A chiller retrofit is usually sold as a machine change: remove the old compressor, install a new high-efficiency unit, keep the pipes and the tower. The machine may be the smallest part of the risk. The existing cooling tower, condenser-water pump and header were sized for the old chiller, and a new machine with a different condenser pressure drop can leave the tower unable to deliver its design approach.
This article sets out the four checks before a tower is reused: heat rejection, water flow, head and condition. The example is an 800 kW water-cooled screw chiller in an office building.
Start with heat rejection
An 800 kW chiller at a COP of 4.6 rejects about 974 kW at the condenser: 800 kW of cooling plus 174 kW of compressor power. At a 5 K condenser-water rise, the design flow is 974 ÷ (1.163 × 5) = 167.5 m³/h. The old tower may be rated at 200 m³/h at 35/30 °C with a 4 K approach to a 26 °C wet-bulb.
A new chiller at a COP of 5.5 rejects about 945 kW, so the flow is 162.5 m³/h. The heat rejection is slightly lower, which looks like good news. But the new machine may have a different condenser pressure drop and a lower minimum flow. The tower’s nominal flow is not the same as the flow the new machine needs.
| Check | Old design | New requirement | Pass condition |
|---|---|---|---|
| Heat rejection | 974 kW | 945 kW | New duty is not above the tower rating |
| Condenser flow | 167.5 m³/h | 162.5 m³/h | Within 80–110% of tower design |
| Approach | 4 K | 4 K or better | Verified at design wet-bulb |
| Fan and fill | Original | Same or lower load | No fouling, no broken fill |
| Basin and screen | Original | Clean, no bypass | No sludge, no air entrainment |
Flow is not the only number
The new chiller may need a higher condenser flow at part load to keep the pressure difference stable, or a lower flow to reduce pump energy. A fixed-speed pump sized for the old machine can over-supply the new one, raising the condenser pressure and wasting pump power. A variable-speed pump with a differential-pressure set point at the most unfavorable branch is a better match.
Check the minimum condenser flow. Below the manufacturer’s minimum, the pressure difference across the compressor falls, lubrication becomes uncertain and the machine may surge. A flow switch is not a substitute for a proper minimum-flow calculation.
Head is where retrofits fail
The old pump was selected for the old condenser, the old tower elevation and the old pipe. A new condenser with a lower pressure drop can reduce the pump head, but a new tower nozzle or a higher spray height can add it back. Measure the existing pump head and flow before removal; do not rely on the nameplate.
If the tower is on the roof and the mechanical room is below, the static height is fixed. The friction loss depends on flow and pipe condition. A new chiller with a lower condenser pressure drop may allow the pump to run at a lower speed, but the tower’s minimum spray pressure may set the floor. Check both ends before promising a pump saving.
Condition of the tower
A tower that has run for fifteen years may look serviceable and still be a liability. Look at the fill: scale, biofilm and collapsed sections reduce the approach. Look at the basin: sludge, corrosion and a damaged screen can pass debris into the condenser. Look at the fan: a cracked blade or a worn gearbox will fail after the chiller upgrade, and the new machine will be blamed.
If the approach has drifted from 4 K to 6 K, the chiller’s condensing temperature rises by 2 K. At 2–3% efficiency per K, that is 4–6% of chiller power, enough to erase part of the new machine’s advantage. Clean or replace the fill before comparing the retrofit options.
The 800 kW example
At 65% average load for 4,000 hours, the old chiller draws 800 × 0.65 ÷ 4.6 = 113 kW. The new machine at a COP of 5.5 draws 94.5 kW. The saving is 18.5 kW, or 74 MWh a year. At CNY 0.70/kWh, that is CNY 52,000. The tower fan may add 30 kW at full speed; if the new machine runs at a lower condenser load, the fan saving can be 10–20% of that, or 3–6 kW.
A chiller replacement at CNY 1.2 million with a CNY 52,000 electricity saving has a simple payback of 23 years on energy alone. The case cannot be justified by kWh alone; it needs a capacity increase, a reliability benefit, a tariff change or a grant. Keeping the tower reduces the capital cost, but it does not create a payback where the hours and load are too low.
When to keep the tower
Keep it when the tower has spare approach, the basin and fill are sound, the fan and gearbox have life left, and the new chiller’s condenser flow and pressure drop fit. Replace it when the approach is more than 2 K worse than design, the fill is collapsing, or the tower cannot deliver the minimum flow without bypass.
The decision should be made on measured data: tower flow, entering and leaving water temperature, wet-bulb, fan power and basin condition. A visual inspection is not enough. A one-day performance test is cheaper than discovering the problem after the chiller is running.
Common questions
Can I keep the old cooling tower when replacing a chiller?
Often yes, if the tower’s heat rejection, flow, approach and condition meet the new machine. The new chiller may have a different condenser pressure drop and minimum flow, so the tower and pump must be checked together.
Does a higher-efficiency chiller always reduce tower load?
Yes, the condenser heat rejection falls because compressor power falls. But the tower still has to deliver the design approach at the design wet-bulb. A fouled tower can erase the chiller saving.
Why does condenser flow matter?
Too much flow raises pump energy and can over-pressure the condenser; too little flow reduces heat transfer and may trip the minimum-flow protection. The new chiller’s range may differ from the old one.
How do I know if the tower approach has degraded?
Measure the cooling-tower leaving water temperature and the ambient wet-bulb at the same time. Compare with the design approach. A drift of 2 K or more is a warning.
Can a new chiller use the old fixed-speed pump?
It can, but the pump may be oversized or the head may not match. Measure the existing flow and head, then compare with the new condenser curve. A variable-speed pump is often the better retrofit.
Is a chiller retrofit with tower reuse worth it?
Only with enough hours and a real baseline. At 4,000 hours and 65% load, an 800 kW machine may save 74 MWh a year; that is modest against a CNY 1.2 million chiller. Add capacity, reliability or grant value before approving.
When can I keep the tower?
When its approach and fan power still meet the design. A tower that is oversized for the new load is an asset; a fouled one is a liability.
What head check?
Check the static head and the piping pressure drop. A new chiller with a different flow may overload the tower or the pump.
Further technical reading
For the retrofit payback method, see Chiller Retrofit Payback: Baseline and Sensitivity. For tower selection, see Cooling Tower Selection for Water-Cooled Chillers. For tower installation, see Cooling Tower Installation and Piping. For retrofit evidence, see Chiller Retrofit for Green Factory Evidence.
Related reading
Chiller Retrofit Payback · Chiller Part Load Selection · Chiller Acceptance Standards