Mall Chiller Plant: Load and Staging

Two numbers set the tone for a shopping-mall chiller plant. Fresh air accounts for 30–40% of total cooling load, and the load outside trading hours falls to about 15% of the daytime peak. The first decides chiller capacity; the second decides the number of machines and the staging strategy. Many schemes fail at exactly these two points: fresh air is estimated from floor area rather than occupancy, and the number of machines is calculated by dividing total load by unit capacity, leaving one machine to short-cycle at 20% load at night.

The sequence below follows the actual operation of a mall: break down the load, size the plant and flows for an 80,000 m² example, then address large temperature difference, zoning, staging, cooling towers and free cooling. The final section defines the plant efficiency ratio so that acceptance is measurable.

Fresh air and people come first

For a mall, occupancy is taken as 0.25–0.4 person/m² in retail areas, 0.5 person/m² in dining and 0.3 person/m² in supermarkets. At 0.25 person/m² over 80,000 m², a weekend peak is about 20,000 people. At 20 m³/h per person, fresh air is 400,000 m³/h. With outdoor air at 35 °C and indoor air at 26 °C, the enthalpy difference is about 20 kJ/kg. The fresh-air load alone is 400,000 × 1.2 ÷ 3,600 × 20 ≈ 2,670 kW.

Adding dining exhaust make-up and humidification brings the fresh-air-related load to about 3,100 kW, or 32% of the 9,600 kW total. A mall with a high dining share can reach 38–40%; a department-store-led mall can fall to about 28%. Fresh air based on occupancy rather than floor area is the largest difference between mall and office load calculations.

People themselves contribute about 1,900 kW. At 96 W total heat per person for 20,000 people, about 70% is sensible and 30% latent. A mall’s overall latent share is lower than a hotel’s, so terminals can be designed mainly for sensible load and the apparatus dew point need not be pushed to 12 °C. Dining areas are different: cooking and dishwashing raise the latent share, so exhaust and make-up humidity control must be considered separately.

Lighting is about 1,150 kW, envelope and solar gain 1,250 kW, equipment and lifts 1,200 kW, infiltration 1,000 kW. Adding fresh air at 3,100 kW and people at 1,900 kW gives 9,600 kW, or 120 W/m². This sits at the lower end of the 100–160 W/m² range common for malls, because the example has a high internal-area ratio and few external windows.

Load component Share Cooling (kW) Basis
Fresh air 32% 3,100 20,000 people × 20 m³/h, 20 kJ/kg enthalpy difference
People 20% 1,900 0.25 person/m², 96 W total heat per person
Lighting 12% 1,150 18 W/m², 80% coincidence
Envelope and solar 13% 1,250 40% glazed curtain wall, shading coefficient 0.35
Equipment and lifts 12.5% 1,200 Escalators, refrigeration, tenant equipment
Infiltration and doors 10.5% 1,000 Entrances and loading area
Total 100% 9,600 120 W/m² gross floor area

From 9,600 kW to the number of running machines

Select four 2,500 kW water-cooled centrifugal chillers, 10,000 kW installed, a margin of 4.2%. The margin is deliberately small: a mall has a flat load curve and a long peak, so extra capacity is rarely used and lowers the part-load ratio.

With a 6/13 °C design and a 7 K difference, chilled-water flow is 9,600 ÷ (1.163 × 7) ≈ 1,179 m³/h. Cooling water at 32/37 °C and COP 5.6 gives condenser heat of 9,600 × (1 + 1 ÷ 5.6) ≈ 11,314 kW and cooling-water flow of 11,314 ÷ (1.163 × 5) ≈ 1,946 m³/h. Provide four chilled-water pumps at 300 m³/h and four cooling-water pumps at 490 m³/h, one per chiller, with one standby position.

Write the load-to-machine table into the control sequence. At 100% load, run four machines at 96% each; at 75%, three at 96%; at 50%, two at 96%; at 40%, two at 77%; at 25%, one at 96%; at 15%, one at 58%. At 40% load, two machines at 1,920 kW each remain in the centrifugal efficient range. Centrifugal chillers can turn down to 10–15% with guide vanes and inverter control, but below 30% surge risk rises and hot-gas bypass is needed. Four equal machines allow one machine at night and the other three off, avoiding the idle loss of a two-machine arrangement.

Four machines rather than three 3,300 kW units also covers maintenance. With one machine out, three 2,500 kW units still provide 7,500 kW, or 78% of daytime load; a three-machine scheme would leave only 6,600 kW and fail the weekend peak. At night, 1,440 kW is 58% of one 2,500 kW unit, closer to its efficient range than 44% of a 3,300 kW unit.

6/13 °C large temperature difference: pump savings and terminal penalty

Going from 5 K to 7 K reduces flow for the same duty to 5/7, or 1,179 m³/h instead of 1,651 m³/h. Pump shaft power varies approximately with flow to the power 2.85 when pipe resistance is included. A flow ratio of 0.714 gives a power ratio of 0.714^2.85 ≈ 0.38, a 62% reduction in pump power.

