Frequently asked questions: selection, installation and delivery

Frequently asked questions by product line, based on LONGCOM technical articles and project practice. For a project-specific answer, send the duty conditions directly.

Heat pump · Hot water · Heating · Cooling

Air-source heat pump series

Explore the series →
Does a COP of 4 mean four units of heat per unit of electricity?

It means four units of useful heat at the condenser for one unit of electrical input, but three of those units are moved from the air. The nominal COP is a test-point value, not a year-round average.

Read the full technical article →
Can a heat pump work at -15 °C?

A standard scroll unit loses much of its output; an EVI unit can hold heating at -15 °C. Size on the coldest month and include defrost losses, not on the annual average.

Read the full technical article →
How big should the cylinder be?

About 0.8–1.0 times the daily demand. Take the upper end for concentrated showers and the lower end for distributed washbasins; check the peak hour, not only the daily total.

Read the full technical article →
How far can the hot-water line run without a return loop?

Beyond 15–20 m to the farthest outlet, fit a return loop. Control the pump on temperature; a 24-hour loop wastes heat and pump energy.

Read the full technical article →
What is the first sign that the heat exchanger needs cleaning?

The water-side temperature difference rises by 2 K above the commissioning value at the same flow. Clean and check the water treatment before the COP falls further.

Read the full technical article →
How long does a heat-pump water heater last?

The unit is typically designed for 10–15 years and the cylinder for 8–12. Hard water, long running hours and skipped coil cleaning move the life toward the lower end.

Read the full technical article →
Industrial cooling · Process

Industrial cooling series

Explore the series →
Why do cooling-load estimates differ so much?

Area index, diversity and fresh-air load are the usual causes. Corridors and mechanical rooms alone can change the total by 15%. Use an hourly calculation by orientation and floor.

Read the full technical article →
How many chillers should a plant have?

Two is the common start, so one can hold 60–70% of the load. Hospitals and data centers need N+1. Three or more suit a wide load swing.

Read the full technical article →
Is a magnetic-bearing chiller worth the premium?

Only where annual hours are long and the load swings widely. It can improve part-load IPLV by 20–30%, but costs over 50% more; short-hour projects rarely recover it.

Read the full technical article →
Air-cooled or water-cooled?

Above 3,000 hours with a tower and water, water-cooled usually wins on life-cycle cost. Below 1,500 hours, air-cooled avoids the tower and water treatment. Between, calculate 20 years.

Read the full technical article →
Why does a chiller trip the upstream breaker at start?

Two checks explain most start-up trips: the breaker instantaneous setting may sit below the inrush, or the supply transformer may be too small, so the bus voltage sags. Check the setting first, then the supply capacity.

Read the full technical article →
What maintenance is essential?

Log the operating data weekly, clean filters monthly, clean the condenser by differential, test the water quarterly and check insulation annually. These five catch most faults early.

Read the full technical article →
Drying · Reduction · Integrated

Sludge drying series

Explore the series →
What should I bring to a dryer site visit?

Three months of feed records, water analysis, disposal contract, site plan, power capacity and the existing dryer log. The log is the best benchmark.

Read the full technical article →
What moisture basis should the quote use?

Wet basis, with the method. A wet-basis 30% is about 43% on a dry basis; mixing the two is a common dispute.

Read the full technical article →
Why is kWh/kg water better than kWh/t product?

The water number is independent of the feed and product moisture, so it can be compared across sites. The product number hides the effect of the target moisture.

Read the full technical article →
What acceptance tolerance is normal?

About ±5% on capacity and ±10% on specific energy, with a correction for feed moisture. Put it in the contract before the test.

Read the full technical article →
Should the performance test use my sludge?

Yes. A test on the supplier's reference sludge does not prove the machine will meet the guarantee on your feed.

Read the full technical article →
What is the biggest hidden cost?

Odor and condensate treatment, plus the spare parts and downtime. A dryer price that excludes these is not the installed cost.

Read the full technical article →

Twenty questions that cover a pool heat pump project end to end, grouped the way a project actually moves: capacity first, then installation, then the paperwork a tender demands, then the faults that come back in service.

Group Core question Short answer
Selection How big Holding load or first heat-up, whichever is larger
Installation What must be right Air clearance, flow, bypass, bonding
Tender What to demand Derating curve, material spec, commissioning record
Service What fails Flow faults, fouled coils, scaled exchangers

1. Selection

Q1. How is capacity decided?

Two calculations run in parallel. The holding load replaces what the pool loses through evaporation, convection, radiation, shell conduction, make-up water and pipework. The first heat-up load raises the whole volume by the required temperature within the stated hours. The larger result sets the machine, and the unit count follows redundancy and part-load needs.

Q2. What does the derating curve tell me that a nominal rating does not?

