Heat pumps · Chillers · Sludge drying systems
Industrial cooling · Process

Chiller Electrical Wiring and Starters

The electrical package of a water chiller fails more often than its refrigeration circuit. The refrigeration side is commissioned by the manufacturer; the electrical wiring is often left to the installation contractor, with a single system diagram and the rest based on experience. When experience is sufficient, nothing happens. When it is not, two failures appear: cables overheat and contactors chatter because voltage drop is excessive, or starting current trips the upstream breaker and takes the building down.

Both can be calculated at drawing stage. The sequence is: calculate current, select cable, define starting method, and set protection. Each step has a criterion, not a rule of thumb.

Calculate current accurately, including auxiliaries

For a three-phase induction motor, current is I = P ÷ (√3 × U × cosφ × η). In practice, power factor and efficiency are combined into a simplified factor: I ≈ 1.9 × P, or about 1.9 A per kW of shaft power at 380 V.

For a chiller, P is compressor input power, not cooling capacity. A 200 kW water-cooled screw chiller at COP 5.0 has about 40 kW compressor input and 76 A running current, but 95 A including pumps and fans. A 400 kW machine at COP 5.0 has 80 kW and 152 A compressor current, 190 A total. An 800 kW machine at COP 5.2 has 154 kW and 293 A, 366 A total. A 1,000 kW centrifugal at COP 5.6 has 179 kW and 340 A, 425 A total. A 400 kW air-cooled screw at COP 3.0 has 133 kW and 253 A, 316 A total.

The last figure is counter-intuitive: the same 400 kW cooling capacity needs more than twice the current when air-cooled, because the higher condensing temperature and lower COP require more compressor work. Air-cooled projects need a supply capacity estimated on that basis, not on the water-cooled figure.

Cooling capacity Type and efficiency Compressor input Compressor current Total with auxiliaries
200 kW Water-cooled screw, COP 5.0 40 kW 76 A 95 A
400 kW Water-cooled screw, COP 5.0 80 kW 152 A 190 A
800 kW Water-cooled screw, COP 5.2 154 kW 293 A 366 A
1,000 kW Water-cooled centrifugal, COP 5.6 179 kW 340 A 425 A
400 kW Air-cooled screw, COP 3.0 133 kW 253 A 316 A

Cables: ampacity is only the first gate

A cable must pass three checks: continuous ampacity, voltage drop and short-circuit thermal withstand. Most installations check only the first.

For copper XLPE cable in air at 30 °C, reference ampacities are roughly 115 A for 25 mm², 140 A for 35 mm², 175 A for 50 mm², 215 A for 70 mm², 255 A for 95 mm², 295 A for 120 mm², 335 A for 150 mm², 385 A for 185 mm² and 450 A for 240 mm². These are three-core values. In a multi-layer tray, apply a 0.8–0.9 correction; in buried ducts, use soil thermal resistance. Leave 15–20% margin in normal selection.

Voltage drop is the check most often skipped and most often responsible for problems. ΔU% = √3 × I × L × (R cosφ + X sinφ) ÷ U × 100%, with R and X in Ω/km and L in km. For 95 mm² copper, R is about 0.193 Ω/km and X about 0.075 Ω/km. For a 400 kW machine at 152 A over 150 m: ΔU = 1.732 × 152 × 0.15 × (0.193 × 0.85 + 0.075 × 0.53) = 8.1 V, or 2.1% of 380 V, acceptable. At 400 m, the drop rises to 5.5%, above the 5% limit; either increase the cross-section or move the mechanical room closer.

Unit current 95 mm² allowed length 150 mm² allowed length 240 mm² allowed length
100 A 539 m 743 m 1,057 m
152 A 355 m 489 m 695 m
250 A 216 m 297 m 423 m
340 A 159 m 219 m 311 m

The table shows that for high-current machines the cable size is often set by voltage drop, not ampacity. A 340 A machine is adequately rated at 95 mm², but beyond 159 m it needs 150 or 240 mm².

The third gate is short-circuit thermal withstand: S ≥ I × √t ÷ K, with K about 143 for copper XLPE. This is normally checked by the designer; installation teams often omit it, but a mechanical room close to the transformer can have a high fault current, and an undersized conductor becomes a safety issue rather than a nuisance.

Starting methods: four options and their boundaries

A chiller’s starting current is typically four to seven times running current. Direct-on-line starting is therefore limited to small machines. The main options are direct-on-line, star-delta, soft starter, variable-frequency drive and autotransformer.

Method Starting current multiple Starting torque Typical power Cost index
Direct-on-line 6–7 100% Below 15 kW 1.0
Star-delta 2–2.5 33% Below 75 kW 1.2
Soft starter 2.5–3.5, adjustable Adjustable 30–400 kW 1.5
Variable-frequency drive 1.0–1.2 Adjustable Any 3.0–4.0
Autotransformer 3–4 40–64% Below 100 kW 1.8

Star-delta has only one-third starting torque. A chiller compressor is a heavy start; if it can unload, star-delta may work, but if there is no unloading mechanism or the system pressures are not equalized, it may fail to start. This is especially relevant to screw machines, where the slide valve must be in the unloaded position; if it is not, starting torque approaches full load.

