³ | All four zones; night storage | Run each unit at full speed for 30 minutes weekly |
| Exam week | Full | 440–460 m³ | All zones; start two hours earlier | Leak and illegal-tap check |
| Winter holiday | 3–8% | 13–34 m³ | One zone, two units, 5 °C frost protection | Drain and tag the other zones; keep trace heating on |
| Summer holiday | 5–15% | 21–63 m³ | One zone, intermittent | Weekly flush to avoid stagnant water |
| Seven days before term | 10% to full | 42 to 420 m³ | Zone-by-zone restart; slow heat-up | 30-minute flush at 60 °C |
The winter case is the one that catches operators. The heat pump is sized for the winter design day, but the load falls to 13–34 m³/day; running all four zones at 5 °C frost protection wastes circulation and can freeze a remote branch. Isolate three zones, drain them, tag the valves and keep the trace heating on a 4–8 °C thermostat. The summer case is the opposite: low load and high ambient, so stagnant water and legionella risk matter more than energy.
The restart week is a commissioning exercise, not a valves-open exercise. Start one zone, raise the temperature slowly, flush the branches and confirm the farthest block reaches temperature before adding the next zone. If the whole campus is opened on the first morning, the plant sees a peak that the design did not intend and the first showers are cold.
Put these modes in the O&M manual and in the BMS schedule. Modular layouts for this campus are shown on the air-source heat pump page.
Common questions
Why not one central mechanical room?
Because the main run and the pump head cost more than the extra mechanical rooms. Beyond about 400 m, the 1.8 K loss and 12 m of head make distributed zones the lower-energy choice.
Is 50 L per bed per day enough?
It is a design allowance for a five-minute shower. If the measured average is seven minutes, use 70 L or install flow restrictors; otherwise the evening peak will run the tanks down.
Why four zones rather than two?
Four zones keep each main under 150 m and each mechanical room small enough for a podium or roof. Two zones would need 210 m³/day each and a much larger tank and pump set.
Can the tank sit directly on the roof slab?
No. At 23 kN/m² it is about 11 times the live load. Use a steel transfer frame to the columns, or move the tank to a podium or ground mechanical room.
Should the plant be sized on the billing volume?
No. Billing reduces average use but can rebound. Size on the design allowance, and treat the billing saving as margin.
What is the most common commissioning fault?
Low flow through one unit in a multi-unit zone. Check the pump-to-unit pairing and the minimum flow before balancing the loops.
How do I zone a campus?
By demand pattern and pipe distance: dormitories, sports, kitchens and teaching. Each zone gets its own storage and setpoint. A single loop couples the peaks.
What storage size?
Cover the morning and evening draw minus the heat-pump output. Add a margin for the farthest block. Check the recovery time.
Further technical reading
- School Dormitory Hot Water System Design
- Hot Water Demand Calculation
- Matching Heat Pump Capacity to Storage Volume
- University Hot Water BOT: Cash Flow
LONGCOM can build the zone load, tank volume, roof load and phased interface for a campus-scale hot-water scheme. For a 10,000-bed design review, contact 400-878-0280 or 13002001280.
Related reading
Heat-pump water piping · Heat-pump commissioning · Heat-pump price factors