It states capacity and COP at each ambient and water temperature. A unit rated 60 kW at 7 °C air may deliver 42 kW at −5 °C; without the curve the winter shortfall is invisible until the pool cannot hold temperature.

Q3. Should I choose inverter or fixed speed?

Inverter where the holding load is a small share of nominal capacity, where noise matters at night, or where the pool runs all year. Fixed speed is defensible when the holding load is close to rated capacity and the budget is tight.

Q4. How many units should a commercial pool have?

Usually two to four in parallel. Two gives redundancy and a usable part-load step; more modules give finer staging. A single large unit is cheaper to buy and more expensive to lose.

Q5. Is a bigger unit safer?

No. Oversizing causes short cycling at part load, temperature swings, contactor wear and higher average consumption. Sizing is a range, not a maximum.

Q6. Does pool volume alone predict the load?

No. A deep small-surface pool and a shallow large-surface pool of the same volume lose heat very differently, because evaporation scales with surface area, water temperature and air movement, not with depth.

2. Installation

Q7. How much clearance does the unit need?

Whatever the manufacturer states for intake and discharge, treated as a minimum for rated capacity rather than a target. Walls closer than that clearance raise entering air temperature and cut output before any alarm appears.

Q8. Is a bypass really necessary?

Yes. It lets the exchanger be isolated for cleaning or repair without stopping pool circulation, and it allows flow to be trimmed when the pump is oversized.

Q9. Where does the strainer go?

Upstream of the heat pump exchanger, after the pump and before the unit. Without it, debris blocks tubes and the first cleaning becomes a dismantling job.

Q10. What electrical work is essential?

Correct grounding and equipotential bonding of unit, pump, pipework and pool structure, residual current protection of the right type, sealed glands, and an isolator reachable without walking through a wet hall.

Q11. Where does defrost water go?

To a drained, sloped route that does not discharge onto a walkway or back into the pool. An undrained base becomes an ice block in winter and damages the frame and coil.

Q12. What must commissioning record?

Entering and leaving water temperature, measured flow, pressure drop across the exchanger, ambient temperature, suction and discharge pressure, superheat and running current — compared against the selection sheet, not just noted.

3. Tendering and documents

Q13. What should a tender response include beyond a price?

A selection sheet with conditions, the derating curve at the project’s design ambient, exchanger material and wall thickness, flow limits and pressure drop, protection functions and the commissioning procedure.

Q14. How do I compare two units with the same nominal capacity?

Compare at the same four conditions — air dry-bulb, water in and out, flow — and compare the seasonal figure rather than the single-point COP. Different test conditions make headline numbers meaningless.

Q15. Is an energy label the same as a test report?

No. The label is a declared class under a scheme; the report is the measured data behind it, with conditions. Ask for the report and check which standard it follows.

Q16. What acceptance tests actually prove capacity?

Measured flow, measured water temperature rise, and the resulting heat output compared with the selection sheet at the prevailing ambient. If ambient is far from design, the derating curve converts the expectation.

Q17. What belongs in the warranty terms?

The scope (compressor, exchanger, boards, labor), the exclusions (water chemistry, freezing, incorrect installation), the response time, and whether spare parts remain available for the stated life.

Q18. Why does the contract need a documentation clause?

Because the operating cost is decided by commissioning data and water chemistry, not by the unit alone. A handover pack with measured numbers and a maintenance schedule is what makes the warranty usable.

4. Service and faults

Q19. High-pressure alarm: where do I look first?

Water side before refrigerant: blocked strainer, low flow, scaled exchanger, then air-side fouling and recirculation. Only after those are cleared does the refrigerant charge become a suspect.

Q20. Low-pressure alarm in winter: is it a leak?

Not necessarily. Low ambient, a heavily frosted coil and reduced airflow all lower suction pressure. Check the air side and defrost behavior before searching for a leak.

Q21. Why does the flow switch trip while the pump runs?

Usually a paddle too short for the pipe size, a fouled or stuck paddle, air pockets at the high point, or a setpoint left at the factory value. Verify flow by measurement, not by the switch alone.

Q22. Water temperature swings a few degrees: what causes it?

Oversizing, a probe in a dead leg or near the return, or a control loop tuned for a different load. Fix the sensing point and the staging logic before touching the setpoint.

Q23. How often should the coil be cleaned?

By inspection, not by calendar: quarterly in a coastal or heavily chlorinated plant room, twice a year inland. Rising discharge pressure and a shrinking air temperature drop are the signals.

Q24. Can efficiency be recovered on an old unit?

Usually yes, to a point: clean the coil and exchanger, restore airflow, correct the charge and superheat, verify flow. What cannot be recovered is a coil whose fins have corroded at the tube joint.

Sizing FAQ · Installation FAQ · Maintenance FAQ · Sizing