Pumps account for 18–25% of plant electricity, so a 62% reduction saves 11–15% of plant energy. The chiller pays a price: supply at 6 °C instead of 7 °C lowers evaporating temperature by about 1 K and COP by 2.5–3%. Chillers account for about 70% of plant energy, so this adds 1.8–2.1%. The net saving is 9–13%, which is why large temperature difference works in a mall with long continuous operation.

The terminal pays on the water side of the coil. Flow falls by 29%, tube velocity from 1.8 to 1.3 m/s, water-side coefficient to about 76% of the original, overall coefficient down 8–12%, and coil capacity down 3–6%. Increase coil rows from six to eight, or reduce face velocity from 2.2 to 2.0 m/s, to recover the difference. A retrofit that keeps the original coils will feel short of cooling in the hottest week.

There is also a hidden benefit: smaller flow allows the main pipe to drop one size, from DN600 to DN500, with lower insulation and support cost. Boundary conditions matter. Cinemas and dining rooms with high dehumidification needs benefit from 6 °C supply because the apparatus dew point is lower. Radiant or dry terminals will condense at 6 °C and need mixing to 12–14 °C; that load cannot be put on the large-temperature-difference loop.

Item 7/12 °C, 5 K 6/13 °C, 7 K Change and penalty
Chilled-water flow 1,651 m³/h 1,179 m³/h −28.6%
Chilled-water pump power Base About 38% Flow to power 2.85
Main pipe DN600 DN500 One size smaller
Chiller COP Base −2.5 to −3% Evaporating temperature about 1 K lower
Coil capacity Base −3 to −6% Add rows or reduce face velocity
Plant electricity Base −9 to −13% Pump saving exceeds chiller penalty

Trading hours differ, so the plant must be zoned

A mall does not open as one building. A supermarket may trade 08:00–22:00, retail 10:00–22:00, dining 10:00–21:30, cinema 12:00–24:00 and gym 06:00–23:00. With one loop, any trading tenant requires cooling for the whole building, non-trading terminals keep consuming and the plant cannot drop to one machine.

Divide the water system into four loops: retail, supermarket, dining, and cinema/public areas. Each loop needs its own supply and return mains, isolation valves and cooling meter. The plant starts machines according to the number of loops requesting cooling. At midnight, when only the cinema trades, the load is about 600–800 kW and one 2,500 kW machine runs at 30%.

Zoning also needs time control. Retail pre-cools one hour ahead, dining 1.5 hours ahead to handle kitchen exhaust make-up moisture, and cinema one hour ahead. Pre-cooling load is 1.2–1.4 times steady load, so the plant must start before the return temperature rises, not after.

The cost is extra mains and pumps: three additional headers, valve groups and meters, about 5–8% more capital. But the annual saving in non-trading hours can recover it. An 80,000 m² mall has about 3,500 non-trading hours; at 200 kWh saved per hour, that is about 700,000 kWh per year.

Staging logic matters more than the machines

Do not stage on return temperature alone. Return temperature is affected by both flow and load; in a large-temperature-difference system, a rise from 13 to 14 °C may only mean reduced flow, not increased load. Use two criteria: total cooling and worst-loop differential pressure. Add a machine when cooling exceeds 90% of running capacity for 15 minutes; remove one when it falls below 55% for 20 minutes.

Start the pump before the chiller and stop the chiller before the pump; the reverse sequence trips the flow switch. After a new machine starts, the control system should bring it above 60% load within five minutes, otherwise the new machine may surge at low load while the existing machines overload. This depends on the motorized valve in the main header, whose control quality matters as much as the chiller’s guide vanes.

The saving from staging can be quantified. Four machines at 100% load run at 96% each and are efficient. But at 50% load, if all four run at 50%, a centrifugal chiller’s COP falls by 12–15%. Running two at 96% uses about 12% less chiller electricity for the same cooling. The principle is “load machines before adding another” rather than “share load equally”.

How to define plant efficiency so it cannot be gamed

Write the system coefficient of performance (SCOP) boundary into the contract: plant outlet, with electricity for chillers, chilled-water pumps, cooling-water pumps and cooling towers included; cooling from flow and temperature difference. If the boundary is unclear, the number is meaningless. Including terminal fans lowers the result by 20–30%; counting only chillers raises it by more than 25%.

Item Design Typical measured Source of deviation
Chiller COP at full load 5.8–6.2 5.4–5.9 Cooling water 1–2 K high, fouling
Plant SCOP, annual 5.0–5.5 4.0–4.6 Poor staging, fixed-speed pumps
Chilled-water transport factor 25–35 18–26 High flow, low ΔT, unbalanced valves
Cooling-water transport factor 20–30 15–22 All tower fans on, pumps not interlocked
Cooling-water ΔT 5 K 3.5–4.5 K Excess flow, uneven tower distribution

If measured SCOP is below design, check three things first: chilled-water ΔT reaching 7 K, cooling-water ΔT reaching 5 K, and the staging table followed at part load. Only then examine chiller approach, refrigerant charge and tower distribution.

