1. Sizing is not volume times a coefficient
The most common method on site is to take the pool volume, multiply by a kilowatt-per-cubic-meter coefficient and call the result the unit capacity. It produces a number, but rarely a correct one: it flattens water surface, local climate, indoor or outdoor, cover or no cover, make-up method and operating hours into a single volume.
Take two 500 m³ pools. One is indoors in a cold-climate city, covered at night, with little make-up water. The other is outdoors in a tropical resort, uncovered, with heavy daily make-up and steady wind. The first may need a third of the holding load of the second. One coefficient will oversize one and undersize the other, and neither owner will be told which.
2. Nine inputs; miss one and the result is void
Before any arithmetic, collect: pool volume (m³) and water surface (m², true projected area for free-form pools); indoor or outdoor; water setpoint and make-up water temperature; local winter design dry-bulb and wet-bulb (or summer design conditions, if the unit also cools); whether a cover is used and for how long; make-up volume per day and how it is introduced; required first heat-up time; operating hours and circulation periods; and the existing pump curve on retrofit work. Add the water treatment method if it is a salt-chlorinator pool, because it changes the exchanger and materials specification.
These inputs are not paperwork. Each one moves the answer: surface area drives evaporation and radiation, climate drives the winter capacity check, cover drives the largest single loss item, and first heat-up time drives the unit count more than the holding load does.
3. The holding load: five losses, item by item
The holding load is the heat needed to keep the water at temperature. Estimate each item and add them; never substitute a single watts-per-square-meter figure across a whole project.
| Loss item | Estimation method | Order of magnitude | Drivers |
|---|---|---|---|
| Surface evaporation | Heat loss per unit water surface | Indoor 100–200 W/m²; outdoor 200–350 W/m² | Water temperature, humidity, wind, cover |
| Convection and radiation | Per-unit-area estimate or as a fraction of evaporation | Same order as evaporation | Wind speed, temperature difference |
| Shell conduction | From insulation detail and temperature difference | Varies widely with construction | Insulation, ground temperature |
| Make-up water heating | Calculated from volume and ΔT | Depends on make-up share | Make-up ratio, make-up temperature |
| Pipework losses | From run length and insulation | Usually small | Insulation quality, plant-room temperature |
Evaporation dominates, typically more than half the total, and it is the item a cover attacks most directly: a night cover cuts evaporative and convective loss by 50–70%.
4. First heat-up: volume, ΔT and time traded against capacity
The formula is the basic calorimetric one, with time in the denominator:
Qfirst (kW) = V × ρ × c × ΔT / (3600 × t)
For a 500 m³ pool with 15 °C make-up and a 27 °C setpoint, ΔT = 12 K and the heat required is about 6 977 kWh. At 48 hours that is roughly 145 kW of net capacity; at 72 hours, about 97 kW. Add losses and efficiency margins and the installed capacity rises by 10–20%.
| Pool volume | ΔT | Time | Net heat | Suggested capacity (with margin) |
|---|---|---|---|---|
| 200 m³ | 12 K | 48 h | 58 kW | ≈ 70 kW |
| 500 m³ | 12 K | 48 h | 145 kW | ≈ 170 kW |
| 500 m³ | 12 K | 72 h | 97 kW | ≈ 115 kW |
| 1 000 m³ | 12 K | 72 h | 194 kW | ≈ 230 kW |
| 1 000 m³ | 15 K | 48 h | 364 kW | ≈ 430 kW |
5. Make-up water: the load most often forgotten
Make-up heating uses the same formula with a different volume and period: Qmake-up (kW) = Vmake-up × ρ × c × ΔT / (3600 × tmake-up). A pool losing 3% of its volume per day at 500 m³ is 15 m³ of make-up at 15 °C, which is a continuous load of roughly 8 kW — modest on its own, but it never stops, and it is the item that keeps a “correctly sized” unit at full output all summer.