A soft starter is adjustable: current can be set from about 2.5 times running, ramp time from 10 to 30 s, and soft stop is available. But it remains in circuit after starting and has about 1% continuous loss; it is also sensitive to harmonics, so add a filter where other variable-speed equipment is present. A variable-frequency drive gives near-rated starting current and part-load speed control, at three to four times the cost plus harmonic mitigation. The criterion is annual running hours: above 2,500 hours with a varying load justifies a drive; continuous full load does not.

Transformer capacity is another criterion. A direct-on-line motor should not exceed 20–30% of transformer capacity, otherwise the bus voltage drop at start exceeds 10% and affects other equipment. A 400 kVA transformer should not direct-start a motor above 100 kW; beyond that, use a reduced-current method.

Eight protections and interlocks

Overload protection uses a thermal relay or motor protection device with a delayed trip. Phase failure and phase sequence protection should trip immediately; a scroll compressor must not run in reverse. Undervoltage and overvoltage protection should trip with a delay, and should be separate from overload where accuracy matters. Refrigerant loss protection uses high and low pressure switches. Flow protection uses a flow switch. Frost protection uses the outlet water temperature sensor. Compressor over-temperature protection uses the discharge temperature sensor. Emergency stop must be outside the mechanical room door.

The most common wiring error is a flow switch connected only to an alarm lamp, not to the compressor enable circuit. The lamp lights when flow fails, but the compressor keeps running and the evaporator freezes. At acceptance, stop the pump and confirm that the compressor stops within 30 seconds. The second common error is an emergency stop inside the mechanical room only. The code requires one at the door, reachable as the door opens; in an emergency, the person is often outside.

Six wiring errors to check at acceptance

First, control cable in the same trunking as power cable. Inverter output conductors induce noise into sensor cables, and the temperature reading jumps. Use shielded twisted pair, keep 300 mm separation from power cables, and cross at right angles where they must cross.

Second, shielding grounded at both ends. The shield should be grounded at one end, usually the panel end. Both ends create a circulating current and introduce more noise.

Third, soft starter too far from the motor. Beyond 50 m, voltage drop and harmonic effects increase, and the starter cannot accurately sense the motor. Keep the starter near the machine and use a standard cable for the long incoming run.

Fourth, grounding and neutral mixed. The enclosure must connect to PE, not N. In a TN-C system, separate PE and N at the service entrance after the equipotential bond, and never recombine them downstream.

Fifth, several machines on one breaker. It saves a breaker but any fault stops the whole group and no machine can be isolated for maintenance. Each machine needs its own circuit and breaker.

Sixth, cable lugs without heat-shrink. A large cable lug that is crimped but not sleeved will develop green corrosion in a damp mechanical room, and contact resistance rises over two or three years. The fault is invisible at acceptance and appears later as overheating.

Panel layout and environment

Keep at least 1.5 m in front of the panel for door operation, 0.8 m behind for maintenance, and 0.5 m clear above for cable trays. The enclosure should be at least IP30 indoors, not IP20. Keep it at least 1 m from water pipes and fit a drip shield if a pipe runs above. The room temperature should stay below 40 °C; every 10 K above that roughly halves electronic component life. Mechanical ventilation or air conditioning is part of the electrical design, not an optional finish.

Common questions

How do I estimate chiller current?

Multiply compressor input power by 1.9 to get amperes, then add pump and fan current. A 400 kW water-cooled machine is about 152 A compressor plus 38 A auxiliaries, 190 A total. An air-cooled machine of the same capacity should be estimated at roughly twice the water-cooled current.

Is cable ampacity enough?

No. Check voltage drop to 5%. For high-current machines, the cross-section is often set by voltage drop: a 340 A machine on 95 mm² can only run about 159 m before needing a larger cable.

Star-delta or soft starter?

Star-delta is cheaper but has one-third starting torque and needs an unloaded compressor. A screw machine with the slide valve not fully unloaded can fail to start. A soft starter is the safer default for commercial chillers.

Is a variable-frequency drive worth it?

Above 2,500 annual hours with a varying load, yes; the premium can pay back in three to five years. For continuous full-load operation, the saving is limited and a soft starter is more economic.

Why does the upstream breaker trip at start?

Either the instantaneous setting is below the starting current, or the transformer is too small and the bus voltage collapses. Adjust the breaker setting to ride through the start, or change to a reduced-current starter or increase supply capacity.

What grounding checks are needed?

Connect the enclosure to PE, never to N; earth resistance no more than 4 Ω. In a TN-C system, separate PE and N at the service entrance and do not recombine. Bond each machine and maintain equipotential bonding across the mechanical room.

What does the starter do?

It limits inrush current and protects the motor. A soft starter ramps the voltage; a star-delta steps it. The choice depends on the compressor and the supply.

What cable size?

Size by current, voltage drop and routing. A cable that is too small overheats and trips. Check the terminal size and the lugs as well.

Related reading

Related reading

Chiller PLC integration · Chiller plant sensors · Chiller acceptance