Roof cooling towers and shoulder-season free cooling: the constraints that decide staging

Most staging sequences stop at the chiller room. Two site constraints decide whether the sequence can actually deliver its calculated efficiency: the roof cooling towers, and the hours when the chillers can be switched off altogether.

Check Design rule Consequence if missed
Tower spacing 1.0–1.5 times tower width between cells; at least 2 times width from a wall or louver; outlet above the roof surface Recirculation raises the entering wet-bulb by 1–2 K and plant energy by 3–5%
Drift 0.05–0.1% of 1,946 m³/h, or 1–2 m³/h; high-efficiency eliminator below 0.02% Plume settles on facades and cars within 30–50 m, leaving water marks and scale
Noise 75–85 dB(A) at 1 m; 50–55 dB(A) at the property boundary at night; at least 20 m from homes Fan speed at 60–70% cuts 6–8 dB(A) but raises water temperature by 1–2 K
Makeup water Evaporation about 1.5% (29 m³/h), drift 1–2 m³/h, blowdown 8–10 m³/h; total 38–41 m³/h About 900 m³/day must be available before commissioning, not after
Free cooling Outdoor enthalpy at least 5 kJ/kg below indoor; tower supply usable when wet-bulb is below 8 °C 25–35% of nominal capacity, or 2,400–3,300 kW on a 9,600 kW plant, is lost

Tower layout is not a cosmetic issue. A cell that inhales its neighbor’s plume loses the very wet-bulb advantage the staging sequence assumes. Fix the spacing and the drift eliminator before optimizing the chiller sequence; otherwise the control system will keep adding machines to compensate for a roof problem.

Shoulder-season free cooling has two separate paths. The fresh-air path is driven by enthalpy, not dry-bulb: when outdoor enthalpy is at least 5 kJ/kg below the indoor value, open the fresh-air damper and let the air-side system carry the internal load. The tower path needs a wet-bulb below 8 °C; a plate exchanger can then deliver 12–14 °C water at 25–35% of nominal capacity. In a temperate humid climate, the two paths can cover 2,500–3,500 hours a year. Add automatic changeover, a low-temperature trip on the tower sump and a flow switch on the plate exchanger so a stopped pump cannot freeze the block. Longcom’s water chiller page covers the condenser and free-cooling interfaces.

Common questions

What plant size does an 80,000 m² mall need?

At 120 W/m², 9,600 kW, with four 2,500 kW centrifugal chillers. If dining exceeds 15% of area, or the mall includes an ice rink or cinema, raise the index to 140–160 W/m²; total cooling rises by 1,600–3,200 kW and five machines may be needed.

Is fresh air really 30–40% of the load?

At weekend peak, yes. 20,000 people at 20 m³/h with a 20 kJ/kg enthalpy difference gives 2,670 kW, 28% of 9,600 kW; adding infiltration and make-up brings it to 32%. At half occupancy on a weekday, it falls to 18–20%, so the fresh-air damper must follow occupancy.

Can 6/13 °C be used with existing terminals?

Not directly. Existing coils designed for 5 K lose 3–6% capacity when flow falls by 29%, and the hottest week will be short. Check coil rows and face velocity first; if they cannot recover the loss, apply large temperature difference only to fresh-air units and internal air handlers, and keep hotel rooms and cinemas at 5 K.

Is one chiller enough at night?

Yes. Night load is about 15% of daytime, or 1,440 kW, and one 2,500 kW machine runs at 58%. But the water system must be zoned so that only trading tenants receive cooling. With one loop, actual load can exceed 3,000 kW, and one machine is not enough while two are wasteful.

Can tower drift affect nearby residences?

Yes. At 0.05–0.1% drift, 1–2 m³/h of plume settles within 30–50 m and leaves marks on glazing and cars. If towers are within 20 m of residences, use high-efficiency eliminators and adjust discharge direction to bring drift below 0.02%.

Why does a plant designed for SCOP 5.2 measure 4.2?

Usually not the chillers. Check whether chilled-water ΔT reaches 7 K, cooling-water ΔT reaches 5 K, and the part-load staging table is followed. Any one failure can reduce SCOP by 15–20%. If all three are correct, check chiller approach and tower distribution.

How do I zone a mall?

Zone by tenant type, occupancy schedule and pipe distance. Anchor tenants and food courts have different hours. A single loop forces every zone to the worst condition; separate loops or valves let you reset and stage.

What staging sequence saves energy?

Run the fewest chillers that meet the load, reset the supply temperature, and use the tower to lower condensing temperature. Stage with measured capacity and a dead band. Avoid starting a second chiller for a short peak.