6. Unit count and capacity split
Total load Qtotal = holding load + make-up load (where the heat pump carries make-up). Add margin and winter verification to get the design load Qdesign. Then N = Qdesign / qunit, rounded up. Critical pools — competition pools, hotel main pools — should carry N+1 redundancy. Beyond three or four units, modular master control is the practical way to stage and rotate them.
| Total load | Unit count | Example split | Typical duty |
|---|---|---|---|
| ≤ 30 kW | 1 | 30 kW | Small pool, villa |
| 30–80 kW | 2 | 40 + 40 or 50 + 30 | Medium pool |
| 80–160 kW | 2–3 | 60 + 60 + 40 | Commercial pool, hotel |
| 160–300 kW | 3–4 | Modular | Large pool, sports venue |
| > 300 kW | Modular master | Multiple modules | Water park, zoned plant |
7. Flow and pump: the transport system for the capacity you bought
The heat pump can only deliver what the water can carry. Too little flow and the exchanger sees a large temperature difference and trips on high pressure; too much flow and pressure drop, pump energy and erosion risk all rise.
Flow follows the heat balance: m = Q / (c × ΔT). In practical units, cubic meters per hour per kilowatt is about 0.86 / ΔT. A 40 kW unit at a 4 K design difference needs roughly 40 × 0.86 / 4 ≈ 8.6 m³/h. Select against the manufacturer’s rated flow and pressure-drop curve, and respect the minimum flow.
| Item | Source or calculation | Caution |
|---|---|---|
| Rated unit flow | Manufacturer data | Never below minimum flow |
| Design ΔT | 4–5 K typical | Large ΔT invites high-pressure trips |
| Circulation flow | From turnover period | Must be matched to unit flow |
| Exchanger pressure drop | Manufacturer curve | Include in pump head |
| Filter pressure drop | Dirty-condition value | Allow for backwash differential |
| Pump head | Sum of resistances × margin | Measure on retrofit work |
8. Winter check: convert nameplate capacity into local capacity
Everything above sizes the load. This step checks what the unit can actually deliver in the project’s winter. Take the local winter design outdoor temperature, read the unit’s capacity at that temperature — not the nominal figure — deduct defrost loss, and compare the result with the winter holding load.
If the available capacity falls short there are three levers, and they combine: add units, specify a cold-climate model, or add a supplementary heat source. What must not happen is specifying against the nominal capacity and “dealing with it in winter”, because by then every fix costs more.
9. A calculation sheet you can reuse
| Item | Symbol or formula | Unit | Project value |
|---|---|---|---|
| Pool volume | V | m³ | |
| Water surface | A | m² | |
| Design water temperature | Tset | °C | |
| Make-up temperature | Tmake-up | °C | |
| Holding load | Qhold = sum of five losses | kW | |
| First heat-up, net | Qfirst = VρcΔT/(3600t) | kW | |
| Make-up load | Qmake-up = VmuρcΔT/(3600tmu) | kW | |
| Design load | Qdesign = (Qhold + Qmake-up) × 1.1–1.2 | kW | |
| Winter available capacity | From the low-temperature curve, defrost deducted | kW | |
| Unit count | N = Qdesign / qunit, rounded up | — | |
| Circulation flow | Q/(cΔT) or manufacturer rating | m³/h | |
| Pump head | Sum of resistances × 1.1 | kPa or m |
10. Four calculation errors that show up after handover
- Volume counted, surface forgotten. Evaporation and radiation scale with water surface. Free-form and wave pools have far more surface than a “matching” rectangular pool, so the estimate comes out low.
- Holding load and first heat-up mixed. Size on first heat-up and the plant runs part-loaded all year; size on holding and every refill takes days. Both numbers belong in the proposal, labelled.
- Make-up load omitted. A continuous 8 kW is enough to keep a unit at full output in summer and to explain why the pool never quite reaches setpoint.
- Nominal capacity used for winter. The design load must be compared with capacity at the local winter temperature, defrost included.
11. What a pool heating package actually contains
A package is not one heat pump plus one pump. A deliverable system normally includes the heat pump or parallel units, circulation pump and filters, disinfection (salt chlorinator, dosing pump, UV or ozone as the project requires), a plate exchanger or supplementary heater, expansion vessel and make-up set, valves and bypass, control panel and sensors, and a plant-room base with vibration isolation.
The value of buying it as a package is a clear interface: who supplies the unit, who supplies the valves, who owns the interlock logic and who commissions it, all on one sheet. On commercial pools the units are usually modular and staged against the holding load with redundancy; pumps follow flow and head; filters follow turnover and volume; and the control sequence ties unit start-stop, pump interlock, setpoint and alarms together.
Related reading
Air-source heat pump sizing · Hot-water demand calculation · Energy per tonne of hot water · Buffer tank sizing · Pool heat pumps: working principle
Related pages in this series
Water temperature · Technical data · Efficiency and COP · Sizing FAQ