A school dormitory is not a hotel with fewer guests. The draw is compressed into two short windows, the site empties for the holidays, and the building may be unheated for weeks. A system designed for the average day will run out of hot water at 07:00 and freeze in January.
This article designs for the school calendar: term-time peaks, holiday setback, Legionella and frost protection. The example is a 400-student boarding school using 20 m³/day at 55 °C.
The daily load
At 50 L per student, 400 students use 20 m³/day. With 15 °C mains and 55 °C supply, the daily heat is 20,000 × 4.18 × 40 ÷ 3,600 = 929 kWh. If the school also has a canteen and a laundry, add those loads separately; do not hide them in a per-student figure.
| Item | Value | Basis |
|---|---|---|
| Students | 400 | Boarding |
| Daily draw | 20 m³ | 50 L/person |
| Daily heat | 929 kWh | 40 K rise |
| Peak share | 60% in 2 h | Morning and evening |
| Peak flow | 6 m³/h | 12 m³ in 2 h |
| Peak heating | 279 kW | 6 × 1.163 × 40 |
The peak is the design point
If 60% of the daily draw occurs between 06:00 and 08:00, the peak is 12 m³ in two hours, or 6 m³/h. Heating 6 m³/h through 40 K needs 279 kW. A 39 kW unit cannot meet that; even seven units at 39 kW would be at full load.
The practical answer is a tank. A 14 m³ tank at 55 °C stores about 14 × 1.163 × 40 = 651 kWh above the mains. That covers most of the morning peak, and the heat pumps recharge the tank during the day and at night. The tank should be 50–70% of the daily draw for a school, not 30%.
Do not size the heat pumps for the instantaneous peak unless the school has no space for a tank. A tank plus a smaller plant is usually cheaper than a plant that runs at 10% load for 20 hours to be ready for a two-hour peak.
Two peaks, not one
Boarding schools often have a morning peak and an evening peak. The morning peak is the larger one; the evening peak follows sports and dinner. The tank must recover between the peaks. If the evening draw is 40% of the daily total and the morning is 60%, the plant has 10–12 hours to recharge. Check the recovery time, not just the tank volume.
A 4-unit plant of 39 kW each gives 156 kW. To replace 651 kWh after the morning peak takes 4.2 hours at full load, or longer with winter derating. If the evening peak starts at 18:00, there is enough time. If the school also draws hot water for cleaning at midday, the recovery window shrinks.
Holiday setback and Legionella
During holidays, the draw falls to cleaning and staff use. Do not keep the tank at 55 °C for an empty building; that wastes standing loss and scales the coils. A setback to 40 °C is reasonable, but it creates a Legionella risk if the system is not flushed and pasteurized before the students return.
Before the term starts, raise the tank to 60 °C and hold it for at least 30 minutes, then flush every outlet and dead leg. A weekly 60 °C cycle during term is also common for a large domestic hot water system. The exact regime should follow the local health guidance; the important point is that a setback is not a substitute for a pasteurization cycle.
| Period | Set point | Action |
|---|---|---|
| Term | 55–60 °C | Weekly 60 °C cycle; flush dead legs |
| Short break | 45 °C | Daily circulation; flush outlets |
| Long holiday | 40 °C or off | Drain or frost protection; pasteurize before return |
| Return | 60 °C | 30 min hold, flush all outlets |
Dead legs are the hidden risk. A shower block with a 15 m branch holds several liters at 40 °C, which is the worst temperature for Legionella. Keep branches short, insulate them and flush them weekly.
Frost protection
A school in a cold climate may be unheated for weeks. The heat pump has a freeze stat, but the water pipe and the tank coil do not. Drain the domestic water if the building is unheated, or keep a small circulation and a trace heater on the exposed pipe. Do not rely on the heat pump’s “holiday mode” to protect a building that has no power.
If the mechanical room is heated, keep the room above 5 °C and the tank above 5 °C. A tank at 40 °C in a 5 °C room loses less than a tank at 60 °C, but it still needs insulation. Check the tank insulation and the pipe insulation before the first winter.
Controls and metering
Use a timed recovery: start the heat pumps at 22:00, not 06:00. A school with a time-of-use tariff can shift most of the heating to the cheap night period. The tank carries the morning peak; the plant recovers during the day.
Meter the hot-water flow and the heat-pump electricity separately. A school that cannot separate the canteen, the laundry and the dormitory cannot find the load that is running out of hot water. A simple sub-meter is cheaper than a larger plant.
Boundary
This design is for a boarding school with a central plant and a tank. A day school with no evening draw needs a smaller tank. A school with a swimming pool or a large laundry needs a separate load calculation; the pool and the laundry should not be hidden in the per-student figure.
Common questions
How much hot water does a school need?
About 50 L per boarding student at 55 °C, plus canteen and laundry loads. A 400-student school uses about 20 m³/day and 929 kWh/day at a 40 K rise.
How big should the tank be?
50–70% of the daily draw for a school with a sharp peak. A 20 m³/day school may need 12–14 m³, larger than a hotel of the same daily volume.
Can the heat pumps cover the morning peak?
Usually not. A 6 m³/h peak needs 279 kW, which is seven 39 kW units at full load. A tank plus a smaller plant is cheaper and more stable.
What should we do during holidays?
Set back to 40 °C or drain, depending on frost risk. Before term, raise to 60 °C for 30 minutes and flush every outlet and dead leg.
Is a weekly 60 °C cycle enough?
It is a common practice for large domestic hot water systems, but local health guidance governs. The cycle must include the tank and the outlets, not just the tank.
Why do the showers run out at 07:00?
The tank is too small for the peak, the recovery starts too late or the plant is derated by winter ambient. Check the tank, the recovery start time and the winter capacity.
How do I handle holiday Legionella?
Before the term starts, raise the tank above 60 °C and run all outlets. During holidays, either keep the tank hot or drain and disinfect. A cold empty building is a stagnation risk, not a saving.
What tank size for a morning rush?
Calculate the draw in the first 30–60 minutes and subtract the heat-pump output. The tank covers the gap. Add a mixing valve and a recirculation return so the first shower is not cold.
Further technical reading
For the general design, see School Dormitory Hot Water: Air-Source Heat Pump System Design. For tank matching, see Buffer Tank and Pump Matching. For service, see Air-Source Heat Pump Maintenance. For defrost, see Heat-Pump Defrost Logic.
Related reading
Heat pump and tank matching · Heat-pump commissioning · Heat-pump maintenance