A comfort-cooling estimate starts with floor area. A process-cooling estimate starts with heat. An office may be 80–120 W/m²; a commercial building 150–200 W/m². A factory with an injection-molding line, a hydraulic power pack and a compressed-air dryer does not fit either number. The chiller must follow the heat inventory, the simultaneous factor and the 24-hour profile.
This article builds a process load from equipment, not from floor area, and turns it into a flow and a chiller selection. The worked example is a 450 kW plant.
Start with a heat inventory
List every source that adds heat to the chilled water. For each item, record the connected load, the simultaneity factor and the hours of operation. Do not use the motor nameplate as the heat load; use the absorbed power or the process heat release.
| Source | Connected | Simultaneous | Diversified |
|---|---|---|---|
| Process equipment | 350 kW | 1.00 | 350 kW |
| Hydraulic power pack | 40 kW | 0.80 | 32 kW |
| Compressed-air aftercooler | 20 kW | 0.75 | 15 kW |
| Chilled-water pump heat | 18 kW | 1.00 | 18 kW |
| Tank and pipe gain | 10 kW | 1.00 | 10 kW |
| Total diversified | — | — | 425 kW |
Add a margin of 10–15% for load growth, fouling and control error. At 12%, the design load is 425 × 1.12 = 476 kW. Round to 480 kW. The margin is not a substitute for a load calculation; it is an allowance for what the calculation cannot see.
Turn kW into flow
For water, Q = 1.163 × flow (m³/h) × ΔT (K). At a 7/12 °C design, ΔT is 5 K. A 480 kW load needs 480 ÷ (1.163 × 5) = 82.5 m³/h. At 6 K, the flow is 68.8 m³/h; at 4 K, 103 m³/h.
The flow is not a detail for the pump supplier. It sets the pipe size, the pressure drop and the evaporator’s minimum flow. A chiller selected at 5 K but operated at 3 K will trip on low flow or freeze. The design must state the flow and the allowable range.
| ΔT | Flow for 480 kW | Consequence |
|---|---|---|
| 4 K | 103 m³/h | Larger pipes and pumps; lower chiller efficiency |
| 5 K | 82.5 m³/h | Standard 7/12 °C design |
| 6 K | 68.8 m³/h | Smaller pipes; check evaporator minimum flow |
| 8 K | 51.6 m³/h | Low-temperature process; verify chiller map |
Do not average a 24-hour load
A comfort system can use a diversity factor because not every office is occupied at once. A process line may run all three shifts at a constant 80% load, then stop for cleaning. The chiller must follow the peak, and the part-load profile decides the number of machines.
Plot the load for a typical week, not a design day. If the plant runs 24 hours at 60–85% load, two equal chillers are a poor choice: one machine will run at low load most of the time. A 300 kW + 180 kW pair, or three 160 kW machines, follows the load better. If the plant has a 4-hour peak and a long low-load period, a small machine plus a large one is better than two equal machines.
| Profile | Suggested arrangement | Reason |
|---|---|---|
| 24 h, 60–85% | 2–3 equal machines | Stable part-load; easy staging |
| Day peak, night low | Large + small | Small machine covers night |
| Batch process, high peak | 2 large + 1 small | Peak capacity with turndown |
| Critical process, N+1 | 3 machines, 2 duty | One standby |
Measure before you buy
If the plant already has a chiller, measure the existing load before replacing it. Clamp the compressor current, read the chilled-water flow and the entering/leaving temperatures, and log for a week. The heat balance is Q = 1.163 × flow × ΔT. Compare it with the equipment’s absorbed power and the process output.
Do not rely on the chiller’s display alone. A flow sensor that is 10% high makes the load 10% high, and the new machine will be oversized. A portable ultrasonic flow meter and a calibrated clamp meter are enough for a pre-purchase survey.
Simultaneous heating and cooling
Some processes need chilled water and hot water at the same time: a mold at 15 °C and a drying oven at 80 °C. A heat pump can move heat from the chiller to the hot side, but only if the temperatures overlap. A 7/12 °C chiller producing 45 °C hot water is a heat-recovery machine; a standard chiller cannot. If the site has simultaneous loads, calculate the recovery potential before choosing a standard chiller.
Selection checklist
State the design load, the flow, the supply and return temperatures, the simultaneous factor, the 24-hour profile, the minimum load, the ambient design condition and the altitude. For a process, add the allowable temperature stability and the consequence of a 30-minute stop. A chiller that is 10% oversized is not a problem; a chiller that cannot unload below 30% will cycle and wear the compressor.
Ask for the part-load performance at the site’s condensing condition, not only the standard rating. The annual energy is the sum of hours at each load, not the full-load COP multiplied by full-load hours.
Boundary
This method is for a plant with a known equipment list. For a new process with no equipment schedule, use the process designer’s heat balance, not a floor-area estimate. For a building with both comfort and process load, calculate the two separately and add them at the correct simultaneity; do not apply an office diversity factor to a furnace.
Common questions
Can I use W/m² for a factory?
Only as a first sanity check. A factory with process heat needs an equipment heat inventory. Floor-area indices are for comfort cooling and can be wrong by a factor of two in a process plant.
What margin should I add?
10–15% for load growth, fouling and control error. Do not use the margin to hide an incomplete heat inventory; list the missing loads and agree the allowance.
How do I convert kW to water flow?
Q = 1.163 × flow (m³/h) × ΔT (K). A 480 kW load at 5 K needs 82.5 m³/h. At 7/12 °C, ΔT is 5 K.
Why not two equal chillers?
If the plant runs at 60–85% for most hours, two equal machines force one to run at low load or cycle. A large-plus-small or three-machine arrangement follows the load better.
What measurements do I need before replacement?
Compressor current, chilled-water flow, entering and leaving water temperature, and a one-week log. Calculate Q = 1.163 × flow × ΔT and compare with the existing machine’s absorbed power.
Is a 10% oversized chiller acceptable?
Usually yes, if it can unload to the minimum load. A machine that cannot unload below 30% will short-cycle at night, which costs more than the extra capacity.
How do I build the heat inventory?
List every load: process, cooling, pumps, fans and occupied spaces. For each, record kW, hours and diversity. Sum by hour to get the 24-hour profile. The peak hour and the annual energy come from that table, not from a rule of thumb.
What if loads overlap?
Add the coincident loads and apply a diversity factor only with evidence. Overlapping batch processes can double the peak. If diversity is assumed without measurement, the chiller will be undersized on the worst day.
Further technical reading
For part-load selection, see Chiller Selection: Full-Load COP Is Not the Decision. For staging, see Why Chillers Are More Efficient at Part Load. For heat transfer, see Chiller Evaporator and Condenser Heat Transfer. For injection molding, see Injection Molding Chiller Capacity.
Related reading
Chiller cooling load · Selection margin mistakes · Water chiller sizing